ELECTRO-MECHANICAL
(SM-PVT) LTD. PAKISTAN
NTN: - 8920111-4
Doc No: TRA-001
Signature: Signature:
Task Risk Assessment for Electrical Cable Trays Installation and Electrical Cable Laying
Task / Activity
(0,1,2,3,4,5)
(0,1,2,3,4,5)
Residual Risk
Probability
Severity
Rating
S/No.
Risk
Task Steps Potential Hazards Effect Controls Measures Proposed Controls in Assessment
place)
Page 1 of 5
Task Risk Assessment for Electrical Cable Trays Installation and Electrical Cable Laying
Page 2 of 5
Task Risk Assessment for Electrical Cable Trays Installation and Electrical Cable Laying
4 Work at height Falling of personnel Personnel Tool Box talk /Task Briefing to be
and materials. Injury conducted before starting activity covering
Property the task and hazard prevention measures,
Damage in the language of the work force,
Acknowledged and Documented.
Workers to wear full body safety harnesses
and lifeline as required.
Ensure that Double lanyard safety harness
is being used, while working on or above
2m height.
Ensure lanyard is tied-off to rigid
5 5 H Low Acceptable
structure/support at all times.
Only deploy suitable and medically fit
personnel who have worked at heights
before.
Access and egress shall not be obstructed.
Safety wire sling must be provided around
working area / platform
Area to be cordon off below with
appropriate safety signs. 2
5 Lifting of work Crane with basket Personal injury Valid Third party certified (or be a
men at height overloading / Property supervised trainee)
by Boom uncontrolled loads damage check ground for stability
Lifter / Scissor
4 4 H Low Acceptable
Lifts.
Page 3 of 5
Task Risk Assessment for Electrical Cable Trays Installation and Electrical Cable Laying
Page 4 of 5
Task Risk Assessment for Electrical Cable Trays Installation and Electrical Cable Laying
Page 5 of 5
Task Risk Assessment for Electrical Cable Trays Installation and Electrical Cable Laying
Risk Matrix
Chart KEY
5 Almost Certain
1 Rare
0 1 2 3 4 5
Negligible Slight Moderate High Very High
SEVERITY