Q88 CTH
Q88 CTH
Q88 CTH
1,43 Technical operator - Full style: PT. LINTAS SAMUDERA BORNEO LINES JLN.
AIS NASUTION NO. 147 BANJARMASIN -
INDONESIA TELP:0511-3251083, 3269942 &
3269947
1,44 Commercial operator - Full style: PT. LINTAS SAMUDERA BORNEO LINES JLN.
AIS NASUTION NO. 147 BANJARMASIN -
INDONESIA TELP:0511-3251083, 3269942 &
3269947
1,45 Disponent owner - Full style: PT. LINTAS SAMUDERA BORNEO LINES JLN.
AIS NASUTION NO. 147 BANJARMASIN -
INDONESIA TELP:0511-3251083, 3269942 &
3269947
Cargo Handling
6,11 How many grades/products can vessel load/discharge with double valve segregation: N/A
6,12 Maximum loading rate for homogenous cargo per manifold connection: 600 KL/Hrs
6,13 Maximum loading rate for homogenous cargo loaded simultaneously through all 600 KL/Hrs
manifolds:
6,14 Are there any cargo tank filling restrictions. If yes, please specify: N/A
Pumping Systems
6,15 Pumps: No. Type Capacity
Cargo: 1 Screw pump 325 M3/HR
2 Screw pum 325 M3/HR
Stripping: 1 RK 1600 95 M3/HR
Eductors: N/A N/A N/A
Ballast: N/A N/A N/A
6,16 How many cargo pumps can be run simultaneously at full capacity: 2 units/Cargo Pumps
Cargo Control Room
6,17 Is ship fitted with a Cargo Control Room (CCR): Yes
6,18 Can tank innage / ullage be read from the CCR: N/A
Gauging and Sampling
6,19 Can ship operate under closed conditions in accordance with ISGOTT: Yes
6,20 What type of fixed closed tank gauging system is fitted: N/A
6,21 Are overfill (high-high) alarms fitted? If Yes, indicate whether to all tanks or partial: All cargo tanks
Vapor Emission Control
6,22 Is a vapor return system (VRS) fitted: Yes
6,23 Number/size of VRS manifolds (per side): 1 4 & 6 inches
Venting
6,24 State what type of venting system is fitted: Individual
Cargo Manifolds
6,25 Does vessel comply with the latest edition of the OCIMF 'Recommendations for Yes
Oil Tanker Manifolds and Associated Equipment’:
9,11 Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): HSD
Vetting
9,12 Date/Place of last SIRE Inspection: 21/10/2017 (SHELL)
9,13 Date/Place of last CDI Inspection:
9,14 Recent Oil company inspections/screenings (To the best of owners
knowledge and without guarantee of acceptance for future business)*:
* Blanket "approvals" are no longer given by Oil Majors and ships are PERTAMINA PSA,VOPAK TERMINAL
accepted for the voyage on a case by case basis.