WASHOUT VALVE CHAMBER AIR RELEASE VALVE CHAMBER

GHE

250

250
A A B B PROJECT

1100
MASTER PLANNING,
GRP/RTR INFRASTRUCTURE &

1100
GRP/RTR
GRP/RTR GRP/RTR RESIDENTIAL DESIGN FOR
SOCIAL HOUSING PROJECT AT
300 x 300 x 100 DEEP
D.I ROCKER PIPE EAST SITRA
H.D. C.I. Cover & Frame 300 x 300 x 100 FLEXIBLE COUPLING
SUMP 600X600 Clear Opening DEEP SUMP CLIENT
H.D. C.I. COVER & FRAME

250

250
600X600 Clear Opening

250 1100 250 250 250


1100

PLAN PLAN
N.T.S. N.T.S.

CONSULTANT ENGINEER
GULF HOUSE ENGINEERING
H.D. C.I. Cover & Frame Concrete Surround Architects & Engineers

H.D. C.I. Cover & Frame With GRP Sealing Plate Non-Paved Areas MANAMA, KINGDOM OF BAHRAIN.
Concrete Surround TEL +973 17 822666 FAX +973 17 820666
With GRP Sealing Plate LIC. NO. EPP/BN/105
Non-Paved Areas www.ghe.com.bh
BAS accredited ISO 9001, ISO 14001
and OHSAS 18001 Company

600 COST CONSULTANT


Waterproofing Membrane &
Protection Board

H=INVERT LEVEL + 300mm


600
Waterproofing Membrane & C.I. Steps
Protection Board
C.I. Steps Flanged Adapter INFRASTRUCTURE CONSULTANT

H=INVERT LEVEL + 550mm


Dismantling Joint Flanged Adapter Dismantling Joint
Flexible Coupling Integral Puddle Flange
Flexible Coupling
D.I Rocker Pipe 300 300
Integral Puddle Flange TRAFFIC IMPACT CONSULTANT
D.I Rocker Pipe 300 300 300
GRP/RTR D.I Pipe GRP/RTR

GRP/RTR D.I Pipe GRP/RTR


300 300 NOTE
D.I Rocker Pipe 300 300 1. THIS DRAWING IS THE PROPERTY OF :
550

Invert Level

300
GULF HOUSE ENGINEERING, Architects, Engineers
Flexible Coupling Invert Level
Concrete Support D.I Rocker Pipe 2. REPRODUCING ITS CONTENTS IN ANY FORM EXCEPT FOR THE
Concrete Benching Concrete Support PURPOSE OF WHICH IT IS INTENDED, IS PROHIBITED.
Flexible Coupling
3. THIS DRAWING IS NOT TO BE SCALED, STATED DIMENSIONS

300
300 x 300 x 100 DEEP Ø80 90° ELBOW ARE ONLY TO BE CONSIDERED.

300
300 x 300 x 100 Waterproofing Membrane
SUMP Ø80 GATE VALVE 4. ALL DIMENSIONS ARE TO BE VERIFIED ON SITE AS PER
DEEP SUMP ACTUAL SITE CONDITION PRIOR TO COMMENCEMENT OF ANY
CONSTRUCTION WORK.
Waterproofing Membrane 5. ANY DISCREPANCIES IN DIMENSIONS & OR INFORMATION
100 250 1100 250 100 SHOULD BE BROUGHT TO THE ATTENTION OF THE
100 250 1100 250 100 CONSULTANT IN WRITING.
6. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ID,
Blinding thickness 50mm STRUCTURAL, MEP AND INFRASTRUCTURE DRAWINGS etc.
Blinding thickness 50mm Soil Compaction as per Standards 7. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
Soil Compaction as per Standards SPECIFICATIONS, CONDITIONS OF CONTRACT, etc.
8. CONTRACTOR SHOULD CO-ORDINATE ALL WORKS WITH THE

SECTION A-A SECTION B-B ID ,STRUCTURAL, MEP, LANDSCAPE, INFRASTRUCTURE etc.


DRAWINGS.

N.T.S. ISSUE / REVISION


N.T.S.

B 02-10-2022 Revised Issue HC MK


A 17-05-2022 Initial Issue HC MK

REV DATE DESCRIPTION BY CHK'D

Y12@150 N
Y12@150 KEY PLAN

V3 V4

600 600
V5
V2

H=INVERT LEVEL + 300mm


H=INVERT LEVEL + 550mm

Y12@150 Y12@150 Y12@150 V1

V6 V7

D.I Pipe SHEET TITLE


TSE NETWORK

300
WASHOUT VALVE CHAMBER
300

300
DETAILS
CONCEPT SCHEMATIC MUNICIPAL
100 250 1100 250 100
DETAIL DESIGN TENDER FOR CONSTRCUTION
100 250 1100 250 100
Blinding thickness 50mm
SCALE NTS A0
FILE NAME:

WHEN PRINTED AT SHEET SIZE


Blinding thickness 50mm

DRAWN BY CHECKED BY APPROVED BY DESIGNED BY

HC MK SM AB
SECTION A-A (RCC DETAIL) SECTION B-B (RCC DETAIL)
ISSUE DATE PROJECT NO DRAWING NO REV
N.T.S. N.T.S.
MAY, 2022 W1042 BL-W1042-UTI-CIV-IRR-23-403 B