AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.

111
Switchgear & Panel Board Manufacturer

Annexure - 3

Certification

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
2022
Certificate

Al Asry Electric Company Ltd.


in Dammam has successfully passed the
EATON Panel Builder Program Audit.

The overall rating is 272 out of 287 points.


By partnering with Eaton, our licensed Panel Builders are committed to
provide products, services and solutions with the highest quality available in
the market. This partnership symbolizes our commitment to the satisfaction
and success of our customers and dedication to mutual business growth.

Johannes Thaller Norbert Ritschel


Manager Panel Builder Operations Auditor

Certificate is valid until July 2023.


AL ASRV ELECTRIC CO. LTD. � ibg.uoll ii,l.il/}'llll �}&WI �}JU
Switchgear & Panel Board Manufacturer

Type Tested
Certification

POW£IR6UAIRD

Pre-Qualification Submittal:
AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 4

Previous Consultants &Governmental


Sector Approvals .

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
10/17/22, 10:08 AM Aconex

11 Regional Infrastructure
Regional Infrastructure
NEOM
Saudi Arabia

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal NPR-WTRAN-024291 NPR-WTRAN-024291

Final (WF-025246) 11-600000-4800000321-YCC-ELE-MAT-000032_Material


Submittal For Supply of LV Panels by Al Asry Electric Co.

From Mr NEOM Infrastructure DC - NEOM - Projects

To
(2) 4800000321 DCC Al Yamama - AL YAMAMA COMPANY KSA (+1 more...)

Cc
(2) NEOM Quality & Excellence Document Control - NEOM - Engineering & Technical Services Dept (+1 more...)

Sent Sunday, 16 October 2022


7:50:09 PM AST (GMT +03:00)

Status N/A


DOCUMENT ATTACHMENTS
(2)

(0 selected)

Revision
File Document No Revision Title Status
Date

11-600000-4800000321-YCC- Material Submittal For Supply of LV Panels A - Work May


02 10/10/2022
ELE-CRS-000126 by Al Asry Electric Co. CRS Proceed

11-600000-4800000321-YCC- Material Submittal For Supply of LV Panels A - Work May


02 10/10/2022
ELE-MAT-000032 by Al Asry Electric Co. Proceed


MESSAGE

Workflow Review History

The attached documents have completed the "11-600000-4800000321-YCC-ELE-MAT-000032_Material Submittal For Supply of LV Panels by Al
Asry Electric Co." workflow with the following results :

This transmittal was automatically generated.

Doc No Step Participant Review Outcome Comments

11-600000-4800000321- YCC-DCC/NEOM-RI EPM


N Infrastructure DC A - Work May Proceed
YCC-ELE-CRS-000126 DCC

11-600000-4800000321- YCC-DCC/NEOM-RI EPM


N Infrastructure DC A - Work May Proceed
YCC-ELE-MAT-000032 DCC

https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1355878468%26CORRESPONDEN… 1/1
TRANSMITTAL OF DOCUMENTS
The Engineer: The : Employer: The Contractor:

Project Name Ibn Al-Haitham Service station Request No.: IHSS-ELEC-044-00


The Employer Tas’helat Marketing (TMC) Date: 16/03/2022
The Engineer Arab Sustainable Architecture for Engineering / TTW Time:
The Contractor Khateeb United Trading & Contracting Co.
Contract No. 003/2021
To : The Engineer From : The Contractor

Subject : pre qualifiction for panel board .

1 Document Type
Material Submittal Schedules Tests Technical Sheets

Manufacture certificates Catalogues Material Sample X Other

2 Submittal details
Item No. Description REF Contract doc. Ref & Compliances
1 pre qualifiction for banel board , al asry electric ELEC section 26 , 262416
company ( ABB )

Transmitted for:

Information X Approval Review & Comment Other

For : Contractor (Name) : Eng. Mohamad Alrefai Signature :


For The Engineer Use
Received on (Date) : 16-Mar-22 Time :
Remarks: ************

Name : Saif AbuRabia Signature :


For The Engineer Use

Approved Approved as Noted Revise and resubmit

Rejected Others :
Remarks : ABB as a manufacture for Panel boards is approved,Contractor to submit the following for Approval
1.Compliance sheet regarding to project specs 2.Voltage drop calculation ,3.Schematic diagram for panels
4.ABB dealer certificate 5.List of material ,6.Test Reports,7.modified load schedule depends on actual elec,mech.loads
Name: Elec.Assem Ighrair Signature: Date: 17.3.2022

Comments and Final Approval:

Name: Saif AbuRabia Signature: Date: 19-Mar-22

PM-SD-F03 Issue 02 Page 1 of 1


3/24/22, 12:27 PM Aconex

Ashraf Abumwais Final (WF-000292) Panel boards submittal by alasry-ABB FINAL - Coastal Villa… 7:13 AM
THE RED SEA DEVELOPMENT COMPANY WORKFLOW TRANSMITTAL TRS03C07-WTRAN-001437

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Workflow Transmittal TRS03C07-WTRAN-001437 TRS03C07-WTRAN-001437

Final (WF-000292) Panel boards submittal by alasry-ABB FINAL - Coastal Village Professional Beach Club Rev 01

From Mr Ashraf Abumwais - The Red Sea Development Company

To
(11) Mr NISAR HYDROSE - IKK GROUP (+10 more...)

Cc
(6) Mrs Najwa Hamzeh - The Red Sea Development Company (+5 more...)

Sent Thursday, March 24, 2022


7:13:22 AM AST (GMT +03:00)

Status N/A


DOCUMENT ATTACHMENTS
(1)

(0 selected)

File Document No Revision Title Status

R03-C07B01-IKP-MAT-EL-0006 01 Panel boards submittal by alasry-ABB FINAL - Coastal Village Professional Beach Club Rev 01 Accepted with Comments


ATTRIBUTES

Attribute 1 Site Wide

https://ksa1.aconex.com/Logon 1/2
Refer to comments on attached sheets.

B.Haddad/J.Mahrous 24/10/2016
18
2
19
20
21
TECHNICAL SUBMISSION

RECEIVED FROM CONTRACTOR ON

16 JUN 2021

CODE A CODE B CODE C

Material Order May Proceed Material Order May Proceed Material Order may NOT Proceed
Construction may Proceed after Incoprorate comments and Re-
Construction may proceed
incorporating comments - Re-submit submit

ISSUED TO CONTRACTOR ON

21 JUN 2021
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
3/8/2021 asryelectric.com Mail - Approved: Supplier registration with The Red Sea Development Company

ASRY ELECTIC INFO . <info@asryelectric.com>

Approved: Supplier registration with The Red Sea Development Company


1 message

Ariba Administrator <no-reply@smtp.mn2.ariba.com> Sun, Mar 7, 2021 at 5:12 PM


To: Feras Khiyar <info@asryelectric.com>

Registration with The Red Sea Development Company.

Congratulations! The Red Sea Development Company has approved your


initial supplier registration. AL ASRY ELECTRIC CO. LTD. is now registered
and an invite to the next stage of the qualification process will be issued.

You will be notified when next step of the qualification process require your
attention.

You are receiving this email because your customer, The Red Sea Development Company, has identified you as
the appropriate contact for this correspondence. If you are not the correct contact, please contact The Red Sea
Development Company.

The Red Sea Development Company

Offices | Data Policy | Contact Us | Customer Support

Powered by

https://mail.google.com/mail/u/3?ik=b73c9bc58a&view=pt&search=all&permthid=thread-f%3A1693582742933411039%7Cmsg-f%3A16935827429334… 1/1
3/2/2021 asryelectric.com Mail - Approved: Supplier registration with Qiddiya Investment Company

ASRY ELECTIC INFO . <info@asryelectric.com>

Approved: Supplier registration with Qiddiya Investment Company


1 message

Ariba Administrator <no-reply@smtp.mn2.ariba.com> Mon, Mar 1, 2021 at 5:38 PM


To: SHERIF HASSAN <info@asryelectric.com>

Qiddiya Investment Company

Registration with Qiddiya Investment Company.

Congratulations! Qiddiya Investment Company has approved your supplier


registration. AL ASRY ELECTRIC CO. LTD. has now been included in the
supplier database of Qiddiya Investment Company.

You will be notified when next steps of the supplier onboarding process require
your attention.

You are receiving this email because your customer, Qiddiya Investment Company, has identified you as the
appropriate contact for this correspondence. If you are not the correct contact, please contact Qiddiya
Investment Company.

Offices | Data Policy | Contact Us | Customer Support

Powered by

https://mail.google.com/mail/u/3?ik=b73c9bc58a&view=pt&search=all&permthid=thread-f%3A1693040782396962033%7Cmsg-f%3A16930407823969… 1/1
2/28/2021 asryelectric.com Mail - Approved: Supplier registration with NEOM

ASRY ELECTIC INFO . <info@asryelectric.com>

Approved: Supplier registration with NEOM


1 message

Neom <no-reply@smtp.mn2.ariba.com> Tue, Feb 23, 2021 at 5:33 PM


To: SHERIF HASSAN <info@asryelectric.com>

NEOM

Registration with NEOM.


Congratulations! We are pleased to inform you that NEOM has approved your
supplier registration. AL ASRY ELECTRIC CO. LTD. has now been included in
the supplier database of NEOM.
From now onwards, your company may receive request(s) to participate in
tenders (RFP/RFQ) for Goods and/or Services and/or Projects in line with your
competencies. However, please do not read into this email that it constitutes a
guarantee that you will receive any such requests, as those are dependent on
many factors evaluated according to our discretion as needs arise.
You will be notified when next steps of the supplier onboarding process require
your attention.
We appreciate your interest in becoming A NEOM supplier and look forward to
the opportunity to work with you.

You are receiving this email because your customer, NEOM, has identified you as the appropriate contact for this
correspondence. If you are not the correct contact, please contact NEOM.

Offices | Data Policy | Contact Us | Customer Support

Powered by

https://mail.google.com/mail/u/3?ik=b73c9bc58a&view=pt&search=all&permthid=thread-f%3A1692496876183023768%7Cmsg-f%3A16924968761830… 1/1
Material Submittal form
Submittal Ref: DHP-KAC-PMO-MAT-EL-0046 Rev No: 00 Date: 19/10/2021
Program Title: Development Housing Project wave 3
Project Title: ALL Project
The Employer: National Housing Company
Third party: Saudi Arabian Parsons Ltd. SAPL
Consultant: EHAF CONSULTING ENGINEER
Contractor: Kabbani Architectural Concept (KAC)

Guidance notes:
The submission should only include materials which are compliant with the SOPR and CODE requirements and have been reviewed and
coordinated between the Contractor and Designer (and Engineer if applicable) and should include any authorised variations/changes as
instructed.

Review Discipline
Architectural ☐ Structural/Civil ☐ Mech/Plumb ☐ Elec. ☒ Others (specify ☐

Material Details

Notes: SAPL review will recommend either Objection or No Objection to each item. Non-Objected shall be issued to the NHC with the
recommendation to approve. Objected shall be returned to the Contractor with an Objection report. This sheet must be signed by any specialist
sub-contractor applicable to the Material element Design/Production (e.g. Pre-cast panel manufacturer)

Proposed by:
The Contractor The Consultant (Designer & The Engineer) Specialist /Sub-Contractor
Sign/Stamp Sign/Stamp Sign/Stamp

Material Information & Checklist


SAPL REVIEW

Location /element Checklist of Attachments:


Ref:
Specified Material: LOW VOLTAGE DISTRIBUTION PANEL BOARD Drawing/Specification ☒
Proposed Material: LOW VOLTAGE DISTRIBUTION PANEL BOARD Product Datasheet ☒
SOPR/CODE Ref(s): Compliance Certificates/Documents ☒
Manufacturer & LARSEN & TOUBRO BY AL ASRY ELECTRIC COMPANY Compliance Statement ☐
Product code ref:
Remarks/Notes: Sample (available) ☐

THE Review Date: Rejected Approved


Signed:
ENGINEER* Print Name:

SAPL Recommendations to NHC Date: Objection No Objection


Signed:
Print Name:
Images of the finish product of the fabricated PB showing the ff (enclosure, inside arrangement of devices etc.) shall be provided.
Review Date: Objection No Objection
NHC Signed:
Print Name:

NHC Program – Material Submittal Form Company Confidential 1


08/08/2022
M.EMARA
M.EMARA
Submit SASO certificates for factory and materials. -The steel of the Enclosure of the panel board should be galvanized and submit a test for corrosion and country certificate. -3. The rating of C.B not approved - 4. Submit sample

Circuit Breakers ratings shall be as per the latest approved SLD.


AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 5

Appreciation Letters & Completion Certificate

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
Top Pioneers General
Contracting Est. ΔϣΎόϟ΍ΕϻϭΎϘϣϠϟΩ΍ϭέϟ΍ϝ΋΍ϭ΃Δγγ΅ϣ

For
ALASRY ELECTRIC CO
Dammam 2nd Industrial City

Dear ALASRY ELECTRIC CO.

I sincerely thank you for your dedication and commitment


towards the NWWC ADMIN BULDING Your work is truly
commendable and we appreciate your contribution to PROVIDE
ALL PANELS ON TIME AND HIGHLY EFFICIENT

Once again, I would like to thank for your hard work and
dedication - you are a valued member of our works.

Best wishes,

TOP PIONEERS GM,


MOUSTAFA MOHAMED

P.O 3188 – KHOBAR 3446 3446 έΑΧϟ΍ - 3188 Ώ.ι

Saudi Arabia - C.R 2051230952 2051230952 Ε . α ΔϳΩϭόγϟ΍ ΔϳΑέόϟ΍ ΔϛϠϣϣϟ΍

Phone : 00966138354622 00966138354622 : ϝ΍ϭΟ

Mobile : 00966507771064 00966507771064 : ϥϭϔϳϠΗ

Mail : info @toppioneers.com info @toppioneers.com: ϰϧϭέΗϛϟϻ΍ ΩϳέΑϟ΍



Top Pioneers General Contracting Est.

This Is Awarded To

In recognition of their outstanding work and completion of manufacturing the LV panel


boards for __NWWC ADMIN BUILDING __project.

MOUSTAFA MOUHAMED
Name
Project Manager
AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 6

Test Reports

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 7

List of Major Projects

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
List Major Project of 2022
ITEM NO. NAME of CONTRACTOR PROJECT
1 within CoNSTRUCTION JACOBJETT,Wareheuse &workshop
2 ALyamama Company. Jufura Project
3 Isma K.Kabbani Group of companies (IKK) EXC21-0001-Petroleum Conversion Research center in KFUPM
4 DACO panels of (506) Bulilding in Jubaill Commercial Port
5 Critical Engineering Inochem Project
6 Isma K.Kabbani Group of companies (IKK) Beach Club
7 ARCON BH CWI SAUDI ARABIA PRODCUTION FACILTY
8 ARCON Tareq Zedan Villa
9 ELECTRONIC VISION COMPANY aramco Mutrafia Increment-2
10 SHADE CORPORATIONLTD p0243 Electrical Completian
11 SHADE CORPORATION LTD PO 257 Baker Hughes
12 IKK Group Beach club
13 ALAA ALAFAQ Co KHALIJ SABANYA TMC FUEL STATAION PROJE
14 Al-Yamama CompanyFor Trading and Contracting ISFB Jizan Project
15 faisal Electro-Mechnical Co.LTD1 Sea Water cooling supply and retunrne work phase 2
16 al Anwar Eastern CO kHALIJ PROJE
17 FMSCO RC318-C01_SWITCH
18 Al Khateeb United Co.LLC Rawdah Fule Station -TMC
19 Al-Yamama Compan Water and Sewage Al Khober
20 NGMSA SQWEC_Shuqaiq Water and Electricity Plant Security
21 AL Kateeb United Co. LLC TMC Ibn Al-Haitham Fuel Station
22 Zamil Offshore NEW EXTENTION PANELS
23 Nesma & Partners company AL-Ula Ashar project
24 Arabian Power Company (APEC) APEC-1162
25 Critical Engineering Inochem Project
26 ALyamama Company. US Army Project
27 GARAH ELECTRO MECHANICAL Amaad Business Park
28 MAJD AL MAALI CONTRACTING COMPANY Zahid tractor Dammam yard
29 Al Jabr Holding Company Hamed Oncology Center
30 Surooh AL-Tanmiah Trdinh &Contracting provide project -Villa
31 Surooh AL-Tanmiah Trdinh &Contracting AL AHSA PROJECT
32 Critical Engineering INOCHEM SODA ASH AND CALCIUM CHLORIDE
33 NGMSA HCIS Security Project
34 Al Yamama Co. Neom Logistic Park
35 SHADE CORPPRATION LTD BHGE Polyflow Manufacturing
36 Arabian Power Company APEC-11724
37 NGMSA HCIS Security Project (GASCO-QASSIM & MADINA)
38 Alfawood Industries Installation Of Contactors
39 Arabin Consolidated Comt Co Khamis Mushait Project
40 SHADE CORPPRATION LTD BHGE Polyflow Manufacturing
41 Surooh AL-Tanmiah Trdinh &Contracting Construction of Battalion Project
42 SHADE CORPORATION LTD p0257-E Baker Hughes Abqaiq
43 FIELDS MODERN SOLUTION CO RC 318-C01
44 ALAA ALAFAQ Co F uel Station - sultania
45 Shead Corporation Ltd p0257-E Baker Hughes
46 Surooh AL-Tanmiah Trdinh &Contracting Tanajib Project
47 Thabat Contracting Co Essam Muhaidib Private Villa Project
48 FIELDS MODERN SOLUTION CO RC318-C01_LCP
49 Hawa Electric Panel Board Factory& Co Loose Material Supply for AC/DC
AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 7

Copy of License

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
‫‪١٤٤٤/٠٥/١٨‬‬ ‫ﺍﻟﺘﺎﺭﻳﺦ‬
‫‪١٢/١٢/٢٠٢٢‬‬ ‫ﺍﻟﻤﻮﺍﻓﻖ‬
‫ﺭﻣﺰ ﺍﻟﺸﻬﺎﺩﺓ ‪٥١٠١٩٨٦٧‬‬

‫ﺷﻬﺎﺩﺓ‬

‫ﺷﺮﻛﺔ ﺍﻟﻌﺼﺮﻱ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻤﺤﺪﻭﺩﺓ‬


‫ﺇﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ ‪:‬‬
‫ﺹ‪.‬ﺏ ‪ ١٠٩٠٩ :‬ﺍﻟﺪﻣﺎﻡ ‪٣٤٣٢٦‬‬
‫ﺍﻟﺴﻌﻮﺩﻳﺔ‬
‫‪٥٠٢٥١٧١٣٩‬‬ ‫ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ ‪:‬‬
‫ﻣﺼﺪﺭﻩ ‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‪٢٠٥٠٠٤٨٢٦٥ :‬‬

‫ﻛﺘﺎﺑﺔ‬ ‫ﺭﻗﻤﺎ‬
‫ﺍﺛﻨﺎ ﻋﺸﺮﻩ ﻣﺸﺘﺮﻛﺎ‬ ‫‪١٢‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﻭﺍﺣﺪ ﻭ ﺍﺭﺑﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٤١‬‬ ‫ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ‬
‫ﺛﻼﺛﺔ ﻭ ﺧﻤﺴﻮﻥ ﻣﺸﺘﺮﻛﺎ‬ ‫‪٥٣‬‬ ‫ﺍﻟﻤﺠﻤﻮﻉ‬

‫ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ‬
‫ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ‪ ،‬ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ‪ ،‬ﻭﻫﻲ‬
‫ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ )‪ (١٩/٦‬ﻣﻨﻪ‪.‬‬
‫ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ‪ ١٤٤٤/٠٦/١٧‬ﻫـ‪.‬‬
‫ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ‬ ‫ﺃﻭ‬ ‫ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ‬
‫ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ ‪:‬‬ ‫ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ‬

‫‪www.gosi.gov.sa/vc‬‬

‫) ﺍﻟﺸﻬﺎﺩﺓ ﻣﻌﺘﻤﺪﺓ ﻣﻦ ﺻﺎﺣﺐ ﺍﻟﺼﻼﺣﻴﺔ ﻭﻻ ﺗﺤﺘﺎﺝ ﺇﻟﻰ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ (‬

‫ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ‪ ،‬ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ‬
‫ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ‪ ،‬ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ‪ ،‬ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ‬
‫ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ‪ ،‬ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ‬
‫ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ‪ ،‬ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ‬
‫ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ ‪.‬‬
‫‪594144224013220‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ ‪:‬‬
‫‪1445/3/6‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻧﺘﻬﺎء ‪:‬‬ ‫ﺭﺧﺼﺔ ﺗﺸﻐﻴﻞ‬
‫ﺷﺮﻛﺔ ﺍﻟﻌﺼﺮﻱ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﻳﺮﺧﺺ ﻟـ‪: ‬‬

‫ﺭﺳﻢ ﺗﻮﺿﻴﺤﻲ ﻟﻠﻤﻮﻗﻊ‬ ‫‪1440/1/28‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻧﺘﻬﺎء ‪:‬‬ ‫‪1426/4/15‬‬ ‫ﺗﺎﺭﻳﺨﻪ ‪:‬‬ ‫‪2050048265‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ‪:‬‬

‫ﺍﻟﺪﻣﺎﻡ ﺍﻟﺜﺎﻧﻴﺔ‬ ‫ﺍﻟﻤﺪﻳﻨﺔ ﺍﻟﺼﻨﺎﻋﻴﺔ ‪:‬‬


‫‪50244‬‬ ‫ﺭﻗﻢ ﺍﻟﻌﻘﺪ ‪:‬‬

‫‪0050M00178‬‬ ‫ﻣﻮﻗﻊ ﺍﻟﻌﻘﺎﺭ ‪:‬‬

‫ﺍﻟﺸﺮﻭﻁ ﻭﺍﻷﻧﻈﻤﺔ‪:‬‬

‫‪.1‬ﺗﻌﻨﻲ ﻫﺬﻩ ﺍﻟﺮﺧﺼﺔ ﺍﻹﺫﻥ ﺑﺘﺸﻐﻴﻞ ﺍﻟﻤﻨﺸﺄﺓ ﻭﺃﻥ ﺍﻟﻤﺮﺧﺺ ﻟﻪ ﺑﺘﺸﻐﻴﻞ ﻫﺬﻩ ﺍﻟﻤﻨﺸﺄﺓ ﻫﻮ ﺍﻟﻤﺸﻐﻞ ﺍﻟﺤﻘﻴﻘﻲ ﻟﻪ ﻭﻓﻖ ﻛﻴﺎﻧﻪ ﺍﻟﻘﺎﻧﻮﻧﻲ ﻭﺗﺮﺍﺧﻴﺼﻪ ﻭﺳﺠﻼﺗﻪ ﻭﻻ ﻳﺤﻖ ﻟﺼﺎﺣﺐ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﻨﺎﺯﻝ ﻋﻦ‬
‫ﺍﻟﺘﺸﻐﻴﻞ ﻭﺍﻟﺮﺧﺼﺔ ﺃﻭ ﺃﻱ ﺟﺰء ﻣﻨﻬﺎ ﻟﻠﻐﻴﺮ‪..‬‬

‫‪. 2‬ﻳﻠﺘﺰﻡ ﺍﻟﻤﺮﺧﺺ ﻟﻪ ﺑﺎﻟﺘﻘﻴﺪ ﺑﺎﻝ ﺷﺮﻭﻁ ﻭﺍﻻﻟﺘﺰﺍﻣﺎﺕ ﺍﻟﻤﻜﺘﻮﺑﺔ ﻓﻲ ﻫﺬﻩ ﺍﻟﺮﺧﺼﺔ ﻭﺑﻜﺎﻓﺔ ﺍﻷﻧﻈﻤﺔ ﻭﺍﻟﻠﻮﺍﺋﺢ ﻭﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﺍﻟﺼﺎﺩﺭﺓ ﻣﻦ" ﻣﺪﻥ"‪ ،‬ﻭﻳﺘﻢ ﺍﻟﺮﺟﻮﻉ ﻟﻸﻧﻈﻤﺔ ﻭﺍﻟﻠﻮﺍﺋﺢ ﺍﻟﺴﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ‬
‫ﺍﻟﻤﻌﻤﻮﻝ ﺑﻬﺎ ﻓﻲ ﺍﻟﻤﻤﻠﻜﺔ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﺴﻌﻮﺩﻳﺔ ﻓﻴﻤﺎ ﻟﻢ ﻳﺮﺩ ﺑﺸﺄﻧﻪ ﺗﻨﻈﻴﻢ ﻟﺪﻯ" ﻣﺪﻥ‪".‬‬

‫‪. . 3‬ﻳﻠﺘﺰﻡ ﺍﻟﻤﺮﺧﺺ ﻟﻪ ﺑﺘﺠﺪﻳﺪ ﻫﺬﻩ ﺍﻟﺮﺧﺼﺔ ﺧﻼﻝ ﻣﺪﺓ ﻻ ﺗﺰﻳﺪ ﻋﻦ ‪ 15‬ﻳﻮﻣﺎ ﺑﻌﺪ ﺍﻧﺘﻬﺎﺋﻬﺎ‪.‬‬
‫ﻋﻘﺪ ﺍﻹﻳﺠﺎﺭ ﺳﺎﺭﻱ ﺣﺘﻰ ‪ 1452/5/7 :‬ﻫـ‬
‫ﺗﺮﺧﻴﺺ ﻣﻨﺸﺄﺓ ﺻﻨﺎﻋﻴﺔ‬

‫ﺍﺳﺘﺜﻤﺎﺭ ﻭﻃﻨﻲ‬

‫‪١٤٤٣-٠٦-١٧‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻘﺮﺍﺭ‬ ‫‪١٤٢٦-٠٣-٢٨‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﺘﺮﺧﻴﺺ‬ ‫‪٢٦٢٥٤‬‬ ‫ﺭﻣﺰ ﺍﻟﻤﻨﺸﺄﺓ‬


‫‪١٤٤٤-٠٦-٢٣‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻧﺘﻬﺎﺀ‬ ‫‪٤٣١١٢١١١٦٧١٥‬‬ ‫ﺭﻗﻢ ﺍﻟﻘﺮﺍﺭ‬ ‫ﺗﺤﻮﻳﻞ ﻧﻮﻉ ﺍﻹﺳﺘﺜﻤﺎﺭ‬ ‫ﻧﻮﻉ ﺍﻟﻘﺮﺍﺭ‬

‫‪+٩٦٦٥٦٤٤٠٧١١١‬‬ ‫ﻫﺎﺗﻒ‬ ‫ﺷﺮﻛﺔ ﺍﻟﻌﺼﺮﻱ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﺍﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺼﻨﺎﻋﻴﺔ‬


‫ﻓﺎﻛﺲ‬ ‫‪٢٠٥٠٠٤٨٢٦٥‬‬ ‫ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﻟﻠﻤﻨﺸﺄﺓ ﺍﻟﺼﻨﺎﻋﻴﺔ‬
‫)‪(N26.254057810198297 ,E49.98347997665405‬‬ ‫ﻣﻮﻗﻊ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺼﻨﺎﻋﻴﺔ‬ ‫ﺷﺮﻛﺔ ﺍﻟﻌﺼﺮﻱ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﻣﺎﻟﻚ ﺍﻟﻤﻨﺸﺄﺓ‬
‫ﺍﻟﻤﻨﻄﻘﺔ ﺍﻟﺸﺮﻗﻴﺔ‬ ‫ﺍﻟﻤﻨﻄﻘﺔ‬ ‫‪٢٠٥٠٠٤٨٢٦٥‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ ﺍﻟﺮﺋﻴﺴﻲ‬
‫ﺍﻟﺪﻣﺎﻡ‬ ‫ﺍﻟﻤﺪﻳﻨﺔ‬ ‫ﺻﻨﻊ ﺍﻟﻤﺤﺮﻛﺎﺕ ﻭﺍﻟﻤﻮﻟﺪﺍﺕ ﻭﺍﻟﻤﺤﻮﻻﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﻭﺃﺟﻬﺰﺓ‬ ‫ﺍﻟﻨﺸﺎﻁ ﺍﻟﺮﺋﻴﺴﻲ‬
‫ﺗﻮﺯﻳﻊ ﺍﻟﻜﻬﺮﺑﺎﺀ ﻭﺍﻟﺘﺤﻜﻢ ﻓﻴﻬﺎ ‪٢٧١٠ /‬‬

‫ﻣﺎﺋﺔ ﻭ ﻋﺸﺮ ﻓﺮﺩﺍَ‬ ‫‪١١٠‬‬ ‫ﻋﺪﺩ ﺍﻟﻌﻤﺎﻟﺔ‬


‫ﺧﻤﺴﺔ ﻣﻼﻳﻴﻦ ﻭ ﺭﻳﺎﻝ‬ ‫‪٥٠٠٠٠٠٠.٠٠‬‬ ‫ﺣﺠﻢ ﺍﻻﺳﺘﺜﻤﺎﺭ‬

‫ﺍﻟﻮﺣﺪﺓ‬ ‫ﺍﻟﻄﺎﻗﺔ ﺍﻻﻧﺘﺎﺟﻴﺔ‬ ‫ﺍﻟﻨﺸﺎﻁ ﺍﻟﺼﻨﺎﻋﻲ‬ ‫ﻭﺻﻒ ﺍﻟﻤﻨﺘﺞ‬ ‫ﺭﻣﺰ ﺍﻟﻤﻨﺘﺞ‬

‫ﻭﺣﺪﺓ‬ ‫‪٢٠.٠‬‬ ‫‪ / ٢٧١٠١٠‬ﺻﻨﺎﻋﺔ ﺍﻟﻤﺤﺮﻛﺎﺕ ﻭﺍﻟﻤﻮﻟﺪﺍﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬ ‫ﻣﺤﻄﺎﺕ ﺗﺤﻮﻳﻞ ﻓﺮﻋﻴﺔ‬ ‫‪٨٥٠٤٢٣٠٠‬‬

‫ﻭﺣﺪﺓ‬ ‫‪٢٠.٠‬‬ ‫‪ / ٢٧٩٠٠٢‬ﺻﻨﺎﻋﺔ ﺍﻷﺟﺰﺍﺀ ﻭﺍﻟﻮﺻﻼﺕ ﻭﺍﻟﻤﻠﺤﻘﺎﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻐﻴﺮ ﻣﺼﻨﻔﺔ ﻓﻲ ﻣﻜﺎﻥ ﺁﺧﺮ‬ ‫ﻭﺣﺪﺍﺕ ﺣﻠﻘﻴﺔ ﺭﺋﻴﺴﻴﺔ‬ ‫‪٨٥٣٥٩٠٠٠‬‬

‫ﻭﺣﺪﺓ‬ ‫‪٥٠٠٠.٠‬‬ ‫‪ / ٢٧٩٠٠٢‬ﺻﻨﺎﻋﺔ ﺍﻷﺟﺰﺍﺀ ﻭﺍﻟﻮﺻﻼﺕ ﻭﺍﻟﻤﻠﺤﻘﺎﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻐﻴﺮ ﻣﺼﻨﻔﺔ ﻓﻲ ﻣﻜﺎﻥ ﺁﺧﺮ‬ ‫ﻣﻔﺎﺗﻴﺢ ﻛﻬﺮﺑﺎﺋﻴﺔ ﻭﺍﻓﻴﺎﺵ ﻭﻣﻘﺎﺑﺲ‬ ‫‪٨٥٣٦٥٠٩٠‬‬

‫ﻭﺯﻳﺮ ﺍﻟﺼﻨﺎﻋﺔ ﻭﺍﻟﺜﺮﻭﺓ ﺍﻟﻤﻌﺪﻧﻴﺔ‬

‫ﺑﻨﺪﺭ ﺑﻦ ﺇﺑﺮﺍﻫﻴﻢ ﺍﻟﺨﺮﻳﻒ‬


‫ﺗﺮﺧﻴﺺ ﻣﻨﺸﺄﺓ ﺻﻨﺎﻋﻴﺔ‬

‫ﺍﺳﺘﺜﻤﺎﺭ ﻭﻃﻨﻲ‬

‫ﺍﻟﻮﺣﺪﺓ‬ ‫ﺍﻟﻄﺎﻗﺔ ﺍﻻﻧﺘﺎﺟﻴﺔ‬ ‫ﺍﻟﻨﺸﺎﻁ ﺍﻟﺼﻨﺎﻋﻲ‬ ‫ﻭﺻﻒ ﺍﻟﻤﻨﺘﺞ‬ ‫ﺭﻣﺰ ﺍﻟﻤﻨﺘﺞ‬

‫ﻭﺣﺪﺓ‬ ‫‪١٢٠.٠‬‬ ‫‪ / ٢٧١٠٣٠‬ﺻﻨﺎﻋﺔ ﺃﺟﻬﺰﺓ ﺍﻟﺘﻮﺯﻳﻊ ﻭﺍﻟﺘﺤﻜﻢ ﺑﺎﻟﻜﻬﺮﺑﺎﺀ‬ ‫ﻟﻮﺣﺎﺕ ﺗﻮﺯﻳﻊ ﻭﺗﺤﻜﻢ ﻛﻬﺮﺑﺎﺋﻴﺔ‬ ‫‪٨٥٣٧٢٠٠٠‬‬

‫ﻭﺣﺪﺓ‬ ‫‪١٠٠٠.٠‬‬ ‫‪ / ٢٧٩٠٠٢‬ﺻﻨﺎﻋﺔ ﺍﻷﺟﺰﺍﺀ ﻭﺍﻟﻮﺻﻼﺕ ﻭﺍﻟﻤﻠﺤﻘﺎﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻐﻴﺮ ﻣﺼﻨﻔﺔ ﻓﻲ ﻣﻜﺎﻥ ﺁﺧﺮ‬ ‫ﻟﻮﺣﺎﺕ ﻭﺍﺟﺰﺍﺀ ﺍﺧﺮ ﻟﻀﺒﻂ ﻭﺗﻨﻈﻴﻢ ﺍﻭ‬ ‫‪٨٥٣٨١٠٠٠‬‬
‫ﺗﻮﺯﻳﻊ ﺍﻟﺘﻴﺎﺭ ﺍﻟﻜﻬﺮﺑﺎﺋﻰ‬
‫ﻭﺣﺪﺓ‬ ‫‪١٥.٠‬‬ ‫‪ / ٢٧١٠١٠‬ﺻﻨﺎﻋﺔ ﺍﻟﻤﺤﺮﻛﺎﺕ ﻭﺍﻟﻤﻮﻟﺪﺍﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬ ‫ﻗﻮﺍﻃﻊ ﺗﻴﺎﺭ ﺫﺍﺗﻴﺔ )ﺍﺗﻮﻣﺎﺗﻴﻜﻴﺔ( ﺑﺠﻬﺪ ‪15‬‬ ‫‪٨٥٣٥٢١٠٠‬‬
‫‪ 24 -‬ﻙ‪.‬ﻑ ﺍﻟﻤﺘﻮﺳﻂ‬
‫ﻭﺣﺪﺓ‬ ‫‪٣٦٠.٠‬‬ ‫‪ / ٢٧١٠٢٠‬ﺻﻨﺎﻋﺔ ﺍﻟﻤﺤﻮﻻﺕ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬ ‫ﻛﺒﺎﺋﻦ ﺗﻮﺯﻳﻊ ﻛﻬﺮﺑﺎﺋﻴﺔ ﻣﺘﻨﻮﻋﺔ‬ ‫‪٨٥٣٨١٠٠٠‬‬

‫ﻭﺣﺪﺓ‬ ‫‪٢٠٠.٠‬‬ ‫‪ / ٢٧٣٢٠٢‬ﺻﻨﺎﻋﺔ ﺍﻷﺳﻼﻙ ﻭﺍﻟﻜﺎﺑﻼﺕ ﺍﻟﻤﻌﺰﻭﻟﺔ ﺍﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺍﻟﻨﺤﺎﺱ‬ ‫ﺍﺳﻼﻙ ﻭﻛﺎﺑﻼﺕ ﻛﻬﺮﺑﺎﺋﻴﺔ ﺟﻬﺪ ﻣﻨﺨﻔﺾ‬ ‫‪٨٥٤٤٦٠٩٠‬‬

‫ﻭﺯﻳﺮ ﺍﻟﺼﻨﺎﻋﺔ ﻭﺍﻟﺜﺮﻭﺓ ﺍﻟﻤﻌﺪﻧﻴﺔ‬

‫ﺑﻨﺪﺭ ﺑﻦ ﺇﺑﺮﺍﻫﻴﻢ ﺍﻟﺨﺮﻳﻒ‬


‫ﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﺍﻟﺨﺎﺻﺔ ﺑﺘﻨﻔﻴﺬ ﺍﻟﺘﺮﺧﻴﺺ‬
‫‪ .١‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﻤﻮﺍﺩ ﻗﺎﻧﻮﻥ )ﻧﻈﺎﻡ( ﺍﻟﺘﻨﻈﻴﻢ ﺍﻟﺼﻨﺎﻋﻲ ﺍﻟﻤﻮﺣﺪ ﻟﺪﻭﻝ ﻣﺠﻠﺲ ﺍﻟﺘﻌﺎﻭﻥ ﻟﺪﻭﻝ ﺍﻟﺨﻠﻴﺞ ﺍﻟﻌﺮﺑﻴﺔ‬
‫ﻭﻻﺋﺤﺘﻪ ﺍﻟﺘﻨﻔﺬﻳﺔ‪.‬‬
‫‪ .٢‬ﻋﺪﻡ ﺇﺟﺮﺍﺀ ﺃﻱ ﺗﻮﺳﻌﺔ ﺃﻭ ﺗﻌﺪﻳﻞ ﻓﻰ ﺍﻟﻤﻨﺘﺠﺎﺕ ﻗﺒﻞ ﺍﻟﺤﺼﻮﻝ ﻋﻠﻰ ﻣﻮﺍﻓﻘﺔ ﺍﻟﻮﺯﺍﺭﺓ‪.‬‬
‫‪ .٣‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﺘﺤﺪﻳﺚ ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺼﻨﻊ ﻛﻞ ﺳﺘﺔ ﺍﺷﻬﺮ ﻣﻦ ﺧﻼﻝ ﻣﻮﻗﻊ ﺍﻟﻮﺯﺍﺭﺓ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ‪.‬‬
‫‪ .٤‬ﺍﻟﺘﺰﺍﻡ ﻣﻄﺎﺑﻘﺔ ﺍﻟﻤﻨﺘﺠﺎﺕ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﻭﺍﻟﻤﻘﺎﻳﻴﺲ ﺍﻟﻤﻌﺘﻤﺪﺓ ﺃﻭ ﺍﻟﻤﻮﺍﺻﻔﺎﺕ ﺍﻟﻤﺘﺒﻨﺎﺓ ﻣﻦ ﺍﻟﻬﻴﺌﺔ‬
‫ﺍﻟﺴﻌﻮﺩﻳﺔ ﻟﻠﻤﻮﺍﺻﻔﺎﺕ ﻭﺍﻟﻤﻘﺎﻳﻴﺲ‪.‬‬
‫‪ .٥‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﻤﻮﺍﺩ ﺍﻟﻨﻈﺎﻡ ﺍﻟﻌﺎﻡ ﻟﻠﺒﻴﺌﺔ ﻭﻻﺋﺤﺘﻪ ﺍﻟﺘﻨﻔﻴﺬﻳﺔ ﻟﻠﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ ﺍﻟﺒﻴﺌﺔ ﻣﻦ ﺍﻟﺘﻠﻮﺙ‪.‬‬
‫‪ .٦‬ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻷﻧﻈﻤﺔ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﻟﻮﺍﺋﺢ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻷﻣﻦ ﺍﻟﺼﻨﺎﻋﻲ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻌﺎﻣﺔ‪.‬‬
‫‪ .٧‬ﺍﻥ ﺗﻜﻮﻥ ﺣﺴﺎﺑﺎﺕ ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﺼﻨﺎﻋﻲ ﻣﻨﺘﻈﻤﺔ ﻭﻓﻘًﺎ ﻟﻸﺻﻮﻝ ﺍﻟﻤﺤﺎﺳﺒﻴﺔ ﻭ ﺍﻟﻘﻮﺍﻋﺪ ﺍﻟﻘﺎﻧﻮﻧﻴﺔ‬
‫ﺍﻟﻤﺮﻋﻴﺔ ﻭﺃﻥ ﻳﺰﻭﺩ ﺍﻟﻮﺯﺍﺭﺓ ﺑﺎﻟﻤﻴﺰﺍﻧﻴﺔ ﺍﻟﻌﻤﻮﻣﻴﺔ ﻣﺼﺎﺩﻕ ﻋﻠﻴﻬﺎ ﻣﻦ ﻣﺤﺎﺳﺐ ﻗﺎﻧﻮﻧﻲ ﻟﻜﻞ ﺳﻨﺔ ﻣﺎﻟﻴﺔ‪.‬‬
‫‪ .٨‬ﻋﺪﻡ ﺇﺳﺎﺀﺓ ﺍﺳﺘﻌﻤﺎﻝ ﺍﻟﻤﺰﺍﻳﺎ ﺍﻟﻤﻤﻨﻮﺣﺔ ﻟﻠﻤﺸﺮﻭﻉ‪.‬‬
‫‪ .٩‬ﺗﺰﻭﻳﺪ ﺍﻟﻮﺯﺍﺭﺓ ﺑﻤﺎ ﺗﻄﻠﺒﻪ ﻣﻦ ﺑﻴﺎﻧﺎﺕ ﻛﺎﻣﻠﺔ ﻭﺻﺤﻴﺤﺔ ﻋﻦ ﺍﻟﻤﺸﺮﻭﻉ‪.‬‬
‫‪ .١٠‬ﺍﻟﺴﻤﺎﺡ ﻟﻤﻮﻇﻔﻲ ﺍﻟﻮﺯﺍﺭﺓ ﺑﺪﺧﻮﻝ ﺍﻟﻤﺸﺮﻭﻉ ﺍﻟﺼﻨﺎﻋﻲ ﻭﺍﻹﻃﻼﻉ ﻋﻠﻰ ﺍﻟﺴﺠﻼﺕ ﻭﺍﻟﻤﺴﺘﻨﺪﺍﺕ‬
‫ﻭﺍﻟﺤﺴﺎﺑﺎﺕ ﻭﻣﺮﺍﻗﺒﺔ ﻋﻤﻠﻴﺔ ﺍﻹﻧﺘﺎﺝ ﻭﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﻧﺸﺎﻃﺎﺕ ﺍﻟﻤﺸﺮﻭﻉ‪.‬‬
‫‪ .١١‬ﻻﻳﺠﻮﺯ ﺇﻗﺎﻣﺔ ﻣﺸﺮﻭﻉ ﺻﻨﺎﻋﻲ ﺃﻭ ﺗﻮﺳﻌﺘﻪ ﺃﻭ ﺗﻄﻮﻳﺮﻩ ﺃﻭ ﺗﻐﻴﻴﺮ ﻣﻨﺘﺠﺎﺗﻪ ﺃﻭ ﺩﻣﺠﻪ ﺑﻤﺸﺮﻭﻉ ﺻﻨﺎﻋﻲ‬

‫‪www.mim.gov.sa‬‬
AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 8

Location Map

.POW£1R 6UAIR.D

Pre-Qualification Submittal:
AL ASRY ELECTRIC CO. LTD. � ibg>.3oll ii,!-il!J,ilill �Ji'WI �J.111
Switchgear & Panel Board Manufacturer

Annexure - 9

Organization Chart

.POW£1R 6UAIR.D

Pre-Qualification Submittal:

You might also like