Theory of Cost
Theory of Cost
Theory of Cost
COM IV SEMESTER
BUSINESS ANALYSIS AND FORECASTING
THEORY OF COST
MEANING OF COST- Cost may be defined as the monetary value of all sacrifices
made to achieve an objective i.e. to produce goods and services. Cost are very
important in business decision making. Cost of production provides the floor to
pricing. It helps manager to take correct decision, such as what price to quote,
whether to place particular order for inputs or not whether to abandon or add a
product to the existing product line and so on.
Ordinarily, cost refer to the money expenses incurred by a firm in the production
process. Cost also included imputed value of the entrepreneur’s own resources
and services, as well as salary of the owner-manager.
DETERMEAINTS OF COST-
(a) Size of plant: There is an inverse relationship between size of plant and
cost. As size of plant increases, cost falls and vice versa.
(b) Level of Output: There is a direct relationship between output level and
cost. More the level of output, more is the cost ( i. e., total cost) and vice
Versa.
(c) Price of Inputs: There is a direct relationship between price of inputs and
cost. As the price of inputs rises, cost rises and vice versa.
(d) State of technology: More modern and upgraded the technology implies
lesser cost and vice versa.
COST CONCEPT-
Explicit cost- An explicit cost is a cost that is directly incurred by the firm,
company or organization during the production. The explicit cost is kept on
record by the accountant of the firm. Salaries, wages, rent, raw material are
few example of the explicit cost. The explicit cost is also known as out-
pocket cost. This cost is handy in calculating both accounting and economic
profit.
Implicit cost- The implicit cost is directly opposite to it, as it is the cost that is
not directly incurred by the firm or company. In implicit cost outflow of cash
doesn’t take place. It is not in the record and is heard to be traced back. The
interest on owner’s capital or the salary of the owner are the prominent
example of the implicit cost. The implicit cost is also known as imputed cost.
Through implicit cost , only the economic profit is calculated.
Incremental cost- Incremental costs are the added costs of a change in the
level of production or the nature of activity. It may be adding a new product or
changing distribution channel, or adding new machinery, etc. It appears to be
similar to marginal cost, but it is not managerial cost. Marginal cost refers to the
cost on added unit of output.
Sunk Cost- Sunk costs are costs which cannot be altered in any way. Sunk costs
are costs which have already been uncured. For example, cost incurred in
constructing a factory. When the factory building is constructed cost have already
been incurred. The building has to be used for which originally envisaged. It can
not be altered when operation are increased or decreased . Investment of
machinery is an example of sunk cost.
Shutdown cost- Shutdown cost are those cost which would be incurred in the
event of suspension of plant operations and which could be saved if operation
were continued. For example cost of sheltering the plant equipment and
construction of sheds for protecting the exposed property, or fixed cost and
maintenance cost etc.
Abandonment cost- Abandonment cost are those cost which are incurred for the
complete removal of the fixed asset from use. These may occur due to obsolesce
or due to improvisation of the firm. Abandonment costs thus involve problem of
disposal of the asset.
Book cost – Book cost are those business cost which don’t involve any cash
payment is made but a provision is made in the books of accounts in order to
include them in the profit and loss account and take tax advantages.
Out of pocket cost- Out of pocket cost are those costs or expenses which are
current payments to the outsiders of the firm. All the explicit costs fall into the
category of out of pocket costs.
Past cost- Past costs are actual costs incurred in the past. These costs are
mentioned in the financial accounts. , since the past costs have already been
incurred, and there is no scope for managerial decision. If the management finds
out that the past costs are excessive, it cannot do anything to rectify it now.
Future cost- Future costs are those costs which are to be incurred in the near
future. This is only a forecast. Future costs matter for managerial decisions
because, the management can evaluate the desirability of that expenditure. In the
case of future costs, if the management considers them very high , it can either
reduce them or postpone the use of them.
Direct cost-Direct costs are related to a specific process or product. They are also
called traceable costs as we can directly trace them to a particular activity,
product or process. They can vary with changes in the activity or product.
Examples of direct costs include manufacturing costs relating to production,
customer acquisition costs pertaining to sales, etc.
Indirect costs- Indirect costs, or untraceable costs, are those which do not
directly relate to a specific activity or component of the business. For example, an
increase in charges of electricity or taxes payable on income. Although we cannot
trace indirect costs, they are important because they affect overall profitability.
Fixed Cost- Fixed cost are the amount spent by the firm on fixed inputs in the
short run. Fixed cost are thus, those costs which remain constant, irrespective of
the level of output. These costs remain unchanged even if the output of the firm
is nil. Fixed costs therefore, are known as Supplementary costs or Overhead costs.
Variable Costs- Variable costs are those cost that change directly as the volume of
output changes. As the production increases variable cost also increases, and as
the product decreases variable costs also decreases, and when the production
stops variable cost is zero.
Semi Variable Cost- This type of cost lies in between fixed and variable cost. It is
neither perfectly variable nor perfectly fixed in relation to changes in output. This
type of costs include a portion of fixed cost and a portion of variable cost, this is
known as semi variable cost. For example- electricity bill generally include both a
fixed charge (meter rent) and a variable charge(charge based on units consumed)
and the total payment made is semi variable cost.
Stair Step Cost- Certain expenses increase in a stair step manner, i.e. remaining
constant over a range of output but rising suddenly to a new higher level as
output passes beyond. The given level. For example- up to a point the attendants
salary may remain fixed as output increases but beyond that point further
increase in output may require an additional attendant leading to a sudden jump
in supervision expenses.
Total cost-Total cost is the total expenditure incurred in the production of goods
and services.
TC= TFC+TVC
Average cost- Average cost is not actual cost, It is obtained by dividing the
total cost by the total output.
Marginal cost- The cost incurred on producing one additional unit of commodity
is known as marginal cost. Thus it shown a change in total cost when one more or
less unit is produced.
MC= TCn – TC(n-1 )
Cost function-
TC=F(Q)
Where,
Q= Quantity produced
F= Function
Short run cost- Short run is a period where the time is too short to expand the
size of industry and the increased demand has to be met within the existing size
of industry because there are certain factors which cannot be changed in short
run. So short run costs are those which vary with output when fixed plant a
capital equipments remain unchanged.
Long run costs- In the long run the size of an industry can be expanded to meet
the increased demand for products such as in long run all the factors of
production can be increased according to need. Hence long run costs are those
which vary with output when all input factors including plants equipment vary.
Since TFC is constant for any level of activity, fixed cost per
unit goes on diminishing as output goes on increasing. The AFC
curve is downward sloping towards the right throughout its length,
with a steep fall at the beginning.
AVC = TVC / Q
ATC = TC / Q
The ATC curve is very much influenced by the AFC and AVC
curves. In the beginning both AFC curve and AVC curve decline and
therefore ATC curve also declines. The AFC curve continues the
trend throughout, though at a diminishing rate. AVC curve
continues the trend till it reaches a certain level and thereafter it
starts rising slowly. Since this rise initially is at a rate lower than
the rate of decline in the AFC curve, the ATC curve continues to
decline for some more time and reaches the lowest point, which
obviously is further than the lowest point of the AVC curve.
Thereafter the ATC curve starts rising because the rate of rise in the
AVC curve is greater than the rate of decline in the AFC curve.
T
As per the above figure suppose that at a given time the firms
operate under plant SAC2 and produces output OQ. If the firm
decides to produce output OR and continues with the current plant
SAC2 its average cost will be uR. But if the firm decides to increase
the size of the plant to plant SAC3 its average cost of producing OR
output would then be TR. Since cost TR is less than the cost on old
plant uR, therefore new plant SAC3 is preferable and should be
adopted. Thus the long run cost of producing OR output will be TR
which can be obtained by increasing the plant size.
Features of LAC curve
To draw long run average cost curve(LAC) we start with a number of
short run average cost(SAC) curves, each such curve representing a
particular size of plant including the optimum plant. One can now
draw a LAC curve which is tangential to all SAC curves. In this
connection following features are highlighted:
1- The LAC curve envelopes the SAC curves and is therefore
called as envelope curve.
2- Each point of the LAC is a point of tangency with the
corresponding SAC curve.
3- The points of tangency on the falling part of SAC curve for
points lying to the left of minimum point of LAC.
4- The points of tangency occur on the rising part of the SAC
curves for the points lying to the right of minimum point of
LAC.
5- The optimum scale of plant is a term applied to the most
efficient of all scales of plants available. This scale of plant is
the one whose SAC curve forms the minimum point of LAC
curve. It is SAC3 in our case which is tangent to LAC curve at
its minimum point at R.
6- Both LAC ad SAC curves are U shaped but the difference
between the two U shapes is that the U shape of the LAC curve
is flatter or lesser pronounced from bottom. The main reason
for this is that in the long run such economies are possible
which cannot be had in the short run, likewise some of the
diseconomies which are faced in short run may not be faced in
the long run.