AVR-I-102.4A-FF-R.C.P Level Plan-10.03.2022
AVR-I-102.4A-FF-R.C.P Level Plan-10.03.2022
AVR-I-102.4A-FF-R.C.P Level Plan-10.03.2022
E1
BOS +2775
BOS +2775 BOS +2775 BOFS +2675 BOFC
BOFC BOFC +2400 MM BOFC
L3 L3 +2425 MM
+2500 MM +2775 MM
L1 L1 L1 L1 L1
BOB +2550
L3 BOFC
+2450 MM
SHOWER AREA
1680x1020
L1 L1 L1 L1 L2 L2 L2
ALUMINIUM FRAMEWORK
L1 L1
FOR WPC CEILING
L3 200 MM WIDE CURTAIN COVE E2
F1 F1
BOFC
+2400 MM L1 L1 L1 L1 L1
BOS +2775
BOFC +5400 MM
F2 BOFC L1 L1
+2675 MM
F3 E1 E1 L1 L1 L1 L1 L1 L3
L1 BOS +2775 BOS +2550 L7 L7
L7 L7 L7 L7 L7 BOFC BOFC EX
L1
RAGHAV'S BEDROOM
5485x4430
+2400
+2400 MM +2400 MM
BOFC
E1 L1 E1
L7 L1 L1 +2675 MM L1
L1 L1 WC
F2
1615x1200
E1
+2515
F3 L1 L3
ALUMINIUM FRAMEWORK L7 L3 L3 BOB +2550
E1 L3 L3
FOR WPC CEILING 200 MM WIDE CURTAIN COVE L3 L3 BOFC +2450
F1
L3
L1 F1 L1 L1 +2775
SERVICE BALCONY
BALCONY BOFC BOFC
BOFC 7090 X 1975 L2 L2 L2 L2
1500x4685 +2450 MM +2200 MM
+2400 MM
L3 F2 L3
BOFC BOFC
L3 L1 L1 L1 L1 L1 L3 L3 +2775 MM +2775 MM
Consultants:
BOFC BAR
+2400 MM E1 1445x2460 B Structural Consultants
Services Consultants
ALUMINIUM FRAMEWORK
FOR WPC CEILING
POINT E1 - Motorized curtain point within
TANDEM PROJECT,
PLOT NO.60 curtain cove to be left as hardwire point
ASHOK VIHAR