While the National Electrical Code (NEC) requires only a generic label to
warn of the possibility of arc flash danger on all equipment that is subject to
arc flash hazards, NFPA's “Standard for Electrical Safety in the Workplace”
(NFPA 70E-2004) goes a step further, requiring that, “A flash hazard
analysis be done in order to protect personnel from the possibility of being
injured by an arc flash.” This standard also requires that the analysis include
a calculation of the flash protection boundary of each piece of equipment and
determination of the required personal protective equipment (PPE) at the
appropriate working distance for each piece of equipment.
Both NFPA 70E and IEEE 1584, “Guide for Performing Arc-Flash Hazard
Calculations,” prescribe their own methods of calculation for determining
the available arc flash energy at a particular piece of equipment. However,
for both methods, typical working distances are given in Table 3 of IEEE
1584-2002.
There are two distinct mathematical methods of calculating the available arc
flash energy present at a specific piece of equipment — both of which are
detailed in Annex D of NFPA 70E.
The first method, commonly referred to as the NFPA 70E equation for an arc
flash in a cubic box, is:
The cubic box is the commonly used equation (as opposed to the open air
equation) because this equation most accurately approximates the behavior
of an arc flash event within a standard piece of electrical equipment
(switchgear, fused switch, etc.). However, this equation is only valid over the
limited range of conditions where the short-circuit current (F) is between
16kA and 50kA.
Where E is the arc flash energy, En is the normalized arc flash energy, Ia is
the arcing current, Cf is the calculation factor, t is the duration of the arc, D is
the distance from the arc to the person (from IEEE 1584, Table 3), X is the
distance X-factor, k1 and k2 are constants, and G is the conductor air gap.
A more rigorous method of calculating arc flash energy, this set of equations
uses metric units, gives results in Joules per centimeter squared (J/cm2), and
is valid over the range of 0.208kV through 15kV — and a short-circuit
current of 0.7kA through 106kA.
Arc flash energy vs. fault current
Figure 1 (click here to see Fig. 1) shows the relationship between arc flash
energy and bolted fault capacity. Note that this relationship is quite linear for
the IEEE 1584 equations and somewhat logarithmic for the NFPA 70E
equations. Further examination also indicates that over the range of valid
values (above 16kA for NFPA 70E), the IEEE 1584 method is calculated more
aggressively, and the NFPA 70E method is more conservative.
Figure 2 shows the relationship between arc flash energy and the duration
of the arcing event, which is linear for both methods of calculation. However,
it should be noted that the IEEE 1584 method is once again more aggressive
than its NFPA 70E counterpart.
It's important to note that when using either set of equations, the “working
distance” is considered to be fixed, based upon the voltage and type of
equipment on which the technician will be working. Therefore, the
dependent variables will be the available short-circuit current and the
duration of the arc. The short-circuit current will be determined by the
configuration of the electrical system, and the fault duration will be
determined by the trip properties and settings of the upstream protective
device. However, it's usually assumed that the outer limit for the arcing time
is no more than 2 seconds. Although this is not a hard and fast rule, it
accounts for the likelihood that the arcing material in an arcing field will
likely be either burned off or expelled by the force of the blast. In any case,
this would extinguish the arc event.
Figure 4 (click here to see Fig. 4) shows the calculated arc flash energy for
the 2,000A breaker, using both IEEE 1584 and NFPA 70E calculation
methods. As you can see from the graph, the available arc flash energy peaks
at two points: 7.5kA and 16kA. As you might expect, these points coordinate
with the “break” points of the trip curve where there is transition from the
long-time to short-time trip region and at the transition from the
instantaneous to short-time trip region. These peaks are not replicated on
the NFPA 70E curve because that equation is not valid in the associated trip
range for the 2,000A breaker. However, where larger currents are used,
these peaks will occur using the NFPA 70E equation as well.
Figure 5 (click here to see Fig. 5) shows the calculated arc flash energy for
the 400A breaker, using both IEEE 1584 and NFPA 70E calculation
methods. For this size of breaker, the NFPA 70E equation results are nearly
useless, as the NFPA 70E equation becomes valid at 16kA (40 times the trip
rating of the breaker). However, the IEEE 1584 results indicate a large spike
at 3kA, which is in the area of transition between the instantaneous and
short-time trip regions.
Based on these figures, it's clear that calculating arc flash energy does not
necessarily mesh with the “conservative” approach of calculating the worst
possible case of short-circuit capacity (i.e., the highest value of short-circuit
capacity). In many cases, a lower short-circuit capacity may produce a much
larger arc flash energy level. For this reason, IEEE recommends that the arc
flash energy be calculated both at the calculated arcing current and again at
85% of the arcing current (also known as the second-arcing current) — and
that the higher arc flash energy value be used. Note that the arcing current is
based upon the bolted-fault available short-circuit capacity, and is calculated
for systems below 1kV as:
log [Ia] = K + 0.662 log [Ibf] + 0.0966 V + 0.000526 G + 0.5588 V log [Ibf]
0.00304 G log [Ibf] Or for systems over 1kV as: log [Ia] = 0.00402 + 0.983
log [Ibf]
Where K is a constant, V is the voltage of the system, G is the air gap between
the conductors, and Ibf is the bolted-fault available short-circuit capacity.
After calculating the arc flash energy level, an appropriate selection of PPE is
made using Table130.7(C)(11) from Table NFPA 70E.
In addition to using the calculated methods for determining the arc flash
energy and required personal protective equipment (PPE) described above,
there is a third method of determining what type of protection to use when
working on live equipment. This method is the direct application of Table
130.7(C)(9)(a) from NFPA 70E. This table is intended to be a conservative
application of the principles of Annex D, without the need for performing a
complete arc flash evaluation and study. However, this table is based on
several assumptions:
1. For panelboards and switchboards rated 600V and less, the available fault current
is 25kA, and the clearing time of the protective device is 0.03 seconds (two cycles);
2. For 600V class motor control centers and other such equipment, the available fault
current is 65kA, and the clearing time of the protective device is 0.03 seconds (two
cycles);
3. For insertion or removal of starter buckets in motor control centers as noted above,
the available fault current is 65kA, and the clearing time of the protective device is 0.33
seconds (20 cycles); and/or
4. For 600V class switchgear containing fused switches or power circuit breakers, the
available fault current is 65kA, and the clearing time of the protective device is 1 second
(60 cycles).
In a recent arc flash study of a facility that encompassed more than 700
pieces of equipment, it was found that in 7% of cases, the application of Table
130.7(C)(9)(a) without an appropriate system study, would lead to the use of
insufficient protective gear when working on live equipment. In addition, it
was found that the PPE requirements of Table 130.7(C)(9)(a) were in excess
of those determined through calculation 62% of the time. Therefore,
although the tables are of benefit when working at a location where there is
no existing arc flash study, they are no substitute for a complete and up-to-
date arc flash study.
A useful method
When computer-based arc flash evaluations are run, the calculations of the
software should not be blindly accepted. In many cases, the NFPA 70E
equations are applied outside of their applicable range, and the results are
given with only a footnote to indicate that the calculation is “out of range”
(i.e., invalid). Therefore, it is important that the software output be
thoroughly reviewed and applied as is appropriate to the necessary systems.
Also, it is important that both the NFPA 70E and IEEE 1584 equations be
used correctly. By using both sets of equations, a conservative set of values
can be assembled. It is good practice to calculate the flash energy using both
methods, and to use the valid value (where only one set of equations is valid)
or to use the more conservative value (where both sets of equations are
valid).
Some facility managers prefer to compare the NFPA 70E and/or IEEE 1584
calculated values to Table 130.7(C)(9)(a) from NFPA 70E and to use the most
conservative flash protection equipment recommendation. However, this is
not a requirement of NFPA 70E, and there is debate as to whether
overprotection in the form of flash suits is appropriate, as it is cumbersome
for the worker.
2. Field verify existing conditions — Because conditions may have changed since the
original installation, it's critical that the existing conditions be field verified to ensure
that the arc flash analysis is performed using accurate breaker settings and field
conditions.
3. Obtain the available utility fault current (range) and X/R ratio — The serving
utility should be able to provide this information. Note that the utility normally
guarantees a range of short-circuit current, and that the highest arc flash energy value
may occur anywhere within the range of available short-circuit current values.
5. Perform an NFPA 70E arc flash analysis — Perform the arc flash analysis using
the NFPA 70E equations and parameters.
6. Perform an IEEE 1584 arc flash analysis — Perform the arc flash analysis using
the IEEE 1584 equations and parameters.
7. Repeat steps 4 through 6 for the entire range of possible values — The short-
circuit and arc flash studies must be repeated over the entire range of valid utility fault
capacities. The studies may be performed in a range of fault increments to ensure that
the highest arc flash energy value is captured at each component. For example, a
system that has a fault value ranging from 3,000A through 12,000A may be run in
1,000A increments.
8. Repeat steps 4 through 7 for all likely operating conditions — The report must be
run for all likely operating conditions for the facility, including normal operation, load
shedding modes, parallel operation, tie breakers open and closed, and operating on
standby power. It is important that all configurations be fully evaluated to ensure that
the worst-case scenario is developed for each piece of equipment.
9. Eliminate invalid data — Export the arc flash reports to spreadsheet software, and
delete invalid values because they do not fall within the range of valid conditions for
the equation set used (i.e. NFPA 70E values calculated from short-circuit currents that
are not between 16kA and 50kA as required).
10. Sort the worst-case values for each component or bus — Using a spreadsheet, the
remaining valid values may be sorted and the worst-case extracted for each component
within the system. This value will be considered the available arc flash energy at its
associated point in the system.
11. Assemble the comprehensive report — The final report should indicate the
available short-circuit current used at each component, the available arc flash energy,
the category of PPE required to safely work on the equipment, and which set of
equations was used to determine the available energy. The report should also include
the working distance used in the calculation, and the flash protection boundary
(generally the threshold where the available energy exceeds 1.2 cal/cm2). In addition,
any information that your specific client requires (duration of arc, closing time of
breaker, equipment required for safe operation, etc.) should be included in the report.
All of this information, along with the building's single-line and short-circuit
capacity diagrams, should be collected in a coherent fashion and presented
to the client in a binder for their use.
This method is straightforward, and keeps the report's focus on safety. Most
importantly, it reminds the engineer to evaluate his equations
independently, to ensure that the report contains information that is
accurate, valid, and useful. With proper preparation, arc flash analysis is a
tool that can prevent needless accidents and injuries in the facility for which
it is prepared — the intent of NFPA 70E's requirement.