Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PLUMBING

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

B B

A B C A B C
6.00 6.00
3.00 3.00 3.00 3.00

32mm PPR PN 20 CWL U G D2 W8 W8


1 1 LAV.
25 mm CWL 25mm CWL R
32 mm CWL R
DINING AREA
KITCHEN

2.00
ELEV. +0.40m
ELEV. +0.40m T&B

W2
20 mm CWL

3.00

3.00
F

W6
BEDROOM 1 D3

3.70
W4
ELEV. +3.40m

4.60
5.00
5.00

5.00
D2 D4

1.70
2 20 mm CWL
2 25mm GV LAV.
STORAGE
32 mm CWL R

W3

1.60
TOILET

2.00

W8

DN
D3 T&B
D3
10.00

10.00

10.00

10.00
3.30
A A

2.40
2.00

2.00
D2
BEDROOM 2
W7

LIVING ELEV. +3.40m

UP
AREA

6.30
3 ELEV. +0.40m
3

5.40
D2 D2
5.00

5.00
1.00

W5

D1

1.80
W1 BEDROOM 3

3.00

3.00
W1
RECREATIONAL D5 ELEV. +3.40m
PORCH ROOM D3
2.00

ELEV. +0.40m ELEV. +0.40m W

1.20
BALCONY
ELEV. +3.40m

4 ELEV. +0.20m
W2
4 W2

3.00 3.00 3.00 3.00


6.00 6.00

C.V.
M

G.V.

FROM WATER
LINE SOURCE

1 GROUND FLOOR WATERLINE SYSTEM 2 SECOND FLOOR WATERLINE SYSTEM


P 1 SCALE 1:100 MTS. P 1 SCALE 1:100 MTS.

DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, INSTRUCTOR: PROJECT TITLE: NAME OF STUDENTS: SHEET CONTENTS: REVISIONS: NOTE: SHEET NUMBER:
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE
PROPOSED TWO STOREY BACALANDO, VICTOR JOSEPH E.
COPIES OF THE SAID DOCUMENTS IN PART OR IN WHOLE OR USE IN REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT
THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS.
SEC. 33, RA 9266
ENGR. JOBEL HYLES CABAHUG RESIDENTIAL BUILDING
LOCATION:
NAMUCO, JERICO P.
RUÑA, MICHAEL L.
AS SHOWN

DATE:
P-1
NOTE: DRAWINGS MUST NOT BE SCALED FOR CONSTRUCTION.
B B
A B C A B C
S 6.00 6.00
3.00 3.00 3.00 3.00

OUTLET

SEPTIC
100 mm PVC S P UG

TANK
INLET
FCO FCO
INLET
1 SSP 1 FCO
50 mm PVC W P
SSP

UG
LAV.

UG
WC

2.00
P
T&B

3.00
F

PVC S

PVC S

3.70
5.00
5.00

5.00
100 mm

100 mm

1.70
2 SSP
FCO 50 mm PVC W P 2 SSP
50 mm PVC W P
LAV.
FCO
LAV. FD
WC FCO
WC
TOILET

2.00

DN
T&B
10.00

10.00

10.00
3.30
PVC P

A A
2.00

2.00
100 mm

UP

6.30
3 3
5.00

5.00
1.00

1.80

3.00
2.00

1.20
4 ELEV. +0.20m 4
3.00 3.00
6.00

TO PUBLIC
SEWER LINE 1 GROUND FLOOR SANITARY PLAN 2 SECOND FLOOR SANITARY PLAN
P 2 SCALE 1:100 MTS. P 2 SCALE 1:100 MTS.

DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED, INSTRUCTOR: PROJECT TITLE: NAME OF STUDENTS: SHEET CONTENTS: REVISIONS: NOTE: SHEET NUMBER:
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE
PROPOSED TWO STOREY BACALANDO, VICTOR JOSEPH E.
COPIES OF THE SAID DOCUMENTS IN PART OR IN WHOLE OR USE IN REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT
THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS.
SEC. 33, RA 9266
ENGR. JOBEL HYLES CABAHUG RESIDENTIAL BUILDING
LOCATION:
NAMUCO, JERICO P.
RUÑA, MICHAEL L.
AS SHOWN

DATE:
P-2
NOTE: DRAWINGS MUST NOT BE SCALED FOR CONSTRUCTION.
1 A
B
2 B
A 0
5.0 .00 DIN
32
mm
3.0
0
6.0
5 PP 0
EL I RP
EV NG N
.+ 20
0.4AR
3 10
.00 32
mm
0mEA CW
LU
G
3.0
0 C
CW
2.0
0 LR ELK
EVITC
. + HE
0 0.4 N
4 5.0 .00
1
L
ELEAR IVIN LA
0m
20
F mm
32
mm
0 V. EA G V . CW CW
2.0 +0
.40
m
TO
ILE WC
20
mm L LR
1 A
ELEPO
V. RC
+0 H
T CW
L B
ELE
V.
.40
m
UP
2 B
3.0
0
+0
.2 0m RE
CR
ELE RO EA
A 5.0
0
3.
00
3.0
0
6.0
V. O TIO 0
+0 M N 25
6.0 .40 AL mm BE
0 m

3 10
.0
0 2.0
0
GV
25
ELE DR
V. O
+3 O
.40M LA
3.0
0 C
mm m 1 V.
25
0 CW mm
2.0 WC
L L T&B WC
T&B A V. CW
.00
M C.V
.
4 5
1.8
0 BE
ELEDR
L
2525m
mm m
G. V. O GV
LINFROM V. 20
+3 O
.40M 2.0
0 CW
LR
ES W 1. m 2 DN
OU AT 3.7
0
RC ER 0
E B 1.7
E A
LEV LC
.+ O
3.4NY
0m BE
3.0 ELE DR 0
0 V. O 3.3 .00
+3 O 10
.40M
3
1 GROUND FLOOR ISOMETRIC WATERLINE SYSTEM
m
6.0 0
0 6.3

P 3 SCALE 1:100 MTS. 3.0 0


0 3.0

2 SECOND FLOOR ISOMETRIC WATERLINE SYSTEM


P 3 SCALE 1:100 MTS.

DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED,


INSTRUCTOR: PROJECT TITLE: NAME OF STUDENTS: SHEET CONTENTS: REVISIONS: NOTE: SHEET NUMBER:
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE
PROPOSED TWO STOREY BACALANDO, VICTOR JOSEPH E.
COPIES OF THE SAID DOCUMENTS IN PART OR IN WHOLE OR USE IN REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT
THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS.
SEC. 33, RA 9266
ENGR. JOBEL HYLES CABAHUG RESIDENTIAL BUILDING
LOCATION:
NAMUCO, JERICO P.
RUÑA, MICHAEL L.
AS SHOWN

DATE:
P-3
NOTE: DRAWINGS MUST NOT BE SCALED FOR CONSTRUCTION.
T
TLE S
1 OU
A
PT
SETANK
IC
I
INL NLET
B
2 E
U TG FCO
B
A 0
5.0 .00 PV
C S
P
10
3.0
0m
0

CP m 6.0
5 0
PV m PV
0m CS
m 1S0
10
0m
3 10
.00 SP P
UG
3.0
0 C
0
2.0

00 F
4 5. .00
1 FC
O
5 P
SSU GCO
P
LA0 mm
CS
0 V.
2.0
TO PV
C PV
SETO P ILE WC W mm
WE UB T P 0
R L LIC FC 10
O
INE ELE UP
V.
+0
3.0
.20
0 m
1 A
6.0
0
3.0
B
00
2
0
3.

A 3.
00
3.0
0 B
0
5.0 6.0
0

3 10
.0
0 2.0
0 SS
P 50
FC
O
LA
3.0
0 C
mm V. 50 m
PV m
0 CW PV
1 GROUND FLOOR ISOMETRIC SANITARY PLAN 2.0 T&B
WC WC CW
FD
T&B LA
V. PF
.00
P 4 SCALE 1:100 MTS.
4 5
1.8
0
CO P
SS
P
0
0 2.0
1.2 DN
70
3.
0
1.7

3.0 0
0 3.3 .00
10

6.0 0
0 6.3
3.0
00
0 3.

2 SECOND FLOOR ISOMETRIC SANITARY PLAN


P 4 SCALE 1:100 MTS.

DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED,


INSTRUCTOR: PROJECT TITLE: NAME OF STUDENTS: SHEET CONTENTS: REVISIONS: NOTE: SHEET NUMBER:
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE
PROPOSED TWO STOREY BACALANDO, VICTOR JOSEPH E.
COPIES OF THE SAID DOCUMENTS IN PART OR IN WHOLE OR USE IN REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT
THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS.
SEC. 33, RA 9266
ENGR. JOBEL HYLES CABAHUG RESIDENTIAL BUILDING
LOCATION:
NAMUCO, JERICO P.
RUÑA, MICHAEL L.
AS SHOWN

DATE:
P-4
NOTE: DRAWINGS MUST NOT BE SCALED FOR CONSTRUCTION.
GENERAL PLUMBING NOTES : MATERIAL SPECIFICATION : LEGEND:
1. ALL PLUMBING WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE REQUIREMENTS COLD WATER LINE WATER SUPPLY LINE
OF PHILIPPINE NATIONAL PLUMBING CODE AND THE RULES AND REGULATIONS OF THE BT BATH TUB SANITARY LINE
EXISTING LOCAL CODES AND ORDINANCES. NOTHING CONTAINED ON THE DRAWING SHALL ALL RISER & DISTRIBUTION LINES FOR POTABLE WATER SUPPLY SHALL BE CO CLEAN OUT 75mmØ WASTE LINE
BE CONSTRUCTED AS TO CONFLICT WITH THE NATIONAL AND LOCAL ORDINANCES OR LAWS POLYPROPYLENE (PPR) PIPE; BUGATTI BRAND UNLESS OTHERWISE SPECIFIED. 50mmØ VENT LINE
GOVERNING THE IMPLEMENTATION OF THE PLUMBING WORKS. ALL RISER & DISTRIBUTION LINES FOR NON-POTABLE WATER SUPPLY SHALL BE
CB CATCH BASIN M WATER METER

POLYPROPYLENE (PPR) PIPE; BUGATTI BRAND UNLESS OTHERWISE SPECIFIED. CCO CEILING CLEAN OUT GATE VALVE
2. REFER TO ALL ELECTRICAL, STRUCTURAL AND ARCHITECTURAL PLANS AND
SPECIFICATIONS AND INVESTIGATE ALL POSSIBLE INTERFERENCE AND CONDITIONS CV CHECK VALVE CHECK VALVE

AFFECTING THE PLUMBING WORKS.


SEWER LINE FLOAT VALVE
SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000 HIGH IMPACT
DD DECK DRAIN CLEAN OUT
3. IT IS NOT INTENDED THAT THE DRAWING SHALL SHOW EVERY PIPE FITING, VALVE BY MOLDEX , EMERALD BRAND OR APPROVED EQUAL. DS DOWNSPOUT
AND APPLIANCES. FURNISH AND INSTALL, IF NECESSARY, ALL SUCH ITEM WHETHER
SPECIALLY MENTIONED OR NOT, OR INDICATED ON DRAWING, TO COMPLETE THE VENT LINE DT DRUM TRAP
SYSTEM IN ACCORDANCE WITH THE BEST PRACTICE OF THE PLUMBING TRADE AND
TO THE SATISFACTION OF THE ARCHITECT. SHALL BE POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000 F FAUCET 3000
BY MOLDEX, EMERALD BRAND OR APPROVED EQUAL. FCO FLOOR CLEAN OUT 750 750 1500
4. PERFORM ALL LABOR IN A FIRST-CLASS, NEAT, WORKMANLIKE MANNER BY SPECIALIST
SKILLED IN THEIR TRADES, AND SUCH SPECIALIST AND THEIR WORK SHALL BE DOWN SPOUT FD FLOOR DRAIN
SATISFACTORY TO THE ARCHITECT.
SHALL BE 75mmØ POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000 HIGH IMPACT FV FLOAT VALVE
5. WHERE BRANCH SERVES MORE THAN ONE FIXTURES, INCREASE THE SIZE OF THE BY MOLDEX , EMERALD BRAND OR APPROVED EQUAL. GD GUTTER DRAIN OUTLET
BRANCH PROPORTIONATELY. CO
GT GREASE TRAP CO

BASIC MATERIALS : PIPE SIZES : GV GATE VALVE 1600


WATER SUPPLY PIPES HB HOSE BIBB MANHOLE MANHOLE MANHOLE CO
1. PROVIDE MATERIALS THAT ARE NEW AND THAT CONFORM WITH THE STANDARD CO
OF UNDERWRITERS LABORATORIES. INC. RISER & DOWNFEED PIPE -17mmØ POLYPROPYLENE (PPR) PIPE KS KITCHEN SINK
INLET
2. FOR OTHER MISCELLANEOUS REQUIRED MATERIALS NOT SPECIFICALLY MAIN WATER SUPPLY PIPE - 17mmØ POLYPROPYLENE (PPR) PIPE LAV LAVATORY
MENTIONED, PROVIDE THE BEST OF THE RESPECTIVE KIND. WATER SUPPLY DISTRIBUTION PIPE - 17mmØ POLYPROPYLENE (PPR) PIPE
3. SUBMIT SAMPLES OF MATERIALS FOR APPROVAL AS REQUIRED BY THE
RAIN WATER PIPE - 17mmØ POLYPROPYLENE (PPR) PIPE LT LAUNDRY TUB PLAN
ARCHITECT. RCP REINFORCED CONC. PIPE
SANITARY PIPES SH SHOWER HEAD LIFT BAR
TYP.
(SEE STRL.)
PLUMBING FIXTURES : SOIL PIPE - 100mmØ PVC SP SOIL PIPE FINISH GRADE LINE
SOIL STACK - 100mmØ PVC
SS SOIL STACK C.O ALIGNED W/ CO CO CO CO
SIPHON PIPE BUT NOT
1. INSTALL ALL PLUMBING FIXTURES FREE AND OPEN IN A MANNER TO ACCESS FOR SD SCUPPER DRAIN RETENTION
CLEANING. FURNISH WITH BRACKETS, CLEATS, PLATES, AND ANCHORS REQUIRED WASTE STACK - 75mmØ PVC
CONNECTED RETENTION
CHAMBER CHAMBER 300mm DEPTH AIR SPACE
TO SUPPORT THE FIXTURES RIGIDLY IN PLACE. FLOOR DRAINS -100mmØ PVC TD TRENCH DRAIN OUTLET 2 1 LIQUID LEVEL
LIQUID LEVEL
2. KEEP AWAY, AT A SUFFICIENT DISTANCE BUT NOT LESS 1/2 INCH (12.5 mm.) LAVATORY - 50mmØ PVC VS VENT STACK LIQUID LEVEL
ALL SERVICE PIPES, VALVES, AND FITTINGS FROM SURFACES AND LOCATIONS KITCHEN SINK - 50mmØ PVC
WHICH MAY REQUIRED FINISH COATS OR COVERING. VENT PIPE - 50mmØ PVC
WC WATER CLOSET 1600 SIPHON PIPE
VENT STACK - 50mmØ PVC WCO WALL CLEAN OUT
3. EXTEND THE PIPING TO ALL FIXTURES, OUTLETS, AND EQUIPMENTS FROM REQUIRED RC WALL (SEE
GATE VALVES INSTALLED IN EACH BRANCH NEAR RISERS. WS WASTE STACK STRUCTURAL) DIGESTIVE CHAMBER
CERTIFICATION : AC AIR CHAMBER
10% SLOPE
10% SLOPE
SOIL, WASTE, DRAIN, THIS IS TO CERTIFY THAT THE SEPTIC TANK TO BE CONSTRUCTED,
AND VENT PIPINGS : AS PRIMARY SEWAGE TREATMENT FOR SANITARY DRAINAGE SYSTEM OF THE
BUILDING SHALL CONFORM TO THE THE REQUIREMENTS OF THE 1999 REVISED
1. INSTALL ALL PIPING WORKS IN CONFORMITY WITH ALL PROVISIONS OF THE LATEST PLUMBING CODE, APPENDIX B.5. THE MINIMUM HORIZONTAL DISTANCE OF 15.20M
EDITION OF THE PHILIPPINE NATIONAL PLUMBING CODE AND APPLICABLE REQUIREMENTS FROM THE SEPTIC TANK TO THE NEAREST ARTESIAN WELL IS BEING FOLLOWED. SECTION
OF THE EXISTING LOCAL CODES.
2. EXCAVATE TO REQUIRED DEPTHS AND GRADES, ALL EXCAVATIONS REQUIRED FOR
THE INSTALLATIONS OF PLUMBING AND DRAINAGE SYSTEM WHEN ROCK IS
ENCOUNTERED, EXTEND EXCAVATION TO A DEPTH0.0900150 mm. BELOW THE PIPE BOTTOM
AND, BEFORE THE PIPE IS LAID, FILL THE SPACE BETWEEN THE BOTTOM OF THE PIPE
AND ROCK SURFACE WITH SAND AND APPROVED MATERIAL.
3. LAY WATER SUPPLY PIPES AND SEWERS IN SEPARATE TRENCHES. MASTER PLUMBER 1 SEPTIC VAULT DETAIL DRAWING
P 1 NOT TO SCALE

CAP FINISH FLOOR


FAUCET CHB WALL RC. SLAB
PVC SOIL
STACK PIPE FLR. DRAIN
300

CLEAN OUT MORTAR


AIR CHAMBER PLUG GROUTING
C.O.

AIR CAPPED 150MMØ PVC WYE


CHB WALL OR CHB WALL OR
PARTITION PARTITION
CHAMBER 1/8 BEND
150MMØ PVC 150X150MMØ
PVC SOIL PIPE PVC WYE

INCREASER LAVATORY
50mmØ VENT
AIR CHAMBER AIR CHAMBER
BRACKET 100MMØ PVC
100MMØ PVC P-TRAP
12mmØ CWL PVC DRAIN PIPE
150

BEND
25mmØ CWL 25mmØ CWL P-TRAP CHANGE OF FLOOR DRAIN DETAIL
WALL CLEAN-OUT DETAIL HORIZONTAL DIRECTION
CO CHB WALL OR
50mmØ VENT 50mmØ VENT
PARTITION FIN. FLR. 50mmØ VENT THRU ROOF
FINISH FLOOR
RC. SLAB

TO FIXTURE COLDWATER FIN. FLR.LINE R.C. SLAB


MORTAR
SUPPLY GROUTING MORTAR
F.C.0. GROUTING
F.C.O.
FLOOR FLANGE FLOOR FLANGE 100mmØ SOIL STACK

BEND 1/8 BEND


PVC PIPE
100mmØ PVC SOIL PIPE 100mmØ PVC SOIL PIPE CO

1/8 BEND

PVC WYE

FLOOR CLEAN-OUT DETAIL


HOR.TO VERT. DIRECTION FLOOR CLEAN-OUT DETAIL

DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED,


INSTRUCTOR: PROJECT TITLE: NAME OF STUDENTS: SHEET CONTENTS: REVISIONS: NOTE: SHEET NUMBER:
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE
PROPOSED TWO STOREY BACALANDO, VICTOR JOSEPH E.
COPIES OF THE SAID DOCUMENTS IN PART OR IN WHOLE OR USE IN REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT
THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS.
SEC. 33, RA 9266
ENGR. JOBEL HYLES CABAHUG RESIDENTIAL BUILDING
LOCATION:
NAMUCO, JERICO P.
RUÑA, MICHAEL L.
AS SHOWN

DATE:
P-5
NOTE: DRAWINGS MUST NOT BE SCALED FOR CONSTRUCTION.

You might also like