BARRA STORE India
BARRA STORE India
BARRA STORE India
Meter Last Current Multiplying Consumed Solar Power Actual Status Bill Date PayableDate(Due
No. Reading(KWH/KVAH) Reading(KWH/KVAH) Factor Units(KWH/KVAH) Units(KWH/KVAH) Factor Demand Date)
3101751 34589 / 37981 36248 / 39716 1.00 1659 / 1735 0 / 0 0.90 7.70 Normal 16/08/2022 23/08/2022
Bill Base Alloted Units Adjustment Units Total Total Demand Excess Solar Units Inoperative Security Extra Disconnection
Units Amount Amount Amount Date
3. Rebate upto Payable Date (-) 173.61 i) Previous Arrears / Arrear Count 0.07 + 0.00 / 2
A) Assesment (+) 0.00 16. Total Payable Amount Before Due Date 19764.00
11. Credit 18. Total Payable Amt. After Due Dt. 19938.00
B) Temporary (-) (ISD Interest ) of (-) 255.00 20. Bill Date 16/08/2022
Assistant Engineer
WARNING PLEASE NOTE THAT EVERY BILL MUST BE PAID ON DUE DATE OR BEFORE DUE DATE OTHERWISE YOUR ELECTRICITY SUPPLY WILL BE DISCONNECTED WITHOUT ANY
INFORMATION UNDER THE 24(1) ACT OF INDIAN ELECTRICITY RULE 1910.
Receipt No : 3303218072271710159 Collection Date : 18/07/2022 Amount in Rs : 20406.00
Book No. Sc No. Account No. Meter No. Meter Reading Date
Consumer Signature
1. Please mention connection no., book no., account no, name and address on the back of cheque/draft.
2. Mention "crossed" and "account payee" on the cheque/draft.
In case the present meter reading on verification found to be wrong/tampered. In such case consumer shall be penalised as per the revenue assesment.
Back
Print this Online Bill
Privacy Policy | Terms and Conditions| Refund Policy | Feedback | Admin
© Kanpur Electricity Supply Company Limited., All Rights Reserved