Bill of Supply For Electricity: Area Details Connection Details Supply and Meter Details
Bill of Supply For Electricity: Area Details Connection Details Supply and Meter Details
Bill of Supply For Electricity: Area Details Connection Details Supply and Meter Details
Last Bill Payment Made Rebate Net Arrear in Current bill Adj/Inst Net Payable Amount
Amount Rs. amount
Before Rbt. Dt.(Rs.) After Rbt. Dt.(Rs.)
238.00 238.00 -0 0.00 690.24 -0.00
675.00 690.00
Current Bill Details
a. Energy Charges 606.00 1. Sundry Adjustment
Debit 0.00
Credit 0.00
2. Interest on SD(After TDS) 0.00
3. Miscellaneous Charge 0.00
b. Incentive on TOD 0.00 4. Total Current Bill(Aft Adj/Inst) 690.24
5. Rebate Allowable
c. Demand Charge / MMFC 60.00 Prompt Payment+Rural+Special -14.50
d. Overdrawal penalty 0.00000 6. Net Current payment after Rebate 675.00
e. Penalty for Fall in PF 0% 0.00 Digital Payment Rebate -19.54
f. Power Factor Incentive 0.00 7.Net Current payment after Digital 656.00
g. Colony KvaH charge 0.00 8. Cross Subsidy Charges 0.00
h.Load Factor Rebate/ Special Discount 0.00 / 0.00 9. Disputed Amount 0.00
i. Electricity Charge 666.00 10. Last Rebate Allowed 0
(a-b+c+d+e-f+g+h) 11. ASD Claimed 0.00
j. Electricity Duty (4%) 24.24 Message
1. The connection shall be liable for disconnection on non-payment of all dues(including arrears of previous bill(s) by due date, after notice as
k. Delayed Payment Surcharge 0.00 per Section 56(1) of the Electricity Act,2003. 2. Cheque/bank draft is to be issued in favour of TPWODL. 3. Disputed amount is to be finilised
on the outcome of the order of the respected court and the applicable. 4. ECS Opt-in. 5.Date wise last 5 payments detail with component wise
l. Meter Rent 0.00 adjustment are shown in annexure (second page). Payments has been clubbed in case of more than 5 payments from last billing cycle. 6.For
FY 2020-21, final TCS amount will be intimated after reconciliation. From FY 2021-22, TCS shall be levied based on collection.
m. Customer Service Charge 0.00
n. R.I. Surcharge 0.00
o. Tax Collection at Source 0.00
p. Current Total (i+j+k+l+m+n+o) 690.24
Division Office Connect at Connect us
EXECUTIVE ENGINEER (ELECT.), TPWODL, ROURKELA ELECTRICAL DIVISION,
ROURKELA, AT-UDIT NAGAR, ROURKELA, DIST-SUNDERGARH, PIN-769015 consumercare@tpwesternodisha.com 1912/ 1800 345 6798
Page: 1/2
For Detail log on to our website www.tpwesternodisha.com. Alternatively you can call at 1912 (24x7 Toll Free).
Head Office: TP WESTERN ODISHA DISTRIBUTION LTD
AT/PO-BURLA, SAMBALPUR, ODISHA- 768017
CIN- U40100OR2020SGC035320 PAN- AAICT3326R TAN- BBNT01931A
Tariff Structure (Charges applicable from 04.04.2021)
Energy Charge MMFC first kW or MMFC on Energy Demand Customer
Consumer Category Units per month part additional kW or Consumer Category Charge(kVAH) Charge (kVA) Service Charge
LT Category EHT Category
Kutir Jyoti 80 General Purpose
<=50 units 3.00 Large Industry
>50, <=200 4.80 Railway Traction As per Load Factor
Domestic Others 20 20
>200, <=400 5.80 Heavy Industry **
250 700
>400 units 6.20 Power Intensive Industry
<=100 units 5.90 Mini Steel Plant
General Purpose <110 kVA >100, <=300 7.00 30 30 Emergency Supply to CGP 7.70
>300 units 7.60 Colony consumption 4.85
Irrigation Pumping & Agri 1.50 20 10 Load Factor(%) * HT **EHT
Allied Agri Activity 1.60 20 10 =<60% 5.85 5.80
Allied Agro-Industrial Activity 4.70 80 50 >60% 4.75 4.70
Public Lighting 6.20 20 15 HT Category
LT Industrial (S) <22 kVA 6.20 80 35 Bulk Supply - Domestic 4.90 20
LT Industrial (M) >=22 KVA, <110 kVA 6.20 100 80 Irrigation Pumping & Agri 1.40 30
Specified Public Purpose 6.20 50 50 Allied Agri Activity 1.50 30 250
Public Water Works & Sewage Pumping <110 kVA 6.20 50 50 Allied Agro-Industrial Activity 4.60 50
Public Water Works & Sewage Pumping >=110 200 30 Emergency Supply to CGP 7.80
General Purpose >=100 kVA 6.20 (Demand (Customer Colony consumption 4.90
Large Industry Charges) Service Charges) HT Industrial (M) Supply 150 250
Customer Complaint Management General Purpose >70, <=110 kVA
The President,Grievance Redressal Forum,TPWODL, Qtr No.SD-6/2, Near NAC College, Burla, Sambalpur, Pin: 768017, Ph General Purpose >110 kVA
No.0663-2950601, E-mail: grf.burla@tpwesternodisha.com As per Load Factor
Public Water Works & Sewage
The President, Grievance Redressal Forum, TPWODL, * 250 250
Guest House. In front of Children’s Park, Bolangir, Ph.06652-235741, E-mail: grf.bolangir@tpwesternodisha.com Large Industry
Power Intensive Industry
The President, Grievance Redressal Forum, Mini Steel Plant Railway Traction
Plot No. UU/9, Civil Township, Rourkela-769004,
Ph.No.0661-2664241, E-mail: grf.rourkela@tpwesternodisha.com Give a missed call at 7411 77 9783 for availing New connection
services.
Energy Saving & Safety TIPS
Turn off all lights / appliances when not in use. Replace Incandescent Bulb by LED, and Energy Efficient Tube Light,
Electric Fan etc. Use energy efficient star rated appliances. Never touch electrical lines whether inside house or outside.
This is dangerous to your life. Never do construction work near or under electrical lines and Don't use electrical lines for
drying cloths.
Page: 2/2