Job Info
Customer Information:
GCPM-FLD001-50F1
Effective Date: 07-Oct-2022
Rev: Y
Customer:
Field Well: Customer Rep:
Land / Barge / Shelf / Deep Water:
Unit Conversions:
COSL
BUZURGAN BUCS-142W
Fan Wenkui COSL LR7006
Land
Job Center Job ID:
Country District:
Baker Field Rep: Baker Field Rep:2 Mobilization Date:
De-Mobilization Date:
Iraq
BAS1-1872 (Basra)
Khalid Alauqaili
1-12-2022
2-12-2022
Length Diameter Pressure Weight M.W.
m in psi kg SG
Volume
bbl
Temp Torque
°F Nm
Casing Information:
Update Tubular Info
Maximum Test With Pack-Off/Slick-Stinger Out, No Drill Pipe Weight on the ZXP, and Cement Not Setup.
Maximum Test = 1,693.8 psi
Failure Mode = Hanger Overload
Baker Hughes Minimum Recommended Packer Test Pressure with Pack-Off O ut = 1000.0 psi
Maximum Annulus Test with Pack-off/Slick-Stinger in and Cement Not Setup.
Maximum Annulus Test = 1,978.1 psi
Failure Mode = Hanger Overload
Baker Hughes Minimum Recommended Packer Test Pressure with Pack-Off In = 1000.0 psi
MAXIMUM CASING AND LINER TEST AFTER CEMENT HAS SET-UP
IF THERE IS NO CEMENT AROUND HANGER
MAXIMUM TEST PRESSURE = 2,197.0 psi
Failure Mode = Hanger Overload
WARNING: THIS TEST PRESSURE ASSUMES THAT THERE IS CEMENT SUPPORTING THE BOTTOM OF THE LINER
Baker Hughes Minimum Recommended System Packer Test Pressure = 1000.0 psi
Copyright 2018-2022 Baker Hughes Company. All rights reserved. The information contained in this document is company confidential and proprietary property
Baker Hughes and its affiliates. It is to be used only for the benefit of Baker Hughes and may not be distributed, transmitted, reproduced, altered, or used for any
other purpose without the express written consent of Baker Hughes.
Displacement:
5.5 in HT55 24.7 lb/ft S-135 Drill Pipe Volume 185.93 bbl 1,509.1 stks
Total Drill Pipe Volume 185.93 bbl 1,509.1 stks
7 in 29 lb/ft VAM21 Liner Volume 75.95 bbl 616.5 stks
Total Volume to Landing Collar 253.18 bbl 545.9 stks
Shoe Track Volume 8.70 bbl 70.6 stks
Total Volume to Shoe 261.88 bbl 2,125.6 stks
Cement Program:
Type Description Volume (bbl) Density (SG) Cumulated Volume (bbl)
Prefulsh 0.00
Spacer 1
Spacer 2
Lead Slurry
Tail Slurry
Release Pump Down Plug
Spacer 1
Spacer 2
Spacer 3
Spacer 4
Displacement volumes based on releading the PDP:
Preflush at Shoe: 261.88 bbl 2,126 stks
Lead Slurry at Liner Shoe: 261.88 bbl 2,126 stks
Tail Slurry at Liner Shoe: 261.88 bbl 2,126 stks
Plug Bump: 253.18 bbl 2,055 stks
Half Shoe Track Capacity: 4.35 bbl 35 stks
Copyright 2018-2022 Baker Hughes Company. All rights reserved. The information contained in this document is company confidential and proprietary
property of Baker Hughes and its affiliates. It is to be used only for the benefit of Baker Hughes and may not be distributed, transmitted,
reproduced, altered, or used for any other purpose without the express written consent of Baker Hughes.
m
m
3383.00 m
15,070 kg
-7,730 kg
0.41
0.41
0.00
0.41
0.27 m
GCPM-FLD001-50F1
Effective Date: 07-Oct-2022
Rev: Y
RGAN
Alauqaili
-1872 (Basra)
#1 Size: 7.000 in
#1 Weight: 29.0 lb/ft
#1 MYS: 95,000
#1 ID: 6.184 in
#1 Burst: 9,690 psi
#1 Collapse: 7,840 psi
#1 Length: 623 m
#2 Size: 0.000 in
#2 Weight: 0.0 lb/ft
#2 MYS: -
#2 ID: 0 in
#2 Burst: N/A psi
#2 Collapse: N/A psi
#2 Length: 0m
calculations and
1000.0 psi
Setup.
psi
GCPM-FLD001-50F1
Effective Date: 07-Oct-2022
stks
mpany confidential and proprietary
not be distributed, transmitted,