Review Test Submission: MDSL804D-Lean Supply Chain Management-Jan 22
Assignment 1
Total Questions: 63
Total Marks: 100
Assignment Information :
The examination will consist of only Objective type (multiple choice) questions requiring
candidates to Mouse-click their correct choice of alternatives against the related question
number. The questions would carry 1 to 5 marks each depending on the difficulty level of
the question as indicated in the table below:
All
• Question 2
0 out of 2 points
Just-In-Time is
Selected Answer: Both (A) and (B)
Answers: Y-type
X-type
P-type
Control charts
• Question 4
2 out of 2 points
What technique deals with the problem of supplying sufficient facilities to production lines
or individuals that require uneven service?
Selected Answer: Queuing theory
PERT
Inventory theory
Queuing theory
• Question 5
2 out of 2 points
Arden light
Alton light
Aston light
• Question 6
2 out of 2 points
A binomial distribution
A Normal distributions
An exponential distribution
• Question 7
0 out of 2 points
According to Spear & Bowen, any improvement must be made in accordance with what,
under the guidance of a teacher,at the lowest possible level in the organization?
Selected Answer: Scientific method
Simplified communications
Standard operations
Scientific method
• Question 8
0 out of 2 points
Answers: Management
Engineering
Quality control
• Question 9
0 out of 2 points
Answers: Supermarkets
A Six Sigma Green Belt practitioner constructs a control chart to display a process mean
and its outer limits. In such a chart, what does UCL stand for?
Selected Answer: Upper Control Limit
Applied to supply chain management, Lamming’s lean supply concept suggests which of
the following?
Selected Answer: All of the above
None
• Question 13
2 out of 2 points
He drives more than one process improvement projects within the functional area and
achieves the savings and quality goals.
Selected Answer: Black Belt
Answers: Six Sigma Deployment Leader
Champion (Sponsor)
Black Belt
• Question 14
2 out of 2 points
Reduce Inventory
Reduce Labour
All
• Question 15
4 out of 4 points
At the completion of the forward and backward passes, the slack for an activity is given by
the
Selected Answer: difference between early start and early finish
The amount of inventory kept at each stock point in a warehouse network is usually based
on:
Selected Answer: Tradeoffs between warehousing, inventory, and transportation costs
Constant demand
Which of the following is NOT a reason that companies are depending more on their
suppliers?
Selected Answer: More control over their suppliers
Answers: Individualistic
Separative
Collaborative
Selective
• Question 25
1 out of 1 points
Answers: Political
Rsources
Processes
Performance
• Question 26
1 out of 1 points
Lead Time
Down Time
None
• Question 27
0 out of 1 points
Answers: Weber
Clark Crouch
Suri
Ohno
• Question 28
1 out of 1 points
Answers: Muda
Mura
Muri
All
• Question 29
0 out of 1 points
Answers: 1960s
1970s
1980s
1990s
• Question 30
1 out of 1 points
In how many ways integrated ERP system can help improve supply chain performance?
Selected Answer: Four
Answers: Two
Three
Four
Five
• Question 31
1 out of 1 points
The “Waste” reduction process begins with the question “What can we do to improve?”
Selected Answer: What can we do to improve?
For a process working at 5 Sigma level, how many opportunities are considered to lie
outside of the specification limits provided by the customer?
Selected Answer: 3.4
Answers: 233
6210
3.4
66807
• Question 33
0 out of 1 points
From the economic system's point of view, the role of marketing intermediaries is to
transform the assortment of products made by producers into the assortment of products
wanted by ________Channel members.
Selected Answer: distributors
Answers: manufacturers
marketers
distributors
consumers
• Question 34
1 out of 1 points
Both
None
• Question 35
1 out of 1 points
Statistically based charts that compute acceptable ranges of performance with a mean
value as a target for product specifications are called
Selected Answer: Control Charts
Control Charts
None
• Question 36
1 out of 1 points
Quality
Both
Who stated that, “managing the supply chain is vital for international business”.
Selected Answer: Scary and Larsen
Control Charts
Group Technology
Check Sheets
• Question 39
1 out of 1 points
What does it mean if the value stream is faster than the takt time
Selected Answer: Over production
Under Production
Over production
None
• Question 40
1 out of 1 points
In a 4 sigma level process, how many opportunities lie outside the specification limits
provided by the customer?
Selected Answer: 6210
Answers: 6210
233
456
876
• Question 41
1 out of 1 points
Answers: Seiri
Seiton
Shitsuke
Seiso
• Question 42
1 out of 1 points
Answers: Authritative
Participative
Individualistic
None
• Question 43
1 out of 1 points
Answers: ISO9000
ISO14000
ISO14001:2004
None
• Question 44
1 out of 1 points
Answers: 1985
1986
1987
1988
• Question 45
1 out of 1 points
Answers: Plan
Do
Check
React
• Question 46
1 out of 1 points
Answers: 98%
58%
38%
18%
• Question 47
1 out of 1 points
The objective of which system was to minimize the consumption of resources that added
no value to the product.?
Selected Answer: Toyota Production System
Production Kanban
Withdrawl Kanban
Supply kanban
• Question 49
1 out of 1 points
Answers: Ballard
Ohno
Shingo
Suri
• Question 50
1 out of 1 points
Answers: Might be
Must be
Can be
May be
• Question 52
1 out of 1 points
Quick response manufacturing is proposed by
Selected Answer: Suri
Answers: Suri
Shingo
Ohno
None
• Question 53
1 out of 1 points
Answers: Muda
Kaizen
Mura
Jidoka
• Question 54
0 out of 1 points
Answers: Ford
General Motors
Volkswagen
Crysler
• Question 55
1 out of 1 points
Answers: Distribution
Transportation
Design
Warehousing
• Question 56
0 out of 1 points
Womack has an abbreviated definition of lean, which is ‘Lean = purpose + process + what’?
Selected Answer: People
Answers: Planet
Policy
People
Practice
• Question 57
1 out of 1 points
Work in Process
Waste in Progress
Work in Progress
• Question 58
1 out of 1 points
Answers: JIT
Agility
Customized Logistics
None
• Question 59
0 out of 1 points
Answers: Womack
Roos
Both
None
• Question 60
0 out of 1 points
Kanban system is also generally called as
Selected Answer: Pull system
Push system
Put on system
None
• Question 61
1 out of 1 points
Answers: Shingo
Suri
Ballard
Ohno
• Question 62
1 out of 1 points
Who said tht,E-commerce describes the process of buying and selling (or exchanging) of
products, services and information via computer networks including the internet.?
Selected Answer: E.Turban
Answers: E.Turban
M.Greenstein
T.M. Feinman
J.F. Rayport
• Question 63
0 out of 1 points
Lean producer
Craft producer
All
Sunday, 8 May 2022 13:41:28 o'clock IST