PM-PE-ECD-14
Rev. 1
1 of 12
PROJECT TITLE/CONTRACT NO. /PO NO. : _________________ Transmission Project /Sp_________/PO No. _______________ Date :
CONTRACT AMOUNT :
CONTRACTOR :
CONTRACT DURATION :
This is to certify that the Contractor has satisfactorily completed and accomplished all the abovementioned works based on shipping documents, CPPI and NOA for the period Month Day Year to Month Day Year; all pertinent documents relative to this WAC are in the
custody of our Project Division. This certification is being issued upon the request and as supporting document to the claim of the Contractor subject to acceptance of NGCP concerned groups.
Item No./s ______________ was/were accomplished beyond project completion due to ______________ (if applicable).
PREPARED BY:
APPROVED BY:
PROJECT TITLE/CONTRACT NO. /PO NO. : VISAYAS SUBSTATION UPGRADING PROJECT 2, SCHEDULE I/Sp20.VSUP2.Vt-0479(I) Date :
CONTRACT AMOUNT : USD 5,702,040.70 & PhP 87,046,756.12
CONTRACTOR : FUJIAN YONGFU POWER ENGINEERING CO.,LTD
CONTRACT DURATION : 480 Calendar days
CONTRACT EFFECTIVITY : UNKNOWN Transmission Line
CONTRACT EXPIRY : UNKNOWN ✘ Substation
REVISED CONTRACT EXPIRY : NONE
This is to certify that the Contractor has satisfactorily completed and accomplished all the abovementioned works based on delivery receipt and CPPI for the period Month Day Year to Month Day Year; all pertinent documents relative to this WAC are in the custody of our Project
Division. This further certifies that the works were checked, inspected, verified and found in accordance with the plans and contract specification and hereby accepted and submitted for payment.
Item No./s ______________ was/were accomplished beyond project completion due to ______________ (if applicable).
PREPARED BY:
APPROVED BY:
DATE OF
ASSET CONTRACT ITEM DELIVERY ONSHORE ONSHORE
PO ITEM NO. DESCRIPTION QTY UNIT ACCOMPLISHME
CATEGORY NO. RECEIPT NO. LOCALSUPPLY INCLUDING LOCALSUPPLY INCLUDING
QTY AMOUNT QTY AMOUNT QTY AMOUNT NT
DELIVERY DELIVERY
PHP PHP
12% VAT
This is to certify that the Contractor has satisfactorily completed and accomplished all the abovementioned works for the period Month Day Year to Month Day Year; all pertinent documents relative to this WAC are in the custody of our Project Division. This further certifies that the works were checked, inspected,
verified and found in accordance with the plans and contract specification and hereby accepted and submitted for payment.
Item No./s ______________ was/were accomplished beyond project completion due to ______________ (if applicable).
PREPARED BY:
APPROVED BY:
PROJECT TITLE/CONTRACT NO. /PO NO. : VISAYAS SUBSTATION UPGRADING PROJECT 2, SCHEDULE VI/Sp21.VSUP2.Vt-0511(V Date : 15-Nov-22
CONTRACT/PO AMOUNT : USD 5,499,686.42 & PhP 328,563,067.1
CONTRACTOR : FUJIAN YONGFU POWER ENGINEERING CO.,LTD/MAXIPRO DEVELOPMENT CORPORA
CONTRACT DURATION : 510 CALENDAR DAYS
CONTRACT EFFECTIVITY : JANUARY 10,2022 Transmission Line
CONTRACT EXPIRY : JUNE 4,2023 ✘ Substation
REVISED CONTRACT EXPIRY : NONE
C. CIVIL WORKS
1 SITE GRADING
This is to certify that the Contractor has satisfactorily completed and accomplished all the abovementioned works for the period November 15,2022; all pertinent documents relative to this WAC are in the custody of our Project Division. This further certifies that the works were checked, inspected, verified and found in
accordance with the plans and contract specification and hereby accepted and submitted for payment.
Item No./s ______________ was/were accomplished beyond project completion due to ______________ (if applicable).
PREPARED BY:
RONALD B. BERSAMIN
Construction Projects Supervisor Date Contractor's Authorized Date
Contractor's Representative
CHECKED/VERIFIED BY:
APPROVED BY:
EDD PPDD
(a) Transmission Lines
1 Buildings, civil works and establishment
2 Towers and associated lines
- All types of Steel Towers Including Diving Bus Steel Towers
Body Ext.
Leg Ext.
Stubs
- Line Hardwares for Steel Towers Line Hardwares
* Hardwares for Suspension String Assembly
* Hardwares for Dead-End String Assembly
* Hardwares forJumper String Assembly
- Line Insulators Line insulator
* Insulators for Suspension String Assembly
* Insulators for Dead-End String Assembly
* Insulators forJumper String Assembly
- Power Conductor Power conductors
* 795MCM ACSR/AS "Condor"
* 336.4 MCM ACSR/AS "Linnet"
* 410 mm2 TACSR/AS/610 mm2 TACSR/AS
* Vibration Damper for Power Conductor
- Overhead Ground Wire (OHGW) Overhead Ground Wire
* 7 No. 6 AWG Aluminum Clad Steel Wire
* Vibration Damper for OHGW
* Tension Assembly of OHGW for Steel Tower
- Optical Ground Wire Optical Ground Wire
* Optic Fiber Groundwire Erection/Installation/Dismantling
* Vibration Damper for OPGW
* Suspension Assembly for OPGW
* Tension Assembly for OPGW
* Junction Box for OPGW
- Grounding Assemblies
* Steel Tower Grounding
- Signages
* Helicopter Patrol Number
* Ground Patrol Number
* Danger Sign
* Phase Plates
- Steel Tower Foundation
- Diving Bus Foundation
- Slope Protection Works
* Riprapping
* Rock Walling
* Slope Cutting
* Concrete Retaining Wall
- Seclusion Fence
Diversion Canal
* Open Concrete Canal
* Open Riprap Canal
* Concrete Wing Wall
3 Poles and associated lines
- All types of Pole Structures Steel Poles
* Wood Pole Erection/Installation
* Concrete Pole
Attachment I
ASSET CATEGORY PM-PE-ECD-13
6 of 12
* Steel Pole
* Stub Pole
- Pole Dressing Line Hardwares
- Line Insulators Line insulator
* Insulators for Suspension String Assembly
* Insulators for Dead-End String Assembly
* Insulator for Jumper String Assembly
* Line Post Insulators
- Power Conductor Power conductors
* 795MCM ACSR/AS "Condor"
* 336.4 MCM ACSR/AS "Linnet"
* 410 mm2 TACSR/AS/610 mm2 TACSR/AS
* Vibration Damper for Power Conductor
- Overhead Ground Wire (OHGW) Overhead Ground Wire
* 7 No. 6 AWG Aluminum Clad Steel Wire
* Vibration Damper for OHGW
* Tension Assembly of OHGW for Steel Poles
- Optical Ground Wire Optical Ground Wire
* Optic Fiber Groundwire
* Vibration Damper for OPGW
* Suspension Assembly for OPGW
* Tension Assembly for OPGW
* Junction Box for OPGW
- Grounding Assemblies
* Steel Pole Grounding
- Guying Assemblies
- Signages
* Ground Patrol Number
* Danger Sign
* Phase Plates
- Steel Pole Foundation
- Steel Stub Pole Foundation
- Slope Protection Works
* Riprapping
* Rock Walling
* Slope Cutting
* Concrete Retaining Wall
- Pole Guy Concrete Anchor Block/other types
4 Underground cables
5 Sub-sea cables including CTS and CS, electrode lines and accessories;
- Submarine Cable Submarine Cable
- Submarine Fiber-Optic Cable Submarine Fiber-Optic Cable
- Cable Terminal Station Cable Terminal Station
- Converter Stations Converter Stations
- Electrode Lines Electrode Lines
6 Easements owned by the Regulated Entity
7 Other
- Clearing of Right-of-Way
- Check, Survey, Plans and Profile Pegging Survey Works (Topo/Parcellary Survey)
- Geological/Geotechnical Investigation Geological and Geotechnical Services
- Electrical Resistivity Measurement for Grounding Design
- Testing and Commissioning
- Full scale tower testing
Attachment I
ASSET CATEGORY PM-PE-ECD-13
7 of 12
- Smart GRID
- Substation Control System
* Microprocessor Based Substation Control System (MBSC) MBSC
* Substation Automation Control System (SACS)
* Remote Terminal Unit (RTU)
* Main Control Switchboard (MCS) Main control switchboard
- Main Control Switchboard (MCS)
- Network Protection Manager
- Protection Management System (PMS)
- Access, Control and Alarm Monitoring System (ACAMS) ACAMS
- Closed Circuit Television (CCTV) CCTV
- Building Management System (BMS) Building Management System
- Multifunction Fault Recorder
- Sequence of Events Recorder - Sequential events recorder (SER)
Network Disturbance Monitoring Equipment
(NDME)
- Network Disturbance Monitoring Equipment (NDME)
- Synchro-Check Relay System - Digital transient recorder (DTR)
- BCU Equipment / Bay Control Unit
- Uninterruptible Power Supply (UPS)
- Modules, Devices, Transducers, Interfacing cards, etc.
- All Relays
6 Power compensating equipment, eg. reactors
- Capacitor
- Reactor
7 Buswork, power and control cables
- Steel Structures
- Installation Materials Complete installation materials
* Bus Support
* Insulators Station post insulators
* Line Hardwares
* Connectors
* Fittings
* Conductors
* Clamps
- Power and Control cables Power, control and instrumentation cables
Cable Tray and fittings Cable Trays
- Conduits/Cable Ducts and accessories
- Grounding Materials
Complete grounding materials
* Ground conductors, wires and cables
* Lightning and Ground Rods
* Ground connectors
Attachment I
ASSET CATEGORY PM-PE-ECD-13
10 of 12
* Thermoweld Powder
* Thermoweld Mold
8 Other
- Emergency Diesel Generator Emergency Diesel Generator Set
- Metalclad Switchgear Metal Clad Switchgear
- Surge Arrester Surge Arrester
- Storage Battery 125V/48V Station Batteries w/ battery charger
- Battery Charger
- Station Service Voltage Transformer Station service transformer
- Closed Circuit Television System (CCTV)
- AC and DC Auxilliary Switchboard/ Panels AC/DC Auxilliary Switchboard
- Marshalling Panel
- Metering Panel
- Lighting System Outdoor Lighting System and Outlets
- Water Supply Syetem
* Deepwell drilling, development and testing
* Submersible deepwell pump
* Elevated steel water tank
* Domestic water piping system (yard)
* Hydro-Pneumatic Water Supply System
* Centrifugal Pump (for domestic water)
- Uninterruptible Power Supply (UPS) UPS System
Fused DS
Capacitor Voltage Transformer/Inductive Voltage
Transformer
Air Break Switch (ABS)
Insulating Oil Treatment Plant
On-load diagnostics systems for transformers
Sychro check/voltage check panel for sync.
Reconfiguration works at the existing GIS
Geological and Geotechnical Services
Materials Investigation and Testing Works
ROW Clearing (Negotiation/Acquisition)
Survey Works (Topo/Parcellary Survey)
Price Escalation
RVAT
RVAT and Import Duties
9 Spares, spare parts & tools
10 Land owned but used for substations
Certificate of
ITEM QTY/
Assset Category DESCRIPTION Delivery to Site ACCOMPLISHMENT DATE
NO. UNIT ONSHORE - Erection/Installation/Civil ONSHORE - Erection/Installation/Civil
No. QTY AMOUNT QTY AMOUNT QTY AMOUNT
PHP PHP
I NGCP SUBSTATION A
D MECHANICAL WORKS Only QTY columns will be filled out. This is for monitoring of accomplishment
progress and to answer any issue that may arise in the future.
1 DOMESTIC WATER SUPPLY SYSTEM
II NGCP SUBSTATION B
B CIVIL WORKS
B.1 A Old CHB Fence 1 lot 149,064.07 149,064.07 1.00 149,064.07 1.00 149,064.07 24-Oct-16
Once the activity is complete, reflect it by inputting '1.0' under the QTY column to
indicate that this is approved for billing processing. Specify also the date of
accomplishment
This is to certify that the Contractor has satisfactorily completed and accomplished all the abovementioned works for the period Oct. 1 - 15, 2016 and all pertinent documents relative to this WAC are in the custody of _________ Project Division. This further
certifies that the works were checked, inspected, verified and found in accordance with the plans and contract specification and hereby accepted and submitted for payment.
This is to certify that the Contractor has satisfactorily completed and accomplished all the abovementioned works for the period Jan. 15, 2016 - Jan. 30, 2016; and, all pertinent documents relative to this WAC per __________________ are in the custody of our
Project Division. This certification is being issued based on shipping documents subject to final inspection, physical inventory and acceptance of NGCP concerned groups.
Item No./s ______________ was/were accomplished beyond project completion due to ______________ (if applicable).
- SIGNED - - SIGNED -
Head, Construction Standards Division Head, Engineering Construction Department
Date: ___________ Date: ___________