1.0 Introduction
This method statement covers all the procedures to be adopted for bituminous concrete consisting of
mixing materials, transportation, spreading and compacting on approved Sub base course. Work shall
consist of single layer of bituminous concrete on a previously laid DBM.
2.0 Abbreviation
CM – Construction Manager
SE - Site Engineer
SEO – Safety & Environmental Officer
ME – Material Engineer
PPE – Personal Protective Equipment
Man Power Equipment
CM Hot Mix Plant
SE Sensor Paver
ME Compactor / Roller (8 to 10 Ton)
pneumatic roller (12-15 tonne) or
vibratory roller
SEO Transport trucks
Lab Technicians & Helpers Level Instruments
Surveyor Safety Inventory
Survey Helpers Sufficient barricade tapes.
Supervisor/Foreman Traffic cones
Driver – Distributor
Driver - Dump Truck
Skilled & Unskilled laborers
3. Material:
Bitumen:
1. Bitumen shall be paving bitumen of penetration grade 60/70 as per IS 73.
Coarse Aggregate:
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
1. Coarse aggregate shall be crushed rock, crushed gravel or hard material retained on 2.36mm sieve.
it shall be clean, hard, durable, cubical shape and free from deleterious material.
2. Physical requirement of coarse aggregate is mentioned in table no 500-17 of MORTH
Specification.
Property Test specification
Cleanliness Grain size analysis Max 5% passing on 75micron sieve
Durability soundness
Sodium sulphate Max 12%
Max 18%
Magnesium sulphate
45 -
37.5 -
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
26.5 -
19 100
9.0
13.2 Minimum stability (KN at 60º C)79-100
9.5 70-88 2& 4
Minimum flow(mm) & Maximum flow
4.75mm 53-71
75 blows of each of the two faces of
2.36 Compaction level(number of blows)
42-58 specimen
1.18 34-48
3-6
Per cent air voids
0.6 26-38
AS PER TABLE 500-12
0.3 Percent voids in mineral aggregate(VMA)
18-28
loss of stability on immersion in water at
0.15 60º C
12-20
(ASTM D 1075) Minimum 75% retained strength
0.075 4-10
Binder Content, % by weight of total 5-7.0%
mixture
Bitumen grade 60/70
4. Mixture design: Apart from conformity with grading and quality requirements for individual
requirements, the mixture shall meet following requirement as per table 500-19 of MORTH
Specification.
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
5. Construction Process:
Preparation of base:
1. Surface on which the bituminous work is to be laid shall be cleaned of all loose and extraneous
matter by means of a mechanically or manually.
2. Filling of pot holes and patch repairs: each pot hole and patch repair area shall be inspected and all
loose material removed. Area shall be thoroughly cleaned with compressed air or any other
appropriate method.
3. Excavated patch shall be replaced using material equivalent to the original material.
Application of tack coat:
1. Binder used for tack coat shall be LOW VISOCCITY bitumen emulsion
complying of IS 8887.
2. Bituminous primer shall not apply to a wet surface or during a dust storm or in
foggy weather.
3. Surfaces which are to receive prime coat shall be free from stagnant water.
4. Primer distributor shall be self-propelled or towed pressure sprayer equipped for
spraying the material uniformly at specified rates and temperatures.
5. Rate of application of low viscosity tack coat shall be 0.25 to 0.3 kg/sqmt.
6. A tack surface shall not open to traffic other than that of necessary to lay next
course.
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
3. Difference between binder and aggregate should not exceed 14ºC at any time.
Transportation:
1. Bituminous material shall be supplied in clean vehicles.
2. Subject to approval of client, a thin coat of diesel or lubricant may be applied to interior surface of
the vehicle to facilitate smooth discharge.
Laying:
1. Laying shall be suspended while free standing water is present on surface, during rain, fog and
storm.
2. After rain, coated surface shall be blown of with pressure air jet to remove excess moisture, or
surface left to dry before laying bituminous course.
3. Surface on which bituminous concrete is to be laid shall be free from loose material by manually
or mechanical means.
4. As soon as possible, after arrival at site, it shall be continuously supplied to the paver and laid
without delay.
Spreading:
1. Travel rate of the paver, and its method of operations, shall be adjusted to ensure an even and
uniform flow of bituminous material across the screed, free from dragging, tearing and segregation
of material.
2. In areas with restricted space where a mechanical paver cannot be used, the material shall be
spread, raked and leveled with suitable hand tools by experienced staff.
3. Minimum thickness of material laid in one paver pass shall be above 25mm or such that so as to
after compaction it will get compacted 25 mm thickness.
Compaction:
1. Bituminous material shall be laid and compacted in such a manner that it will achieve desire
thickness, surface level, irregularity requirements and proper compaction.
2. Compaction of bituminous material shall start immediately after spreading operation completed.
3. Rolling of the longitudinal joints shall be done immediately behind the paving operation.
4. Roller shall first compact material adjacent to the joint.
5. Rolling shall commence at the edge and progress towards the center, overlapping on successive
passes by at least one third width of the rear roll.
6. Rolling shall continue until all roller marks removed from the surface.
7. All deficiencies in the surface after laying shall be made good by the attendants behind the paver,
before initial rolling is commence.
8. The intermediate rolling shall be done by 8-10 tones dead weight smooth-wheeled surface. The
intermediate rolling shall be done by 8-10 tonnes dad weight or vibratory roller or with a
pneumatic tyre roller of 12-15 tonne weight having nine wheels, with a tyre pressure of at least 5-6
kg/sqcm.
9. Roller move at a speed not more than 5 km/hour.
10. Wheels of rollers shall be kept moist with water, and the spray system provided with the machine
shall be in good working condition, to prevent mixture from adhering to the wheels.
11. Newly laid surface shall not be open to traffic for at least 24 hours after laying and completion of
compaction.
7. Surface Level:
Tolerance in surface level
Wearing course for flexible payment machine laid ±6 mm.
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
For checking the compliance with the above requirements for bituminous wearing course,
measurement of the surface level shall be taken on a grid of points spaced at 6.25 mtr along the
length and 0.5 mtr at the edge and center of the pavement.
8. Surface regularity of pavement course:
Maximum allowable difference between the road surface and underside of a 3 meter straight-edge
when placed parallel with or at right angles to the center line of the road at points for bituminous
course shall be 3 mm.
9. Quality Control test during construction:
Control test and their minimum frequency for bituminous works
Sr. Type of Test frequency
no layer
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
mixed material
(xi) regular control and through checks on the
(xii) Density of weight of mixed material and layer thickness
compacted layer (xii) One test per 250 sqmt area.
During the whole process of work the following risks are foreseen:
SPCL shall comply with all the necessary mitigation measure as stated in Job safety
analysis. The risk management can be separated into general safety consideration and
those that are particularly applicable to the actual work at site.
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati
SHAPOORJI PALLONJI & CO. LTD. SPCL
FIPL2-1-SPC-QM-CVL-P00-PNT-299012
QUALITY MANAGEMENT
REVISION NO. 1B
DATE 12-04-2013
PREPARED BY Vivek Contractor
(SPCL)
APPROVED BY Mr. B.C Gangavati