Design Consideration:
- Depth of Excavation
- Type of Soil
- Water Table
- Adjacent Structure / Site Constraints
- Sequence of Works
- Excavation Methodology
Complex Basement Construction in Very Congested Urban Environtment - Construction Details
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
1
11/12/2014
Construction Method
Where to install the 1st slab
Sequence of
Work
Choice of
LL for Working Platform Depends on
King-Post
Equipment And Method of Work
Strutting
System
Installing the Kingpost
Load Path
Casting Concrete under the Slab
Connect RC Slab to Kingpost
Steel Rebar Passing Through Kingpost
Soil Removal: Skip Floor or Not? Construction Holes?
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
Soil Removal
Soil Removal
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
WTC-2
Mosque
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
2
11/12/2014
WM-1
Bored-piles φ1200 mm
without kingpost
WTC-2
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
COMPRESSION TENSION
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
3
11/12/2014
Connection Detail:
The Details Kingpost to Slab
Use of CAD/CAM
to help the Design Process
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
Work on Progress:
Preparation Work for B-1 Slab
(Working Platform)
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
Project High water table, 1.5 – 2.0 meters below the surface
Location
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
4
11/12/2014
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
5
11/12/2014
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
Horizontal Deflection Bending Moment Shear Force "A"-side : Adjacent to Existing Plaza Indonesia (Without Temporary Strut)
Horizontal Deflection Bending Moment Shear Force
0 0 0
0 0 0 0
Excav. To 3.7m (EL. -0.35m)
-5 -5 -5
-5 -5 -5
-5 Bending Moment
-10 -10 -10 B1 and Excav. To 6.7m (-3.35m)
-10 -10 -10 Min ≅ -63.5 ton.m/m
-10
Max ≅ 64.0 ton.m/m
-15 -15 -15
Depth (m)
Depth (m)
Depth (m)
B2 and Excav. To 9.7m (-6.35m)
-15 -15 -15
Depth (m)
Depth (m)
Depth (m)
Depth (m)
-20 -20 -20 B3 and Excav. To 12.7m (-9.35m)
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
6
11/12/2014
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
-5 -5
-10 -10
-15 -15
Depth (m)
Depth (m)
-20 -20
1st
Step
-25
-25
-30
-30
Final
Step
-35
-35
0 10 20 30 40 50
-80 -60 -40 -20 0 20 40 60 80
D-Wall Horz. Deflection (mm )
Envelope of D-Wall Be nding Mom ent (ton.m /m )
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
-5 -5
-10 -10
-15 -15
Depth (m)
Depth (m)
1st
-20 -20 Step
-25 -25
Final
-30 -30
Step
IA-1 IB-3
-35 -35
-80 -60 -40 -20 0 20 40 60 80 0 10 20 30 40 50
7
11/12/2014
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
Jan2008
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
8
11/12/2014
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers DAVYSUKAMTA & PARTNERS, Structural Engineers
Installation of King-Post
TAHAP 1
9
11/12/2014
TAHAP 3
Starter Bars
10
11/12/2014
Strutting
the Hole
11
11/12/2014
TAHAP 5
12
11/12/2014
13