QAQC Requirement-Tile Works - 副本 12345

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

GEWAN ISLAND BUILDING PACKAGE 03

PROCEDURE OF WALL&FLOOR TILES FIXING WORKS

PART 1 APPLICATION OF MAIN MATERIALS

/Final plaster/ wet water


proofing application /Final
SURFACE screed /Surface preparation Ask CRCC site Eng for IR
1
PREPRATION INR must be approved, before work starts
Area must be cleaned

mixed with CEMPATCH


OPC CEMMENT SBR 100(1 SBR:2 OPC
2
50KG/BAG cemment)--FOR FLOOR
TILES

3CM mortar should be put


CEMFIX-TBG on the sand screed--FOR
3
25KG/BAG/(CIKO BS40) FLOOR TILES. Mixing 1bag
with 2L-2.5L water

FOR WALL TILES,1 bag


CEMFIX-GP
mixed with 6.75L-7.25L
25KG/BAG
water

CIKO TILE 2K
(CIKOtile 2K is available as 30
FOR WALL TILES-1bag part
kg kits consisting
A&1 pcs part B mixed
of in Part-A 25kg powder and
Part-B 5.0 litre)

mixing 1 part Cempatch


SBR100:2 parts OPC
cement by weight.Pour the
properly mixed slurry over
5 CEMPATCH SBR 100 the leveled bedding screed
whist wet at a thickness of
2 to 3mm and immediately
install the tile.--FOR
FLOOR TILES

Grout for ceramic tiles


CIKO TILE Grout 2k (12kg
6 .there have different color
part A&2kg part B)
for tiles
PART 2 QUALITY CONTROL

Tiles elevation。
Mortar layers and tile
8 backs need to cover
(SBR+OPC cemment) to
avoid sound

The floor drain must be


located in the corner of the
FLOOR DRAIN LOCATION two tiles. Determine
9
CONTROL whether the floor drain is
located properly before
pasting the floor tile

The floor drain model is


used before the wall tiles
starts, and the position of
FLOOR DRAIN LOCATION
10 the floor drain from the
CONTROL
wall is adjusted by the
thickness of the wall motar
(ciko tile 2k)

After the floor drain


locationis confirmed, put
11 FLOOR DRAIN LOCATION
one wall tile to fix the
CONTROL
location, and other wall
tiles follow the first tile。

Tile opening size must be


the same as floor drain size
to avoid secondary cutting
damage to the finished
product

12
The tile plane should be
lower than the flush tank
cover plane, otherwise the
13 button cannot be
installed.Notify CRCC ENG
immediately if this
happens

Only need half pcs above


the celling level,some
14 ceramic tile edge Angle
damage is used above
celling

Tile pipe openings require


15 a professional opening
bit,it will rejected if it is
ugly

16 wall and tiles backside


must fill with materials

Tile edges and corners


17 should not be damaged。
Tile gaps need to be。
Aligned

Shower mixer-156mm
18
need follow actual cutting

To ensure proper mixing ,


mechanically powered
19 mixer or drill fitted with
suitable paddle should be
used

The joint is not matching


proprely, the level is not
20
same, this situation will be
reject by KEO
different color have
21
different color grout

if tiles up and down like


22 this ,it will be reject after
grou