Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Estimation and Costing

Download as pdf
Download as pdf
You are on page 1of 4
16CV73 usn [[R2]v[ [ele] 4ilels RV COLLEGE OF ENGINEERING" (An Autonomous Institution affiliated to VTU) VII Semester B. E. Examinations Nov/Dec-19 Civil Engineering ESTIMATION AND COSTING Time: 03 Hours Maximum Marks: 100 Instructions to candidates: 1. Answer all questions from Part A. Part A questions should be answered in first three pages of the answer book only. 2. Answer any FOUR full questions from Part B. PART-A 1.1 | Must reliable estimate among all the estimates is F 02 1.2 | Floor area includes the area of the balcony up to %. 02 1.3 | The order of booking dimensions in bill of quantities is 02 1.4 | The weight of an item is measured correct to nearest to 02 1.5 |The center line method of building estimate can be adapted to | type of buildings. 02 1.6 | The expected out turn of half brick partition wall per mason per day is Z 02 1.7 | If B is the width of formation, d is the height of the embankment, side slope S:1 for a highway with no transverse slope, the area of cross sectionis__ 02 1.8 | The correct prismoidal formula for volume calculation is 02 1.9 | Brick work measured in sq.m if the thickness of the wall is and number of brick per cum is ‘ 02 1.10 | For 100sq.m cement concrete (1:2:4)4cm thick floor, the quality of cement required is 02 PART-B Prepare an estimate of the following items of a residential building shown in Figure-01 by center line method. a) Excavation for foundation b) Sand filling in plinth ¢) — P.C.C (1:4:8) for foundation d) First class brick masonry in c.m(1:6) up to plinth |¢) First class brick masonry in c.m(1:6) in super structure. | Prepare an abstract of estimate. 35 Prepare an estimate of a railway R.C culvert as shown in Figure-02. The general specifications are as follows, a) Foundation concrete is to be of B.B.CC (1:4:8) b) Brick work is of first class in c.m(1:6) c) The reinforced cement concrete coping is to be provided in proportion (1:1.5:3) d) The brick on edge flooring is to be provided with sand filling and flush cement pointing. ) The exposed surface are to be provided with cut cement pointing in c.m (1:1) Prepare an abstract of estimate. 35 Write detailed technical specification for the following item of work: a) Marble flooring b) RCC work for proportion 1:2:4 ©) Brick masonry 1:6 em. 15 OR Write detailed technical specification for the following item of work: a) Excavation of sub soil for foundation b) 12mm thick internal plastering 1.6cm c) Wooden partition work. 15 Work out from the first principles the rate per unit of following: a) — Earth excavation for foundation in ordinary soil b) Plain cement concrete for proportion M15 grade ©) Providing and laying HYSD steel reinforcement. 15 OR Work out from the first principles the rate per unit of the following, a) RCC column proportion (1:15:3) M20 with steel reinforcement b) Random rubble masonry in cement mortar 1:6 c) White washing in three coats. 15 Write short notes on a) Conditions of contract b) Open or public tender c) _ Liquidated damages OR Calculate the volume of earth work for a proposed road having formation width 7.5m and side slope 1:1 using mid sectional area method. Details of road are given in Table 9 below. Table 9 Gp | 200 | 200 | 600 | 900 | 2200 | 1500 | 2800 | 2100 | 2400 | 2700 | 3000 Gp | 19:55 | 1050 | 1040 | 1035 | 1020 | 1000 980 | 9.65 | 960 | 940 | 920 15 5}

You might also like