MCC #1 Elevation: District of Sicamous Mara Lake WTP Upgrade
MCC #1 Elevation: District of Sicamous Mara Lake WTP Upgrade
MCC #1 Elevation: District of Sicamous Mara Lake WTP Upgrade
BC HYDRO
PADMOUNT
MCC #1 TRANSFORMER
3P, 1000A
LSIG BREAKER,
100% RATED
UTILITY
METERING
300 mm
OUTDOOR ENCLOSURE
STANDBY GENSET
3P, 600A CB
3P, 1000A
ATS 600V
PQM
7070
635 1120 510 1120 510 635 635 635 635 635
1200A CU BUS
CIP TANK
IMMERSION
200
SPD HEATER
FEEDER
3P, 3P, 70A CB SERVICE FEEDER TO
3P, 70A MCP 3P, 70A MCP 3P, 70A MCP 3P, 70A MCP 3P, 200A CB 3P, 300A CB 3P, 200A CB
30A ENTRANCE EXISTING
CB PUMP
PQM
STATION
MCC #1 ELEVATION
1:20
3P, 100A DS 3P, 100A DS 3P, 100A DS 3P, 100A DS
50kW
40 40 40 40
50
hp hp hp hp
UF FEED UF FEED UF FEED UF FEED CIP TANK EXISTING (TO MCC #2) (TO MCC #3)
PUMP #1 PUMP #2 PUMP #3 PUMP #4 IMMERSION PUMP
HEATER STATION
SINGLE-LINE DIAGRAM
10 mm
(SHEET 1/4)
0
PRELIMINARY
Revision Amendment Approved Revision Date Project