Residence Progress Tracker - Detection Status
Residence Progress Tracker - Detection Status
Residence Progress Tracker - Detection Status
Concealed Detector
Inspection
Inspection
Installation
Installation
Pending
Fixing
Level Contractor Room Type
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L 18 Direct Team
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A Continuity to be recheck
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L 19 Chamikara
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A MCP & Sounder re position
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L 20 Chamikara
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L 21 Chamikara
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
Weerakoon / E N/A N/A
L 22
Nishantha B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
Weerakoon / E N/A N/A
L23
Nishantha B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L24 Chamikara E N/A N/A
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L25 Chamikara
Concealed Detector
Concealed Detector
Inspection
Inspection
Installation
Installation
Pending
Fixing
Level Contractor Room Type
A N/A N/A
B N/A N/A
D N/A N/A
L26 Nishantha E N/A N/A
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L27 Chamikara E N/A N/A
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L28 Chamikara E N/A N/A
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L29 Chamikara E N/A N/A
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
Weerakoon / E N/A N/A
L 30
Nishantha B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
Weerakoon / E N/A N/A
L 31
Nishantha B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L 32 Lakmal E N/A N/A
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
L33 Lakmal E N/A N/A
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
Concealed Detector
Concealed Detector
Inspection
Inspection
Installation
Installation
Pending
Fixing
Level Contractor Room Type
A N/A N/A
B N/A N/A
D N/A N/A
L34 Lakmal E N/A N/A
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L35 Shantha B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L36 Shantha
B.2 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L37 Shantha
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L38 Sampath
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L 39 Sampath
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
D N/A N/A
E N/A N/A
L 40 Sampath
B.1 N/A N/A
F N/A N/A
C N/A N/A
Corridor N/A
A N/A N/A
B N/A N/A
L 41 Sampath
L 42
L 41
Level
Sampath
Sampath
Contractor
F
F
C
B
C
E
E
D
A
D
B.1
B.1
Corridor
Corridor
Room Type
Installation
Completion
Dimenssion
N/A
N/A
Inspection
Cable Testing
Concealed Detector
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Fixing
Concealed Detector
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Installation
Inspection