4 Front Elevation 4 Right Side Elevation: 2 3 4 5 1 A B C D
4 Front Elevation 4 Right Side Elevation: 2 3 4 5 1 A B C D
4 Front Elevation 4 Right Side Elevation: 2 3 4 5 1 A B C D
14.50
APEX LINE 11.00 APEX LINE
3.00 4.00 3.50 4.00
3.50 3.50 4.00
0.30 0.30
NGL NGL
1 2 3 4 5 D C B A
14.50
APEX LINE APEX LINE 11.00
4.00 3.50 4.00 3.00
4.00 3.50 3.50
0.30 0.30
NGL NGL
4 REAR ELEVATION
4 LEFT SIDE ELEVATION A 104 SCALE 1:100
NUMERO-UN
CONSTRUCTION INC MOVING SOLUTION COMPANY
DATE: DECEMBER 15, 2022
DRAWN BY:
A-104
CHECKED BY: SCALE: 1:100