GEOMETRIC DATA
16 Width of Slab/Beam (b) mm 8700 5500
17 Total depth of Slab/Beam (D) mm 1800 1800
18 Cover to Reinforcement (c) mm 75 75
19 Dia of Reinfrocement (φ) mm 20 + 0 25 + 0
20 Spacing of Reinforcement (s) mm 90 90
21 Number of Bar (n) Nos 97 61
22 Area of Reinforcement (At) mm² 30368.73 29997.85
23 Reinforcement (%) 0.194 0.303
24 Dia of Shear reinforcement mm 8 8
25 Spacing of Reinforcement (s) or mm 180 180
26 Number of Legs Nos 48.00 30.00
27 Reinforcement (%)
* Shear Resistance
47 Max Shear capacity of section 0.5·bw·d·v·fcd ton 5392.31 3364.00
Eq 10.5, IRC 112
48 Status VED < 0.5·bw·d·v·fcd OK OK
49 Concrete Shear capacity, Cl 10.3.2, IRC 112 ton 404.36 294.07
VRd.c = [0.12·K·(80·r1·fck)0.33+0.15·scp]·b·d
50 Min Concete Shear capacity, Cl 10.3.2, IRC 112 ton 392.14 245.26
VRd.c min = (Vmin+0.15·scp)·bw·d
62 V1 0.54 0.541935483871
63 acw 1 1
64 status OK OK
65 Min Shear Reinf. Ratio for Beam 0.00079 0.00079
(0.072sqrt(fck)/fyk)
= ≥
Φ eq = n1Φ12 + n2Φ22 = 20 mm
n1Φ1 + n2Φ2
= ≥
Φ eq = n1Φ12 + n2Φ22 = 25 mm
n1Φ1 + n2Φ2