Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Prepare Milestone & Activity List

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project Planning Phase

Project Planning Template (Product Backlog, Sprint Planning, Stories, Story points)

Date 28 October 2022


Team ID PNT2022TMID34532
Project Name Real- Time River Water Quality Monitoring and Control System
Maximum Marks

Product Backlog, Sprint Schedule, and Estimation

Functional User
Story
Sprint Requirement Story User Story / Task Priority Team Members
Points
(Epic) Number
As a user, I can
register for the
application by Naveen.M.S,Paramesh.S
Sprint-
1
Registration USN-1 entering my email, 2 High ,Shumin rakesh.R.U
password, and ,Makesh.M.J
confirming my
password.
As a user, I will
receive Naveen.M.S,Paramesh.S
Sprint- confirmation
1
USN-2
email once I have
1 High ,Shumin rakesh.R.U
registered for the ,Makesh.M.J
application
As a user, I can Naveen.M.S,Paramesh.S
Sprint- register for the
2
USN-3
application
2 Low ,Shumin rakesh.R.U
through app ,Makesh.M.J
As a user, I can Naveen.M.S,Paramesh.S
Sprint- register for the
1
USN-4
application
2 Medium ,Shumin rakesh.R.U
through Gmail ,Makesh.M.J
As a user, I can
log into the Naveen.M.S,Paramesh.S
Sprint-
1
Login USN-5 application by 1 High ,Shumin rakesh.R.U
entering email & ,Makesh.M.J
password
Relevant
data’s,
Naveen.M.S,Paramesh.S
As a user he
Dashboard USN-1 2 Medium ,Shumin rakesh.R.U
can access only
,Makesh.M.J
limited set of
data’s

You might also like