GOVERNMENT MODEL SANSKRITI SENIOR SECONDARY SCHOOL

ACADEMIC YEAR : 2022-23

PROJECT REPORT ON
LIBRARY MANAGEMENT SYSTEM

NAME : Bhupander
ROLL NO. : 43

CLASS : XII
SUBJECT : COMPUTER SCIENCE
SUB CODE : 083

PROJECT GUIDE: Mrs. NISHA NEHRA PGT COMPUTER SCIENCE


GOVERNMENT MODEL SANSKRITI SENIOR
SECONDARY SCHOOL
YAMUNANAGAR DIST
HARYANA

1
CERTIFICATE

This is to certify that Cadet BHUPANDER Roll No: 43 has successfully completed

the project Work entitled LIBRARY MANAGEMENTS SYSTEM in the subject Computer

Science (083) laid down in the regulations of CBSE for the purpose of Practical

Examination in Class XII to be held in government model sanskriti senior secondary

school on 2022-23.

(NISHA NEHRA)
PGT Comp Sci

Examiner:

Name: _______________

Signature:

2
TABLE OF CONTENTS [ T O C ]

SER DESCRIPTION PAGE NO

01 ACKNOWLEDGEMENT 04

02 INTRODUCTION 05

03 OBJECTIVES OF THE PROJECT 05

04 PROPOSED SYSTEM 06

05 SYSTEM DEVELOPMENT LIFE CYCLE (SDLC) 07

06 PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE 08

07 FLOW CHART 15

08 SOURCE CODE 17

09 OUTPUT 22

10 TESTING 23

11 HARDWARE AND SOFTWARE REQUIREMENTS 26

12 INSTALLATION PROCEDURE 27

13 BIBLIOGRAPHY 29

3
ACKNOWLEDGEMENT

Apart from the efforts of me, the success of any project depends largely on the
encouragement and guidelines of many others. I take this opportunity to express my
gratitude to the people who have been instrumental in the successful completion of
this project.

I express deep sense of gratitude to almighty God for giving me strength for the
successful completion of the project.

I express my heartfelt gratitude to my parents for constant encouragement


while carrying out this project.

I gratefully acknowledge the contribution of the individuals who contributed in


bringing this project up to this level, who continues to look after me despite my flaws,

I express my deep sense of gratitude to the luminary The Principal, government


model sanskriti senior secondary school, who has been continuously motivating and
extending their helping hand to us.

I express my sincere thanks to the academician The Vice Principal, government


model sanskriti senior secondary school, for constant encouragement and the
guidance provided during this project

I am overwhelmed to express my thanks to The Administrative Officer for


providing me an infrastructure and moral support while carrying out this project in the
school.

My sincere thanks to Mrs NISHA NEHRA, Master In-charge, A guide, Mentor all
the above a friend, who critically reviewed my project and helped in solving each and
every problem, occurred during implementation of the project

The guidance and support received from all the members who contributed and
who are contributing to this project, was vital for the success of the project. I am
grateful for their constant support and help.

4
PROJECT ON LIBRARY MANAGEMENT SYSTEM

INTRODUCTION

This project is all about a software for library. It helps the Book Stall Owner to

have a full-fledged control over his/her stall. It adds a new stock, updates an existing

stock and ofcourse prints a receipt to the customer. Besides it displays a graph of the

sales of the current month.

OBJECTIVES OF THE PROJECT

The objective of this project is to let the students apply the programming

knowledge into a real- world situation/problem and exposed the students how

programming skills helps in developing a good software.

1. Write programs utilizing modern software tools.

2. Apply object oriented programming principles effectively when developing

small to medium sized projects.

3. Write effective procedural code to solve small to medium sized problems.

4. Students will demonstrate a breadth of knowledge in computer science, as

exemplified in the areas of systems, theory and software development.

5. Students will demonstrate ability to conduct a research or applied Computer

Science project, requiring writing and presentation skills which exemplify

scholarly style in computer science.

5
PROPOSED SYSTEM

Today one cannot afford to rely on the fallible human beings of be really wants

to stand against today’s merciless competition where not to wise saying “to err is

human” no longer valid, it’s outdated to rationalize your mistake. So, to keep pace with

time, to bring about the best result without malfunctioning and greater efficiency so to

replace the unending heaps of flies with a much sophisticated hard disk of the

computer.

One has to use the data management software. Software has been an ascent in

atomization various organisations. Many software products working are now in

markets, which have helped in making the organizations work easier and efficiently.

Data management initially had to maintain a lot of ledgers and a lot of paper work has

to be done but now software product on this organization has made their work faster

and easier. Now only this software has to be loaded on the computer and work can be

done.

This prevents a lot of time and money. The work becomes fully automated and

any information regarding the organization can be obtained by clicking the button.

Moreover, now it’s an age of computers of and automating such an organization gives

the better look.

6
SYSTEM DEVELOPMENT LIFE CYCLE (SDLC)

The systems development life cycle is a project management technique that


divides complex projects into smaller, more easily managed segments or phases.
Segmenting projects allows managers to verify the successful completion of project
phases before allocating resources to subsequent phases.
Software development projects typically include initiation, planning, design,
development, testing, implementation, and maintenance phases. However, the phases
may be divided differently depending on the organization involved.
For example, initial project activities might be designated as request,
requirements-definition, and planning phases, or initiation, concept-development, and
planning phases. End users of the system under development should be involved in
reviewing the output of each phase to ensure the system is being built to deliver the
needed functionality.

7
PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE

INITIATION PHASE

The Initiation Phase begins when a business sponsor identifies a need or an


opportunity.

The purpose of the Initiation Phase is to:

Identify and validate an opportunity to improve business accomplishments of


the organization or a deficiency related to a business need.
Identify significant assumptions and constraints on solutions to that need.
Recommend the exploration of alternative concepts and methods to satisfy the
need including questioning the need for technology, i.e., will a change in the
business process offer a solution?
Assure executive business and executive technical sponsorship. The Sponsor
designates a Project Manager and the business need is documented in a
Concept Proposal. The Concept Proposal includes information about the
business process andthe relationship to the Agency/Organization.
Infrastructure and the Strategic Plan. A successful Concept Proposal results in
a Project Management Charter which outlines the authority of the project
manager to begin
the project.

Careful oversight is required to ensure projects support strategic business


objectives and resources are effectively implemented into an organization's enterprise
architecture. The initiation phase begins when an opportunity to add, improve, or
correct a system is identified and formally requested through the presentation of a
business case. The business case should, at a minimum, describe a proposal’s
purpose, identify expected benefits, and explain how the proposed system supports
one of the organization’s business strategies. The business case should also identify
alternative solutions and detail as many informational, functional, and network
requirements as possible.

8
SYSTEM CONCEPT DEVELOPMENT PHASE

The System Concept Development Phase begins after a business need or opportunity
is validated by the Agency/Organization Program Leadership and the
Agency/Organization CIO.

The purpose of the System Concept Development Phase is to:

Determine the feasibility and appropriateness of the alternatives.


Identify system interfaces.
Identify basic functional and data requirements to satisfy the business need.
Establish system boundaries; identify goals, objectives, critical success factors,
and performance measures.
Evaluate costs and benefits of alternative approaches to satisfy the basic
functional requirements
Assess project risks
Identify and initiate risk mitigation actions, andDevelop high-level technical
architecture, process models, data models, and a concept of operations. This
phase explores potential technical solutions within the context of the business
need.
It may include several trade-off decisions such as the decision to use COTS
software products as opposed to developing custom software or reusing
software components, or the decision to use an incremental delivery versus a
complete, onetime deployment.
Construction of executable prototypes is encouraged to evaluate technology to
support the business process. The System Boundary Document serves as an
important reference document to support the Information Technology Project
Request (ITPR) process.
The ITPR must be approved by the State CIO before the project can move
forward.

9
PICTORIAL REPRESENTATION OF SDLC:

PLANNING PHASE

The planning phase is the most critical step in completing development,


acquisition, and maintenance projects. Careful planning, particularly in the early stages
of a project, is necessary to coordinate activities and manage project risks effectively.
The depth and formality of project plans should be commensurate with the
characteristics and risks of a given project. Project plans refine the information
gathered during the initiation phase by further identifying the specific activities and
resources required to complete a project.
A critical part of a project manager’ sjob is to coordinate discussions between
user, audit, security, design, development, and network personnel to identify and
document as many functional, security, and network requirements as possible. During
this phase, a plan is developed that documents the approach to be used and includes
a discussion of methods, tools, tasks, resources, project schedules, and user input.
Personnel assignments, costs, project schedule, and target dates are established.

10
A Project Management Plan is created with components related to acquisition
planning, configuration management planning, quality assurance planning, concept of
operations, system security, verification and validation, and systems engineering
management planning.

REQUIREMENTS ANALYSIS PHASE

This phase formally defines the detailed functional user requirements using
high-level requirements identified in the Initiation, System Concept, and Planning
phases. It also delineates the requirements in terms of data, system performance,
security, and maintainability requirements for the system. The requirements are
defined in this phase to alevel of detail sufficient for systems design to proceed. They
need to be measurable, testable, and relate to the business need or opportunity
identified in the Initiation Phase. The requirements that will be used to determine
acceptance of the system are captured in the Test and Evaluation MasterPlan.

The purposes of this phase are to:

Further define and refine the functional and data requirements and document
them in the Requirements Document,
Complete business process reengineering of the functions to be supported (i.e.,
verify what information drives the business process, what information is
generated, who generates it, where does the information go, and who
processes it),
Develop detailed data and process models (system inputs, outputs, and the
process.
Develop the test and evaluation requirements that will be used to determine
acceptable system performance.

DESIGN PHASE

The design phase involves converting the informational, functional, and


network requirements identified during the initiation and planning phases into unified
design specifications that developers use to scriptprograms during the development

11
phase. Program designs are c onstructed in various ways. Using a top-down approach,
designers first identify and link majorprogram components and interfaces, then
expand design layouts as they identify and link smaller subsystems and connections.
Using a bottom-up approach, designers first identify and link minor program
components and interfaces, then expand design layouts as they identify and link larger
systems and connections. Contemporary design techniques often use prototyping
tools that build mock-up designs of items such as application screens, database
layouts, and system architectures. End users, designers, developers, database
managers, and network administrators should review and refine the prototyped
designs in an iterative process until they agree on an acceptable design. Audit,
security, and quality assurance personnel should be involved in the review and
approval process. During this phase, the system is designed to satisfy the functional
requirements identified in the previous phase. Since problems in the design phase
could be very expensive to solve in the later stage of the software development, a
variety of elements are considered in the design to mitigate risk. These include:

Identifying potential risks and defining mitigating design features.


Performing a security risk assessment.
Developing a conversion plan to migrate current data to the new system.
Determining the operating environment.
Defining major subsystems and their inputs and outputs.
Allocating processes to resources.
Preparing detailed logic specifications for each software module. The result is
a draft System Design Document which captures the preliminary design for the
system.
Everything requiring user input or approval is documented and reviewed by the
user. Once these documents have been approved by the Agency CIO and
Business Sponsor, the final System Design Document is created to serve as the
Critical/Detailed Design for the system.
This document receives a rigorous review byAgency technical and functional
representatives to ensure that it satisfies the business requirements.
Concurrent with the development of the system design, the Agency Project
Manager begins development of the Implementation Plan, Operations and
Maintenance Manual, and the Training Plan.

12
DEVELOPMENT PHASE

The development phase involves converting design specifications into


executable programs. Effective development standards include requirements that
programmers and other project participants discuss design specifications before
programming begins. The procedures help ensure programmers clearly understand
program designs and functional requirements. Programmers use various
techniques to develop computer programs. The large transaction oriented
programs associated with financial institutions have traditionally been developed
using procedural programming techniques. Procedural programming involves the
line-by-line scripting of logical instructions that are combined to form a
program.Effective completion of the previous stages is a key factor in the success
of the Development phase. The Development phase consists of:

Translating the detailed requirements and design into system components.


Testing individual elements (units) for usability.
Preparing for integration and testing of the IT system.

INTEGRATION AND TEST PHASE

Subsystem integration, system, security, and user acceptance testing is


conducted during the integration and test phase. The user, with those
responsible for quality assurance, validates that the functional requirements, as
defined in the functional requirements document, are satisfied by the
developed or modified system. OIT Security staff assess the system security
and issue a security certification and accreditation prior to
installation/implementation.

Testing at the development facility by the contractor and possibly supported by


end users

13
Testing as a deployed system with end users working together with contract
personnel

Operational testing by the end user alone performing all functions.


Requirements are traced throughout testing,a final Independent Verification &
Validation evaluation is performed and all documentation is reviewedand
accepted prior to acceptance of the system.

IMPLEMENTATION PHASE

This phase is initiated after the system has been tested and accepted by the
user. In this phase, the system is installed to support the intended business functions.
System performance is compared to performance objectives established during the
planning phase. Implementation includes user notification, user training, installation of
hardware, installation of software onto production computers, and integration of the
system into daily work processes. This phase continues until the system is operating
in production in accordance with the defined userrequirements.

OPERATIONS AND MAINTENANCE PHASE

The system operation is ongoing. The system is monitored for continued


performance in accordance with user requirements and needed system modifications
are incorporated. Operations continue as long as the system can be effectively
adapted to respond to the organization’s needs. When modifications or changes are
identified, the system may reenter the planning phase.

Operate, maintain, and enhance the system.


Certify that the system can process sensitive information.
Conduct periodic assessments of the system to ensure the functional
requirements continue to be satisfied.
Determine when the system needs to be modernized, replaced, or retired.

14
Flow chart

Openthewinexplorerandopenthefile
courierservicesysteminthelocation;
C:\Users\Cadet\Desktop\balan\library
management system

Ifrunthefilecourierservicesystem.py

Theprogramrunsandyou can

LIBRARYMANAGEMENTSYSTEM

At first,wehavetocreatea account
tousebatmancourierservice
system

Andiftheuseralreadyhasan
accounthehastologinLIBRARY
MANAGEMENTSYSTEM

Thepyfileimportsanother
fileB_courier_menufromthe
location:
C:\Users\Cadet\Desktop\bal

TheimportedfileLOGINACCESS

With which you canusethe


LIBRARY

15
First it displaysyoufour
options

1.REGISTER

2.LOGIN

3.EXIT

Ifchoiceis Elif
1: Ifchoice choice
is2: is3:
then
then

It isforthenewvisitorswhere Display the


theycanregistertheirnew LOGINprocedure
account of theLIBRARY
ExecuteQUIT()

16
SOURCE CODE

================================================================

# PYTHON PROGRAM FILE : BOOK.py

import pymysql as cntr , datetime as __dt , matplotlib.pyplot


as plt
from random import shuffle
from tempfile import mktemp
from os import system , startfile

__db = cntr.connect(host = 'localhost' , user = 'root' ,


passwd = 'manager' , database = 'book_shop')
__cur = __db.cursor()
__db.autocommit(True)

#Function to check is it leap year


is_leapyear = lambda year: year% 4 ==0

#Functiontoget lastdate of month


def last_month(month , year):
if monthin (1,3,5,7,8,10,12) : return 31
elif month ==2 and is_leapyear(year) : return29
elif month ==2 :return 28
else :return 30

clrscreen = lambda :system("cls")

def view_stock() :
__cur.execute("selectBook_No ,Book_Name,Available_Stock from stock")
data = __cur.fetchall()
print("Book Number\tBook Name\tStock")
forrow in data: print(row[0] , '\t\t' ,row[1] ,'\t' ,row[2])

17
def add_stock() :
print('Add Stock'.center(89 ,'='))
bno = unique_book_no()
if bno :
print("Book Number : ",bno)
else :bno= int(input("Enterbook number: "))
bname= input("Enter theBook\'s Name :")
auth= input("EntertheAuthor of the Book : ")
publ =input("EnterthePublisher of theBook : ")
cost =eval(input("Enter theCostper Book: "))
stock =int(input("Enter the Quantity purchased : "))
__cur.execute("insert into stock values ({} ,'{}' ,'{}','{}', {} ,{},{} ,'{}')".format(bno, bname,
auth, publ ,cost ,stock, 0,__dt.date.today()))
print("Inserted Sucessfully !!!")

def add_user() :
user = input("Enter the user name :")
passwd =input("Entera Password : ")
passwd2 = input("Enter Password to confirm :")
if passwd == passwd2 :
__cur.execute("insert into users values('{}', '{}')".format(user, passwd))
print("Created Successfully!!!")
elif passwd != passwd2 : print("You've entered differentpasswords")

def sell_book() :
print('Purchase')
cname= input("Enter theCustomerName: ")
phno = int(input("Enter thephonenumber: "))
bno = int(input("Enter book number: "))
bname= input("Enter thenameof thebook :")
cost =eval(input("Enter thecostof thebook : "))
__cur.execute("insert into purchased values({} ,'{}')".format(bno ,__dt.date.today()))
__cur.execute("updatestock set qty_purchased = qty_purchased +1 where Book_No=
{}".format(bno))
__cur.execute("updatestock set Available_Stock = Available_Stock -1 whereBook_No
= {}".format(bno))
print("Bought Successfully")

18
q= '''Book Shop\nName: {}\nPhone No :{}\nBook Number :{}\nBook Name :{}\nCost :
{}\nDateOf Purchase: {}'''.format(cname ,phno ,bno ,bname,cost ,__dt.date.today())
filename= mktemp('.txt')
open(filename ,'w').write(q)
startfile(filename, 'print')
__cur.execute('selectBook_Name, Book_No,Authorfromstock where
Available_Stock = 0')
if __cur.rowcount ==1 :
print("STOCK OF ")
print("Book Name :" ,__cur.fetchall()[0][0])
print("Book Number : ",__cur.fetchall()[0][1])
print("Author: " ,__cur.fetchall()[0][2])
print("EXHAUSTED")
__cur.execute('delete from stock whereAvailable_Stock = 0')

def unique_book_no() :
__cur.execute("selectmax(Book_No) from stock")
data = __cur.fetchall()
if bool(data[0][0]) :
L1 = [xfor xin range((data[0][0] +1) ,(data[0][0] +10000))]
shuffle(L1)
returnL1.pop(0)
else :return False

def view_sales () :
print('Overall Sales ThisMonth')
__cur.execute("selectdistinct(s.Book_Name) ,s.qty_purchased from stock s ,
purchased p where s.Book_No =p.Book_Noand p.purchased_on between '{year}-{month}-
01' and '{year}-{month}-{date}'".format(year= __dt.date.today().year, month =
__dt.date.today().month ,date =last_month(__dt.date.today().month ,
__dt.date.today().year)))
data = __cur.fetchall()
L1 ,L2 = [] ,[]
forrow in data:
L1.append(row[0])
L2.append(row[1])
plt.bar(L1 ,L2)
plt.xlabel('Books')
plt.ylabel('Sales')
plt.title('Sales')

19
plt.show()

def login():
user = input("Enter the username :")
pwd =input("Enterthepassword :")
__cur.execute("Select* from users where(username= '{}' and password =
'{}')".format(user ,pwd))
if __cur.rowcount :return True

def update_stock() :
bno = int(input("Enter thebook number: "))
__cur.execute("selectBook_Name,Available_Stockfromstock whereBook_No=
{}".format(bno))
data = __cur.fetchall()
print("Book Name :" ,data[0][0])
print("AvailableStock :" ,data[0][1])
stock =int(input("Enter the new stock purchased :"))
__cur.execute("updatestock set Available_Stock = Available_Stock +
{}".format(stock))
print("Updated Successfully")

====================================================================

#PYTHONMODULE :Tables_in_mysql

import pymysql as cntr

db = cntr.connect(host= 'localhost' ,user= 'root' ,passwd ='manager')


db.autocommit(True)
cur = db.cursor()
cur.execute("createdatabase if notexists book_shop")
cur.execute("use book_shop")
cur.execute("createtablestock\
(Book_No bigint primary key,\
Book_Namevarchar(255),\
Author varchar(255),\
Publisher varchar(255),\
Cost_per_Book float,\
Available_Stock bigint,\
qty_purchased bigint,\

20
purchased_on date)")
cur.execute("createtableusers(usernamevarchar(255) ,password varchar(255) ,check
(username<> 'ADMIN'))")
cur.execute("createtablepurchased (Book_nobigint,purchased_on date,foreign
key(Book_no) references stock(Book_No))")
cur.execute("createuniqueindexBook_Indexon stock(Book_No)")
cur.execute("insert intousersvalues('admin' ,'admin@123')")
print("Databaseand Tables created successfully")
c = input("Press any key tocontinue---->")
cur.close()
db.close()

====================================================================

#PYTHONMODULE :main

import Book

c = 'y'
while c.lower() =='y' :
print("Book Shop Management".center(89 , '='))
print('1. Register')
print('2. Login')
print('3. Exit')
choice4 = int(input("Entertheserial number of yourchoice :"))
if choice4 == 1 :
Book.clrscreen()
Book.add_user()
elif choice4 == 2 :
Book.clrscreen()
if Book.login() :
Book.clrscreen
C= 'y'
while C.lower() =='y' :
Book.clrscreen()
print("Book Shop Management".center(89 ,'='))
print("1. Book Stock")
print("2. Book Selling")
print("3. Exit")
choice =int(input("Enter the serialnumberof your choice: "))
if choice== 1 :

21
Book.clrscreen()
print("Book Book".center(89 ,'='))
print("1. Add a newStock")
print("2. View allStock")
print("3. Updatean existing Stock")
print("4. Exit")
choice2 = int(input("Enterthechoice :"))
if choice2 == 1 :
Book.clrscreen()
Book.add_stock()
elif choice2 == 2 :
Book.clrscreen()
Book.view_stock()
elif choice2 == 3 :
Book.clrscreen()
Book.update_stock()
elif choice2 == 4 :
print("Good Bye")
break
else :print("INVALIDCHOICE")
elif choice ==2 :
Book.clrscreen()
print('Book Selling'.center(89 ,'='))
print('1. Sell a book')
print('2. View Sales this month')
print("3. Exit")
choice3 = int(input("Enteryourchoice :"))
if choice3 == 1 :
Book.clrscreen()
Book.sell_book()
elif choice3 == 2 :
Book.clrscreen()
Book.view_sales()
elif choice3 == 3 :
print("Good Bye")
break
else :print("INVALIDCHOICE")
elif choice ==3 :
print("Good Bye")
break
else :print("INVALIDCHOICE")
C= input("Do you wanttocontinue (y/[n]) : ")
else :print("Good Bye")

22
else :
print("Eitheryourusernameorpassword is incorrect")
elif choice4 == 3 :
print("Good Bye")
break
else :print("INVALIDCHOICE")
c = input("Do you wanttoreturntomain menu (y/[n]) :")
else :print("Good Bye")

====================================================================

OUTPUT

23
TESTING

Software Testing is an empirical investigation conducted to provide


stakeholders with information about the quality of the product or service under test[1] ,
with respect to the context in which it is intended to operate. Software Testing also
provides an objective, independent view of the software to allow the business to
appreciate and understand the risks at implementation of the software. Test
techniques include, but are not limited to, the process of executing a program or
application with the intent of finding software bugs.
It can also be stated as the process of validating and verifying that a software
program/application/product meets the business and technical requirements that
guided its design and development, so that it works as expected and can be
implemented with the same characteristics. Software Testing, depending on the
testing method employed, can be implemented at any time in the development
process, however the most test effort is employed after the requirements have been
defined and coding process has been completed.

TESTING METHODS

24
Software testing methods are traditionally divided into black box testing and
white box testing. These two approaches are used to describe the point of view that a
test engineer takes when designing test cases.

BLACK BOX TESTING


Black box testing treats the software as a "black box," without any knowledge
of internal implementation. Black box testing methods include: equivalence
partitioning, boundary value analysis, all-pairs testing, fuzz testing, model-based
testing, traceability matrix, exploratory testing and specification-based testing.

SPECIFICATION-BASED TESTING

Specification-based testing aims to test the functionality of software according


to the applicable requirements.[16] Thus, the tester inputs data into, and only sees the
output from, the test object. This level of testing usually requires thorough test cases
to be provided to the tester, who then can simply verify that for a given input, the
output value (or behaviour), either "is" or "is not" the same as the expected value
specified in the test case. Specification-based testing is necessary, but it is
insufficient to guard against certain risks

ADVANTAGES AND DISADVANTAGES

The black box tester has no "bonds" with the code, and a tester's perception is
very simple: a code must have bugs. Using the principle, "Ask and you shall receive,"
black box testers find bugs where programmers don't. But, on the other hand, black
box testing has been said to be "like a walk in a dark labyrinth without a flashlight,"
because the tester doesn't know how the software being tested was actually
constructed.
That's why there are situations when (1) a black box tester writes many test
cases to check something that can be tested by only one test case, and/or (2) some
parts of the back end are not tested at all. Therefore, black box testing has the
advantage of "an unaffiliated opinion," on the one hand, and the disadvantage of "blind
exploring," on the other.

25
WHITE BOX TESTING

White box testing, by contrast to black box testing, is when the tester has
access to the internal data structures and algorithms (and the code that implement
these)

The following types of white box testing exist:


api testing - Testing of the application using Public and Private APIs.
Code coverage - creating tests to satisfy some criteria of code coverage.
For example, the test designer can create tests to cause all statements in the
program to be executed at least once.
fault injection methods.
mutation testing methods.
static testing - White box testing includes all static testing.

CODE COMPLETENESS EVALUATION

White box testing methods can also be used to evaluate the completeness of a
test suite that was created with black box testing methods. This allows the software
team to examine parts of a system that are rarely tested and ensures that the most
important function points have been tested.

Function Coverage: Which reports on functions executed and


Statement Coverage: Which reports on the number of lines executed to
complete the test.

HARDWARE AND SOFTWARE REQUIREMENTS

26
I.OPERATING SYSTEM : WINDOWS 7 AND ABOVE

II. PROCESSOR : PENTIUM(ANY) OR AMD

ATHALON(3800+- 4200+ DUAL CORE)

III. MOTHERBOARD : 1.845 OR 915,995 FOR PENTIUM 0R MSI

K9MM-V VIA K8M800+8237R PLUS

CHIPSET FOR AMD ATHALON

IV. RAM : 512MB+

V. Hard disk : SATA 40 GB OR ABOVE

VI. CD/DVD r/w multi drive combo: (If back up required)

VII. FLOPPY DRIVE 1.44 MB : (If Backup required)

VIII. MONITOR 14.1 or 15 -17 inch

IX. Key board and mouse

X. Printer : required

SOFTWARE REQUIREMENTS:

I. Windows OS
II. Python

INSTALLATION PROCEDURE:

Book Stall Management :-


-------------------------------------

27
Pre-Requisites :-
------------------------

1. You have to have the following softwares for the successful running
of this software; which are

I) Python (Only for the First time), it is downloadable from


'www.python.org'.

II) MySQL (Only for the First time), it is downloadable from


'www.mysql.org'.

Installation :-
-------------------
1. There will be two folders namely 'Python Files' and 'EXE files'.

2. The folder 'Python Files' will contain the source code of the software
in python language. If you are running the software by the 3rd step
mentioned below you have to pre install the following modules :-

I) mysql.connector

II) matplotlib.

3. Open the files in any python editors and run it to start and work on the
software.

4. The folder 'EXE files' will contain two files namely 'main.exe' and
'Tables_in_mysql.exe'.

5. First run the 'Tables_in_mysql.exe' to create the tables in MySQL.

6. Then run the file 'main.exe' to start and work on the software.

28
CAUTION :-
=========

If you are running the software through running the python files or by
running the .exe files ; first run the file named 'Tables_in_mysql'.

The .exe file will take a lot of time; so be PATIENT.