Set2-PetE418-Midterm Examination-Signed
Set2-PetE418-Midterm Examination-Signed
Set2-PetE418-Midterm Examination-Signed
MIDTERM EXAMINATION
First Semester, AY 2022- 2023
SR-Code
Name of Student
Instructions to Students
1. Answer FORTY FOUR (44) questions ILOs Questions Points
2. Start each question on a separate page 1 11 50
3. This paper is in THREE (3) section(s) only 2 34 50
NO. SECTIONS POINTS
1. Multiple Choices 30
2. Essay/Short Answer 70
3. Problem Solving
4 Others
TOTAL POINTS 100
Page 1 of 5
Leading Innovations, Transforming Lives, Building the Nation
Republic of the Philippines
BATANGAS STATE UNIVERSITY
The National Engineering University
Alangilan Campus
Golden Country Homes, Alangilan Batangas City, Batangas, Philippines 4200
Tel Nos.: (+63 43) 425-0139 local 2121 / 2221
E-mail Address: ceafa@g.batstate-u.edu.ph | Website Address: http://www.batstate-u.edu.ph
1.
a. Diesel oil c. Crude oil
b. Pentane d. Gasoline
2.
a. Vapor pressure c. Temperature
b. Specific gravity d. Flash point
3.
a. Gauge Hatch c. Vapor vent
b. Breather valve d. Manhole
4.
a. Level control valve c. Chimney
b. Spreader d. Down comer
5.
a. Influent water c. Lubricants
b. Fire- fighting water d. Acids
6.
a. NPS 1 1/2 c. NPS 3 1/2
b. NPS 2 1/2 d. NPS 5
7.
a. Rim seal c. Overflow drain
b. Deck leg d. Pontoon Manhole
8.
a. Acetic acid c. Nitrotoluene
b. Isoprene d. Sulfuric acid
9.
a. High GOR c. Low GOR
b. More gas- liquid interface d. Less Pipping
10.
a. Carbon fiber c. Aramid
b. Steel d. Fiberglass
11.
a. Chloroform c. Chloroethanol
b. Acrolein d. Trichloroethylene
Page 2 of 5
Leading Innovations, Transforming Lives, Building the Nation
Republic of the Philippines
BATANGAS STATE UNIVERSITY
The National Engineering University
Alangilan Campus
Golden Country Homes, Alangilan Batangas City, Batangas, Philippines 4200
Tel Nos.: (+63 43) 425-0139 local 2121 / 2221
E-mail Address: ceafa@g.batstate-u.edu.ph | Website Address: http://www.batstate-u.edu.ph
21. The first-stage separator operating pressure is generally determined by the flowline pressure and
operating characteristics of the well. In situations in which the flowline pressure is less than 600 psi,
it is practical to let the first stage separator ride the line.
a. Statement 1 is true and Statement 2 is c. Statement 1 and 2 is true.
false.
b. Statement 1 is false and Statement 2 is d. Statement 1 and 2 is false.
true.
Page 2 of 5
Leading Innovations, Transforming Lives, Building the Nation
Republic of the Philippines
BATANGAS STATE UNIVERSITY
The National Engineering University
Alangilan Campus
Golden Country Homes, Alangilan Batangas City, Batangas, Philippines 4200
Tel Nos.: (+63 43) 425-0139 local 2121 / 2221
E-mail Address: ceafa@g.batstate-u.edu.ph | Website Address: http://www.batstate-u.edu.ph
25. The glycol circulating pump can be sized using the glycol circulation rate and the contactor's
maximum operating temperature. The lean glycol from the bottom of the contactor is used to power
the pump, while the rich glycol is pumped to the top of the contactor.
a. Statement 1 is true and Statement 2 is c. Statement 1 and 2 is true.
false.
b. Statement 1 is false and Statement 2 is d. Statement 1 and 2 is false.
true.
Page 3 of 5
Leading Innovations, Transforming Lives, Building the Nation
Republic of the Philippines
BATANGAS STATE UNIVERSITY
The National Engineering University
Alangilan Campus
Golden Country Homes, Alangilan Batangas City, Batangas, Philippines 4200
Tel Nos.: (+63 43) 425-0139 local 2121 / 2221
E-mail Address: ceafa@g.batstate-u.edu.ph | Website Address: http://www.batstate-u.edu.ph
Prepared by:
Approved by:
Page 4 of 5
Leading Innovations, Transforming Lives, Building the Nation