Task
Demolition Hammer – concrete breaker
Job Hazard Analysis Form Completed by

Required PPE
Anti-vibration gloves, safety glasses/goggles, dust mask,
hearing protection, steel-toed footwear
Date Notes

Step Picture Step Description Hazards Controls


• Be sure that hammer is unplugged and
Perform pre-use inspection and
1 • Bodily Injury perform pre-use inspection according to
check
the manual

• Evaluate materials to be worked on prior


to cutting work. Some dust created by
2 Preform hazard assessment of breaking concrete can pose health
• Hazardous dust
work area hazards
• Insure the work area is free of clutter,
and is will lit

• A caution area: delineators with caution


• Injuries to user, co-workers, or
3 Prepare work area tape
bystanders
• Keep the work area as small as possible

Page 1 of 2
Step Picture Step Description Hazards Controls

• Alternate workers throughout the day if


working with tool for 8 hours
• Administrative control – switch every 15
to 20 minutes
• Debris/sparks
• Anti-vibration gloves, safety
• Heavy vibrations
glasses/goggles, dust mask, and
• Ergonomics/Awkward postures
hearing protection
4 Performing concrete breaking • Inhalation of Dust/Harmful
• Water to keep dust down/comply with
Chemicals
Table 1
• Eye Injury
• Keep proper footing and balance all
• Noise hazards times
• Work in a well-ventilated area
• Hold the hammer by insulated gripping
surfaces when performing an operation

Page 2 of 2