MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Transmittal AAHK-TRANSMIT-001305 SFKC-TRANSMIT-000863

Re: SFK/3403/M/0591/C Material Submission for Seawater Supply System - PE


Pipe

From Ms Winnie Chu - Airport Authority

To (3) Ms Winnie Chu - Airport Authority

Mr Andy Ho - Airport Authority

Ms Alice Leung - Sun Fook Kong Construction Ltd

Cc (13) Ms Hazel But - AECOM Asia Company Limited

Matthew Chan - AECOM Asia Company Limited

Ian Ng - AECOM Asia Company Limited

Johnson Wong - AECOM Asia Company Limited

Clara Sin - Airport Authority

Mr Johnny Chan - Airport Authority

Mr Dennis Leong - Airport Authority

Mr Jack Li - Maunsell Aecom

Mr Eric Tang - Sun Fook Kong Construction Ltd

Mr CK Chow - Sun Fook Kong Construction Ltd

Mr Felix Ho - Sun Fook Kong Construction Ltd

Mr Andy Cheng - Sun Fook Kong Construction Ltd

Mr Gordon Pang - Sun Fook Kong Construction Ltd

Sent Tuesday, 12 May 2020

Reason Issued for Construction

DETAILS

Discipline Civil - Utilities

Transmittal Type Contractor Submission

Submission Number SFK/3403/M/0591/C

Submission Response (AA B- No-Objection subj. to comments,resub


reply)

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 1/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

MESSAGE

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION

RESPONSE:

Submission for Review A -Notice of No-Objections

(Ref. GS 18.4)

B -Notice of No-Objection subject to B

comments,(please resubmit)

C -Notice of Objection, please resubmit

Submission for Permission or Consent D -Notification of Permission or Consent

(Ref GS 18.5)

E -Notification of Permission or Consent

subject to compliance with conditions;

please confirm acceptance of conditions

F -Permission or Consent withheld

Submission for information R -Submission acknowledged

COMMENTS:

The acceptance is subject to the compliance of manufacturer particulars and workmanship requirements in
GMWS.

From: A Leung
Sent: 08/04/2020 3:38:41 PM HKT (GMT +08:00)
To: Winnie Chu, Andy Ho
Cc: Matthew Chan, Ian Ng, Johnson Wong, Leo WOO, Johnny Chan, Dennis Leong, Clara Sin, Jack Li, Andy Cheng, CK Chow, Felix Ho, Gordon
Pang, Eric Tang
Mail Number: SFKC-TRANSMIT-001155
Subject: SFK/3403/M/0591/C Material Submission for Seawater Supply System - PE Pipe

Discipline: Civil - Utilities


Transmittal Type: Contractor Submission
Submission
SFK/3403/M/0591/C
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 2/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

CONTRACTOR’S SUBMISSION

Contract 3403 New Integrated Airport Centres

- Building and Civil Works

TITLE: Material Submission for Seawater Supply System - PE Pipe

SUBMISSION NUMBER: SFK/3403/M/0591 Rev.C

SPECIFICATION REFERENCE : AGMWS APPENDIX A14.8

DRAWING REFERENCE : NA

DESCRIPTION OF CONTENTS :
We further submit herewith the information regarding the PE pipe for Seawater Supply System and our
response to comments as listed below for your review and approval.

1. Please refer to Appendix A regarding our proposed PE pipes to be used in the seawater supply
system.
2. Please refer to Appendix B for the proposed independent inspection authority.
3. The origin of the material is Germany.
4. Please refer to Appendix C for pigment dispersion, material density and slow crack growth test
reports.
5. We noted that there is no job reference under HKIA project of pipes being used in
underground. However, the proposed PE pipe have been used and approved under CEDD, ASD,
WSD and DSD projects. Please refer to Appendix D for job reference and approval letters.
6. Noted.
7. Please refer to Appendix E regarding the test results for the multi-coloured pipes.

Remarks :

Originator: Gordon Pang Contractor’s Name

Reviewed by: Alice Leung Sun Fook Kong Construction Limited

Date: 08 Apr 2020

From: W Chu
Sent: 02/04/2020 7:13:54 PM HKT (GMT +08:00)
To: Winnie Chu, Andy Ho, Alice Leung
Cc: Matthew Chan, Ian Ng, Johnson Wong, Leo WOO, Johnny Chan, Dennis Leong, Clara Sin, Jack Li, Andy Cheng, Ryan Cheuk, CK Chow, Felix
Ho, Eric Tang
Mail Number: AAHK-TRANSMIT-001092
Subject: Re: SFK/3403/M/0591/B Material Submission for Seawater Supply System - PE Pipe

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 3/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

Discipline: Civil - Utilities


Transmittal Type: Contractor Submission
Submission
SFK/3403/M/0591/B
Number:
Submission
Response (AA C -Notice of Objection, please resubmit
reply):

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION

RESPONSE:

Submission for Review A -Notice of No-Objections

(Ref. GS 18.4)

B -Notice of No-Objection subject to

comments,(please resubmit)

C -Notice of Objection, please resubmit C

Submission for Permission or Consent D -Notification of Permission or Consent

(Ref GS 18.5)

E -Notification of Permission or Consent

subject to compliance with conditions;

please confirm acceptance of conditions

F -Permission or Consent withheld

Submission for information R -Submission acknowledged

COMMENTS:

1. Please clarify which your proposed PE pipes to be used in the seawater supply system.
2. Refer to GMWS 14.4.1, please submit the particulars of the proposed independent inspection
authority.
3. Please state the origin of material.
4. For pigment dispersion, material density and slow crack growth test, the test results are still
missing.(only testing criteria is presented in the documents).
5. There is no job reference at the airport for the pipes being used for underground pipe system.
6. Please be reminded to ensure the compatibility of the material to the existing system.
7. Please submit the test results separately for the multi-coloured pipes proposed as stated in
AGMWS A14.8.4(j)

From: A Leung
Sent: 06/03/2020 6:22:53 PM HKT (GMT +08:00)
To: Winnie Chu, Andy Ho
Cc: Matthew Chan, Ken Leung, Ian Ng, Johnson Wong, Leo WOO, Johnny Chan, Dennis Leong, Clara Sin, Jack Li, Andy Cheng, Ryan Cheuk, CK
Chow, Felix Ho, Eric Tang

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 4/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

Mail Number: SFKC-TRANSMIT-000926


Subject: SFK/3403/M/0591/B Material Submission for Seawater Supply System - PE Pipe

Discipline: Civil - Utilities


Transmittal Type: Contractor Submission
Submission
SFK/3403/M/0591/B
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

CONTRACTOR’S SUBMISSION

Contract 3403 New Integrated Airport Centres

- Building and Civil Works

TITLE: Material Submission for Seawater Supply System - PE Pipe

SUBMISSION NUMBER: SFK/3403/M/0591 Rev.B

SPECIFICATION REFERENCE : AGMWS APPENDIX A14.8

DRAWING REFERENCE : N/A

DESCRIPTION OF CONTENTS :
We would like to propose the following PE pipe for seawater supply system for your review and approval.

Brand: Gerodur

Manufacturer: Gerodur MPM Kunststoffverarbeitung GmbH & Co KG

Supplier: Eternity (P&D Products) Co., Ltd

Here are the reply to comments:

1. Comply List has been added to the page 2 of this submission.

2. The required information has been added with certificates and standards.

3. The requirement have been highlighted in the submission.

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 5/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

Remarks :

Originator: Ryan Cheuk Contractor’s Name

Reviewed by: Alice Leung Sun Fook Kong Construction Limited

Date: 5 Mar 2020

From: W Chu
Sent: 28/02/2020 5:14:09 PM HKT (GMT +08:00)
To: Winnie Chu, Andy Ho, Alice Leung
Cc: Matthew Chan, Ken Leung, Ian Ng, Johnson Wong, Leo WOO, Johnny Chan, Dennis Leong, Clara Sin, Jack Li, Andy Cheng, Ryan Cheuk, CK
Chow, Felix Ho, Eric Tang
Mail Number: AAHK-TRANSMIT-000862
Subject: Re: SFK/3403/M/0591/A Material Submission for Seawater Supply System - PE Pipe

Discipline: Civil - Utilities


Transmittal Type: Contractor Submission
Submission
SFK/3403/M/0591/A
Number:
Submission
Response (AA C -Notice of Objection, please resubmit
reply):

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION

RESPONSE:

Submission for Review A -Notice of No-Objections

(Ref. GS 18.4)

B -Notice of No-Objection subject to

comments,(please resubmit)

C -Notice of Objection, please resubmit C

Submission for Permission or Consent D -Notification of Permission or Consent

(Ref GS 18.5)

E -Notification of Permission or Consent

subject to compliance with conditions;

please confirm acceptance of conditions

F -Permission or Consent withheld

Submission for information R -Submission acknowledged

COMMENTS:

1. Please add a table to summarize the compliance to specification. You may refer to the sample
below:

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 6/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

2. The following test results are missing: Material density, pigment dispersion and slow crack growth
test.

3. Please highlight in the catalogue and report for the proposed items.

From: A Leung
Sent: 28/02/2020 9:24:46 AM HKT (GMT +08:00)
To: Winnie Chu, Andy Ho
Cc: Matthew Chan, Ken Leung, Ian Ng, Johnson Wong, Leo WOO, Johnny Chan, Dennis Leong, Clara Sin, Jack Li, Andy Cheng, Ryan Cheuk, CK
Chow, Felix Ho, Eric Tang
Mail Number: SFKC-TRANSMIT-000863
Subject: SFK/3403/M/0591/A Material Submission for Seawater Supply System - PE Pipe

Discipline: Civil - Utilities


Transmittal Type: Contractor Submission
Submission
SFK/3403/M/0591/A
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

CONTRACTOR’S SUBMISSION

Contract 3403 New Integrated Airport Centres

- Building and Civil Works

TITLE: Material Submission for Seawater Supply System - PE Pipe

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 7/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

SUBMISSION NUMBER: SFK/3403/M/0591 Rev.A

SPECIFICATION REFERENCE : AGMWS APPENDIX A14.8

DRAWING REFERENCE : N/A

DESCRIPTION OF CONTENTS :
We would like to submit herewith the information of PE pipe for seawater supply system for your review and
approval.

Remarks :

Originator: Ryan Cheuk Contractor’s Name

Reviewed by: Alice Leung Sun Fook Kong Construction Limited

Date: 27 Feb 2020

This mail was prepared by R Cheuk

This mail was prepared by C Sin

This mail was prepared by R Cheuk

This mail was prepared by C Sin

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 8/9
9/7/2020 https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923

This mail was prepared by G Pang

This mail was prepared by C Sin

https://hk1.aconex.com/rsrc/20200805.0718/en_AU_DOC/mail/view/index.html#/1073773192/1105978923 9/9
2022/3/7 下午6:30 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Transmittal AAHK-TRANSMIT-006442 BCJV-TRANSMIT-006321

Re: BCJV-3408-M-00947A [FW] Material Submission – HDPE Pipe and Fitting for
Sewerage System (Eternity) [CS]

From Mr Patrick Cheng - Airport Authority

To Feng Du - BUCG-CCCL Joint Venture

Cc
(26) C3408 Aedas - Aedas Ltd.

Mr Benny Fung - Airport Authority

Mr Kyle H F Tse - Airport Authority

Mr H S Chan - Airport Authority

Mr Benny Yu - Airport Authority

Mr Swire Lee - Airport Authority

Mr Lonald Chow - Airport Authority

Mr Joshua Yiu - Airport Authority

Mr Oscar Chiu - Airport Authority

Mr Benly Chan - Airport Authority

Mr K K Tam - Airport Authority

Mr Joseph Chung - Airport Authority

Mr Peter Lau - Airport Authority

Mr C K Cheung - Airport Authority

Mr Ivan Lee - Airport Authority

Mr Raymond Tong - Airport Authority

Mr Daniel Teoh - Airport Authority

Mr Samuel Yeung - Airport Authority

Mr Patton Ng - Airport Authority

Ms Abbe Lau - BUCG-CCCL Joint Venture

Mr Brian Lam - BUCG-CCCL Joint Venture

Mr Bandson Li - Black & Veatch Hong Kong Limited

Mr Glenn Chan - Black & Veatch Hong Kong Limited

Mr Aries Yeung - Black & Veatch Hong Kong Limited

Mr Tom Cheung - Black & Veatch Hong Kong Limited

Mr Frankie Ma - Black & Veatch Hong Kong Limited

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380889%26CORRESPONDENCE_MAI… 1/4
2022/3/7 下午6:30 Aconex

Sent Monday, 7 March 2022

Reason Issued for Construction


DETAILS

Transmittal Type Contractor's Submission 

Location Airfield 

Discipline Civil & Structural 

Submission Number BCJV-3408-M-00947A 

Submission Response A -Notice of No-Objections 


(AA reply)


MESSAGE

CONTRACT 3408
THIRD RUNWAY CONCOURSE
AND APRON WORKS

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION


RESPONSE:
(Remarks: “X” denotes status of PM’s reply to this Contractor’s submission)
Submission for
review
“A – Notice of No-Objection” X

(Ref. G.S. 18.3.2)


“B – Notice of No-Objection
subject to comments, please  
resubmit”

“C – Notice of Objection,
 
please resubmit”

Submission for “D – Notification of


permission or  
Permission or Consent”
consent

“E – Notification of
(Ref. G.S. 18.4.2)
Permission or Consent
subject to compliance with  
conditions, please confirm
acceptance of conditions”

“F – Permission or Consent
 
withheld”

Submission for “R – Submission


information  
acknowledged”

COMMENT(S):
 

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380889%26CORRESPONDENCE_MAI… 2/4
2022/3/7 下午6:30 Aconex

From: F Du

Sent: 29/01/2022 2:03:26 PM HKT (GMT +08:00)

To: Patrick Yip

Cc: C3408 Aedas, Benly Chan, H S Chan, C K Cheung, Oscar Chiu, Lonald Chow, Joseph Chung, Benny Fung, Peter Lau,
Ivan Lee, Swire Lee, Patton Ng, K K Tam, Daniel Teoh, Raymond Tong, Samuel Yeung, Joshua Yiu, Benny Yu, Glenn Chan,
Tom Cheung, Bandson Li, Frankie Ma, Aries Yeung, Brian Lam, Abbe Lau

Mail Number: BCJV-TRANSMIT-006321

Subject: BCJV-3408-M-00947A [FW] Material Submission – HDPE Pipe and Fitting for Sewerage System (Eternity) [CS]

 
Transmittal
Contractor's Submission
Type:
Location: Airfield
Discipline: Civil & Structural
Submission
BCJV-3408-M-00947A
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

 
   
To:  CONTRACT 3408
Project Manager’s
THIRD RUNWAY
Representative
CONCOURSE AND APRON
 
WORKS
CONTRACTOR’S SUBMISSION FORM
SPECIFICATION REFERENCE :  

DRAWING REFERENCE :  
 
DESCRIPTION OF CONTENTS :
We would like to submit herewith the Material Submission – HDPE Pipe and Fitting for Sewerage System
(Eternity) for your review/approval.

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380889%26CORRESPONDENCE_MAI… 3/4
2022/3/7 下午6:30 Aconex

 Remarks:
 
 
 

From : Contractor’s Representative


 
Name : DU Feng
 

BUCG-CCCL JV
 
 

此邮件已由A Lau 准备
 

This mail was prepared by B Yu

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380889%26CORRESPONDENCE_MAI… 4/4
2022/3/7 下午6:30 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Transmittal AAHK-TRANSMIT-006444 BCJV-TRANSMIT-006320

Re: BCJV-3408-M-00946A [PWFH][SW] Material Submission – HDPE Pipe and


Fitting for Potable Water Supply and Fire Hydrant System, and Seawater Supply
System (Eternity) [CS]

From Mr Patrick Cheng - Airport Authority

To Feng Du - BUCG-CCCL Joint Venture

Cc
(26) C3408 Aedas - Aedas Ltd.

Mr Benny Fung - Airport Authority

Mr Kyle H F Tse - Airport Authority

Mr H S Chan - Airport Authority

Mr Benny Yu - Airport Authority

Mr Swire Lee - Airport Authority

Mr Lonald Chow - Airport Authority

Mr Joshua Yiu - Airport Authority

Mr Oscar Chiu - Airport Authority

Mr Benly Chan - Airport Authority

Mr K K Tam - Airport Authority

Mr Joseph Chung - Airport Authority

Mr Peter Lau - Airport Authority

Mr C K Cheung - Airport Authority

Mr Ivan Lee - Airport Authority

Mr Raymond Tong - Airport Authority

Mr Daniel Teoh - Airport Authority

Mr Samuel Yeung - Airport Authority

Mr Patton Ng - Airport Authority

Ms Abbe Lau - BUCG-CCCL Joint Venture

Mr Brian Lam - BUCG-CCCL Joint Venture

Mr Bandson Li - Black & Veatch Hong Kong Limited

Mr Glenn Chan - Black & Veatch Hong Kong Limited

Mr Aries Yeung - Black & Veatch Hong Kong Limited

Mr Tom Cheung - Black & Veatch Hong Kong Limited

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380234%26CORRESPONDENCE_MAI… 1/4
2022/3/7 下午6:30 Aconex

Mr Frankie Ma - Black & Veatch Hong Kong Limited

Sent Monday, 7 March 2022

Reason Issued for Construction


DETAILS

Transmittal Type Contractor's Submission 

Location Airfield 

Discipline Civil & Structural 

Submission Number BCJV-3408-M-00946A 

Submission Response A -Notice of No-Objections 


(AA reply)


MESSAGE

CONTRACT 3408
THIRD RUNWAY CONCOURSE
AND APRON WORKS

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION


RESPONSE:
(Remarks: “X” denotes status of PM’s reply to this Contractor’s submission)
Submission for
review
“A – Notice of No-Objection” X

(Ref. G.S. 18.3.2)


“B – Notice of No-Objection
subject to comments, please  
resubmit”

“C – Notice of Objection,
 
please resubmit”

Submission for “D – Notification of


permission or  
Permission or Consent”
consent

“E – Notification of
(Ref. G.S. 18.4.2)
Permission or Consent
subject to compliance with  
conditions, please confirm
acceptance of conditions”

“F – Permission or Consent
 
withheld”

Submission for “R – Submission


information  
acknowledged”

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380234%26CORRESPONDENCE_MAI… 2/4
2022/3/7 下午6:30 Aconex

COMMENT(S):
 

From: F Du

Sent: 29/01/2022 1:38:54 PM HKT (GMT +08:00)

To: Patrick Cheng

Cc: C3408 Aedas, Benly Chan, H S Chan, C K Cheung, Oscar Chiu, Lonald Chow, Joseph Chung, Benny Fung, Peter Lau,
Ivan Lee, Swire Lee, Patton Ng, K K Tam, Daniel Teoh, Raymond Tong, Samuel Yeung, Joshua Yiu, Benny Yu, Glenn Chan,
Tom Cheung, Bandson Li, Frankie Ma, Aries Yeung, Brian Lam, Abbe Lau

Mail Number: BCJV-TRANSMIT-006320

Subject: BCJV-3408-M-00946A [PWFH][SW] Material Submission – HDPE Pipe and Fitting for Potable Water Supply and
Fire Hydrant System, and Seawater Supply System (Eternity) [CS]

 
Transmittal
Contractor's Submission
Type:
Location: Airfield
Discipline: Civil & Structural
Submission
BCJV-3408-M-00946A
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

 
   
To:  CONTRACT 3408
Project Manager’s
THIRD RUNWAY
Representative
CONCOURSE AND APRON
 
WORKS

CONTRACTOR’S SUBMISSION FORM


SPECIFICATION REFERENCE :  

DRAWING REFERENCE :  
 
DESCRIPTION OF CONTENTS :
We would like to submit herewith the Material Submission – HDPE Pipe and Fitting for Potable Water
Supply and Fire Hydrant System, and Seawater Supply System (Eternity) for your review/approval.

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380234%26CORRESPONDENCE_MAI… 3/4
2022/3/7 下午6:30 Aconex

 Remarks:
 
 
 

From : Contractor’s Representative


 
Name : DU Feng
 

BUCG-CCCL JV
 
 

此邮件已由A Lau 准备
 

This mail was prepared by B Yu

https://hk1.aconex.com/Logon?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1115380234%26CORRESPONDENCE_MAI… 4/4
2021/6/4 Aconex

Contract C20W03 SEWERAGE UPGRADING WORKS – SPS1 AND ASSOCIAT


Hong Kong International Airport
Lantau
Hong Kong 999077 China (Hong Kong)

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Transmittal AAHK-TRANSMIT-000139 CHE/C20W03/M/00065

PMR's reply: CHE/C20W03/M/00065 - SUBMISSION OF PROPOSE


POLYETHYLENE PIPES AND FITTINGS

From Mr MARK C K CHING - Airport Authority

To Mr Philip Lam - China Harbour Engineering (HK) Company Limited

Cc (31) Mr Stephen Lai - Airport Authority

Ms Becky Yan - Airport Authority

Mr Anson Mak - Airport Authority

Ms Ruby Tsang - Airport Authority

Mr Jonathan Chow - Airport Authority

Mr Ricky Chan - Airport Authority

Marco Tsang - Airport Authority

Ms Josie Lau - Airport Authority

Ms Sandy Yu - Airport Authority

Mr Nicolas CHAN - Airport Authority

Mr Calvin Fung - Airport Authority

Mr Kelvin Yeung - Airport Authority

Mr Ryan Mak - Airport Authority

Mr Mo M H Yeung - Airport Authority

Ms Nicola S I Kuong - Airport Authority

Joe W K Lee - Airport Authority

Mr Michael Yim - Airport Authority

Mr Kelvin H C Yu - Airport Authority

Ms H W Wong (CWD) - Airport Authority

Mr Rex S H Tang - Airport Authority

Penny N T Yiu - Airport Authority

Mrs FIONA F N TAI - Airport Authority

Ms KAREN S P CHOI - Airport Authority

Mr Ivan C K Li - Airport Authority

Mr Samuel Chung - China Harbour Engineering (HK) Company Limited

Mr Andy Lai - China Harbour Engineering (HK) Company Limited

https://hk1.aconex.com/Logon 1/4
2021/6/4 Aconex

Pinky Lam - China Harbour Engineering (HK) Company Limited

Rosina Hau - China Harbour Engineering (HK) Company Limited

Eric Pang - China Harbour Engineering (HK) Company Limited

Mr Calvin Lin - China Harbour Engineering (HK) Company Limited

Phillip Leung - China Harbour Engineering (HK) Company Limited

Sent Thursday, 3 June 2021

DETAILS

Discipline Civil - General

Area New sewage rising mains

Submission number CHE/C20W03/M/00065/A

Submission Response B1- No-Objection subj. to comments,resub


(AA reply)

MESSAGE

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION

TITLE OF SUBMISSION: CHE/C20W03/M/00065 - SUBMISSION OF PROPOSE POLYETHYLENE


PIPES AND FITTINGS
SUBMISSION NUMBER: CHE/C20W03/M/00065
RESPONSE:
Submission for Review
A -Notice of No-Objections
(Ref. GS 18.4)
B1- No-Objection subj. to B1
comments,resub
B2- Subj. to comments,resub not
required
C -Notice of Objection, please
resubmit
Submission for Permission or D -Notification of Permission or
Consent Consent
(Ref GS 18.5)
E -Notification of Permission or
Consent subject to compliance with
conditions; please confirm acceptance
of conditions

F -Permission or Consent withheld


Submission for information R -Submission acknowledged
COMMENTS:

The Factory Approval Certificates on P.56 & P.58 are outdated. Please provide.

AA DISTRIBUTION: From: PM’s Representative Contractor’s Stamp


File Ref:
Name Action Info
Name: Mark Ching

Date: 3 Jun 2021


https://hk1.aconex.com/Logon 2/4
2021/6/4 Aconex

From: P Lam
Sent: 12/04/2021 7:33:30 PM HKT (GMT +08:00)
To: MARK C K CHING
Cc: Nicolas CHAN, Ricky Chan, KAREN S P CHOI, Jonathan Chow, Calvin Fung, Nicola S I Kuong, Stephen Lai, Josie Lau,
Joe W K Lee, Ivan C K Li, Anson Mak, Ryan Mak, FIONA F N TAI, Rex S H Tang, Marco Tsang, Ruby Tsang, H W Wong
(CWD), Becky Yan, Kelvin Yeung, Mo M H Yeung, Michael Yim, Penny N T Yiu, Kelvin H C Yu, Sandy Yu, Samuel Chung,
Rosina Hau, Andy Lai, Pinky Lam, Phillip Leung, Calvin Lin, Eric Pang
Mail Number: CHE/C20W03/M/00065
Subject: CHE/C20W03/M/00065 - SUBMISSION OF PROPOSE POLYETHYLENE PIPES AND FITTINGS

Discipline: Civil - General


Area: New sewage rising mains
Submission
CHE/C20W03/M/00065/A
number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

To: Mr. Mark Ching CONTRACT C20W03


Project Manager’s SEWERAGE UPGRADING
Representative WORKS SPS1 AND
ASSOCIATED SEWERAGE
SYSTEMS

CONTRACTOR’S SUBMISSION

TITLE OF SUBMISSION : SUBMISSION OF PROPOSE POLYETHYLENE PIPES AND


FITTINGS
SUBMISSION NUMBER : CHE/C20W03/M/00065/A

https://hk1.aconex.com/Logon 3/4
2021/6/4 Aconex

SPECIFICATION REFERENCE : GMWS Volume 1, Section 14.4.2


DRAWING REFERENCE : ACM/P282/RD/RDL/D/DR/6100021A
DESCRIPTION OF CONTENTS :

We would like to submit herewith the particulars of proposed GFD pipes and fittings supplied by “Eternity
(P&D Products) Co limited” and manufactured by “Shandong DongGhong Pipe Industry Co. Ltd “to the
Sewerage System Construction for your perusal.
The following information is enclosed :
1 Catalog for “GFD” PE100 SDR17 PN10 Pipes and Fittings
2 WSD approval letter
3 Job reference
4 Supplementary information

Remarks : AA Distribution

File Ref.: 15.00/CFR

Name : Action Comments Info

From: CHEC’s Representative

Name : Philip Lam


Signature :

Date:

https://hk1.aconex.com/Logon 4/4
28/09/2020 Aconex

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Transmittal AAHK-TRANSMIT-003745 SAPR-JV-TRANSMIT-003534

SAPR-JV-3303-M-01890A Materials Submission for PE Pipe and Fittings


(Hydraulic Services Installation)

From Mr Andy Ho - Airport Authority

To (3) Mr Andy Li - SAPR-JV (+2 more...)

Cc (36) Ms Winifred Li - AECOM Asia Company Limited (+35 more...)

Sent Monday, 28 September 2020 9:19:16 AM HKT (GMT +08:00)

Reason Issued for Information

Status N/A

DETAILS

Discipline E&M - Hydraulics - General

Transmittal Type Contractor Submission

Submission Number SAPR-JV-3303-M-01890A

Submission Response (AA B- No-Objection subj. to comments,resub


reply)

DOCUMENT ATTACHMENTS (1)

(0 selected)

Document Revision
File Revision Title Status
No Date

SAPR-JV-
Materials Submission for PE Pipe and B-No-Objection subj.
3303-M- A 25/09/2020
Fittings (Hydraulic Services Installation) to comments, resub.
01890

MESSAGE

PROJECT MANAGER'S REPLY TO CONTRACTOR'S SUBMISSION

TITLE OF SUBMISSION: Materials Submission for PE Pipe and Fittings (Hydraulic Services Installation)

SUBMISSION NUMBER: SAPR-JV-3303-M-01890A

https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1107976349&USERID=1074372816 1/4
28/09/2020 Aconex
RESPONSE:
Submission for Review A -Notice of No-Objections
(Ref. GS 18.4)
B1- No-Objection subj. to comments,resub B1
B2- Subj. to comments,resub not required

C -Notice of Objection, please resubmit


Submission for Permission or Consent D -Notification of Permission or Consent
(Ref GS 18.5)
E -Notification of Permission or Consent
subject to compliance with conditions;
please confirm acceptance of conditions

F -Permission or Consent withheld


Submission for information R -Submission acknowledged

COMMENTS:

We have no objection to the proposed “GFD/ China” PE 100 PE pipes & fittings and “Lesso/ China” PE 100 PE
pipes accessories for flushing water system use in ARE Store & OF, subject to the followings:

1. Please confirm your compliance in the submitted compliance list and state clearly the reason of
any non-compliance.
2. Electrofusion joint fitting instead of thermo fusion joint fitting shall be provided as per GMWS
clause 95.3.6 (b)(i) requirements. Please check and provide substantiation for your compliance.
3. Please highlight selected fittings size in the catalogue.
4. Please clarify that if socket fusion joint fittings shall only be applied for final connection to sanitary
fitments / fittings to suit the jointing connection.
5. Test certificate and Country of origin for “Lesso” pipes accessories shall be provided.

AA DISTRIBUTION: From: PM’s Representative Contractor’s Stamp


File Ref:
Name Action Info
Name:

From: A Keung
Sent: 16/09/2020 9:58:28 AM HKT (GMT +08:00)
To: Denny Chan, Andy Ho, Jacky Lee, Bill Mar, Mark Mcgleenon, Jayaprasad Nair, David Salisbury, Andrew Keung
Cc: Chi Lai Chan, Frankie Chan, Winifred Li, Cyrus Chan, Renee Cheng, Rocky Cheung, Holman Chui, Bob Lai, Jerald Lai, Maska Lam, David Lee,
Jack Leung, Peggy Leung, Carrie Li, Cassie Shao, Libby Li, Rex Liu, Wendy Tse, Steven Yam, Mike Yim, Wai Chen, Dick Cheng, Jasmine Cheung,
Ray Guan, Akon Kwong, Ka Ho Mok, Sam Situ, Kenny To, Ivy Yuen Chong Tsang, Orion YIU Wai Tao, Joseph Zhang
Mail Number: SAPR-JV-TRANSMIT-003639
Subject: SAPR-JV-3303-M-01890A Materials Submission for PE Pipe and Fittings (Hydraulic Services Installation)

Discipline: E&M - Hydraulics - General


Transmittal Type: Contractor Submission
Submission
SAPR-JV-3303-M-01890A
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1107976349&USERID=1074372816 2/4
28/09/2020 Aconex

CONTRACTOR’S SUBMISSION

SPECIFICATION REFERENCE : General Materials & Workmanship Specification Issue No.5, Volume 3 _
Electrical & Mechanical Works Section 95 – Pipework, Fittings & Valves, page.10/26, clause95.3.6

DRAWING REFERENCE : N/A

DESCRIPTION OF CONTENTS :

Enclosed please find Hydraulic Services Material Submission: PE Pipe and Fittings - “GFD/PRC”
and PE Pipe Accessories – “LESSO/PRC” for your review/approval.

From: A Keung
Sent: 09/09/2020 3:09:53 PM HKT (GMT +08:00)
To: Denny Chan, Andy Ho, Jacky Lee, Bill Mar, Mark Mcgleenon, Jayaprasad Nair, David Salisbury
Cc: Chi Lai Chan, Frankie Chan, Winifred Li, Cyrus Chan, Renee Cheng, Rocky Cheung, Holman Chui, Bob Lai, Jerald Lai, Maska Lam, David Lee,
Jack Leung, Peggy Leung, Carrie Li, Cassie Shao, Libby Li, Rex Liu, Wendy Tse, Steven Yam, Mike Yim, Wai Chen, Dick Cheng, Jasmine Cheung,
Ray Guan, Akon Kwong, Ka Ho Mok, Sam Situ, Kenny To, Ivy Yuen Chong Tsang, Orion YIU Wai Tao, Joseph Zhang
Mail Number: SAPR-JV-TRANSMIT-003534
Subject: SAPR-JV-3303-M-01890A Materials Submission for PE Pipe and Fittings (Hydraulic Services Installation)

Discipline: E&M - Hydraulics - General


Transmittal Type: Contractor Submission
Submission
SAPR-JV-3303-M-01890A
Number:
Submission
Response (AA - To be completed by Airport Authority -
reply):

CONTRACTOR’S SUBMISSION

SPECIFICATION REFERENCE :
General Materials & Workmanship Specification Issue No.5, Volume 3 _ Electrical & Mechanical
Works Section 95 – Pipework, Fittings & Valves, page.10/26, clause95.3.6

DRAWING REFERENCE : N/A

DESCRIPTION OF CONTENTS :

Enclosed please find Hydraulic Services Material Submission: PE Pipe and Fittings - “GFD/PRC”
for your review/approval.

此邮件已由A Keung
准备

https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1107976349&USERID=1074372816 3/4
28/09/2020 Aconex

此邮件已由A Keung 准备

This mail was prepared by A Ho

https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1107976349&USERID=1074372816 4/4