Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
180 views

Software Engineering Techmax - Compressed 1 1

Uploaded by

Chirag Pramod
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
180 views

Software Engineering Techmax - Compressed 1 1

Uploaded by

Chirag Pramod
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

wa pete ——

MU + Sem. 6 - Comp Tabla of Contents

Module 1

Introduction to Software Enea and Proceas Madoln 1-1 to 1-46


Chapter 1:
en

ee EO ee or La eA
Syllabua: Nature ‘ol Sottware, § sonhware “Engineering, Soltwaro Procoss, Capability Maturity Model (CHM). Genoric Process Model,
\\ Prescriptive Process Models : Tho Waterfall Model, Vemodol, Incremental Procoss Models, Evolutionary Process Models, Concurrent
| Models, Agito process, Agility Principles, Extremo Programming (XP),Scrum, Kanban modol.
{ 1 Sottwaro... Hs
v Syllabus Tople: Nature of Software.
‘ .2 Nature of Software.
1.24 Defining Software...
.2.1(A) Characteristics of Software...
1.2.2 Software Application Doman ...ssscsssesessnsescessssenen’ Ssscaciiaateacatscvesciataetarsnsenenn
nsusseasradsasseatsateasenocsoresseate 1-7
¥ Syllabus Tople : Software Enghnocring «sess nvbavas@eesansaseonanvnyensveapscossbsasssnpvensonssereberaveasstssoaeersas
AT
13 Softwaro Engineering (Dec. 15).
N\ 1.3.1 Layered Approach........
\ 1.3.2 _Activitios of Softwaro Enginooring...cssssscsssseesssen
1.3.3 Noed of Software Engineering ........sssssssss
v Syllabus Tople : Softwaro Process...
14 Software Process (Dec, 15).
1.44 Comparison with Conventional Engineering Process
v Syllabus Tople : Capability Maturity Model
15 Capability Maturity Model
N 1.5.1 Capability Maturity Model Integration
ho ov Syllabus Toplc : Generic Process Model
1.6 Generic Process Model i
¥ Syllabus Tople : Prescriptive Process MOdels . s cs s s srnerseseseansoes

17 Prescriptive Process Models .


v Syllabus Topic : Waterfall Model
17.1 Waterfall MOdeI.....ccscssssveersssssesessssrenseneentsnesnsnsnssvssvees
v Syllabus Topic : V-Model.....
— 1.7.2 VeModel ....sssessenees
Ite 1.7.2(A) Verification Phases
1.7.2(B) Validation Phases...
¥ Syllabus Tople : Incremental Process Models
1.8 Incremental Process Models (Dec. 16)
1.8.1 Difference between Waterfall Model and Incremental Model...ussnssemnnesennnnnrnnnnee
sssssunnnscsesssanssssscussosssscannnannsseqonenssses
oa Syllabus Tople : Evolutionary Process Models osaacssssssssesssssssssssscsssnsssssssscsssnssss
sscouveseauveeeReraiis
19 Evolutionary Process Models ........s.-++s+
1.9.1 Spiral Model (Dec. 17)...
1.9.2 Prototyping Model (Dec. 16)
aes Syllabus Tople : Concurrent Models
“4.40 Concurrent Models .n.annssnne
3 a Syllabus Tople: Agile Process seeceutssanennansancsuneste
18).........
0 1.41 Agile Process (May 15, Dec. 15, mane Dec. 16, May 17, May
} deve Syllabus Topic: Agility Principles
1.11.1 Agility Principles (May 15, Dec. 17)
1.11.2 Advantages ot Agile Process (May 16)
Agile Process Model...
1 Difference between Prescriptive Process Model and

Scanned by CamScanner
142

, 12, XP Values.
Syllabus Top
le; SOM
113 Scrum (Dec, vrs,
v 17)
Syllabus Top
le : Kanban Mo
1.14 del
Kanban Mode
!
1144
Lido
1.14.3
1.14.4
1.14.5
* Chapter Ends

Module 2
Chapter 2: Requirements
Analysis and Modelling
| : Use Cases (UML)
Syllabus : Requirement Elicitation, Software requirement specification (SRS), Developing ML).
Requirement Model : Scenario-based model, Class-based model, Behavioural model.
at Requirement Engineering (Dec. 16) ssssssssssssss
nscccecccsseessnsnesnesnesesteeee
2.1.1 Activities Involved in Requirements
Engineering
v Syllabus Topic : Requirement EVIcitAtiON.......ssssssevssssscssessovsss
ssoseccesscosseesescossssecc ennnsnnntsuseceausocsnsacganessessneeseeeseeess
2.2 Requirement Elicitation (Dec. 17) arerocsnasanerreee nee
e
oneeens oa tebesocaranssenstorse eceeereeese: seseseasersecavsecennaccosscoansconssnasap
23 Requirement Analysis sees avavenveenracssnoesens saeseenanees
tt em neta ete tee ese eeenounenaaenenastaeateneeseneotarsneusenerecnnecas besssenasie
2.4 Types of Requirements
2.4.1 Functional Requirements (Dec. 16)...
.
2.4.2 Non Functional Requirements (NFR) (DOC. 16) .....cssssesssssesssssssssnncsssesesnecsssecsnec
snensessnsnssansen ecsnesveeseascenenasanervseasancenseans -
2.4.2(A) Types of Non-Functional Requirements peneeensreas teen eeessnee tease nesenesssunnaeseerbesesenspessones
Se eewecercoececonseseneaseuosseenecsvacsuepeatersarenersey:

2.4.3 Domain Requirements...SO...


Pema n ere e Lt easnenasecesasenmeneeenensereeerenansestensseoagn sansa seness: Raeseeae scorer enevear enous eecenersnesseeremee ness Pay seen sanseenenes

Syllabus Topic : Software Requirement Specification (SRS)


25 Software Requirement Specification (SRS) (May 15)
2.5.1 Advantages of SRS SASS orev en naeeeeneneumeeneaaneneEsSLO DEL EEG OLIGDaaesaede reese eRe EEN DEAS EEDMLSSORH OD OESOOGEDDORSEMELDISUSSOESIOL
DEOL SEREDDREED SS SRESb EAS DO NEES
2.5.2
2.5.3
2.5.4
2.5.5 SRS for Hospital Management System (May 17, May 18)
v Syllabus Toptc : Developing Use Cases (UML)
2.6 Developing Use Cases (UML)

27
28

Scanned by CamScanner
[EP software Engineering (MU - Sem, 6 - Comp) 3
2.9.3 Swimiane Diagrams......
iv Syllabus Topic: Class-based Model..
/ 2.10 Class-based Model... -
‘ 2.10.1 identitying Analysis Classes
C ‘
2.10.2 Specifying Attributes
2.10.3 Defining Operations.......
v Syllabus Toplc : Behavioural Model...
2.11 Behavioural Model..............0000

Chapter 3: Project Scheduling and Tracking 3-1 to 3-27


Syllabus : Management Spectrum, 3Ps (people, product and Process), Process and Project metrics.
Software Project Estimation : LOC, FP, Empirical Estimation Models : COCOMO II Model, Specialized Estimation Techniques.
Project scheduling : Defining a Task Set for the Software Project, Timeline charts, Tracking the Schedule, Eamed Vaiue Analysis.
34 Management Spectrum, 3Ps (People, Product and Process) 7 . soeesaessacenateraecenceseseetsonssenensen 3-1
v Syllabus Topic : Process and Project Metrics saseness 20-2
3.2 Process and Project Metrics.... “ a . oe oe FQ
3.2.1 Metrics in the Process and Project Domain ......sesssssssssseressenssessensancneseenrensensneerenerets in 3-2
3.2.1(A) Process Metrics and Software Process Improvemert....... a 3-3

3.2.1(B) Project Metrics........


Syllabus Topic : Software Project Estimation

Software Project Estimation ......-sssesescecssrsesesesnessersesarsersneseenenseasseneesneneennns


3.3.1 Metrics for Size Estimation (May 15, Dec. 16, May 17) :

Syllabus Topic : Line of Code (LOC).


3.3.2 Line of Code (LOC)
Syllabus Topic : Function Points (FP)
3.3.3 Function Points (FP) (May 17)
Syllabus Topic ; Empirical Estimation Models ...
Empirical Estimation Models ..,...vsssssssssssssnsessssrssseecesnsnssssnesssesssntennnannnnnnnrestnasnnensanenorgetasneneaanins
Syllabus Topic : COCOMO II Model ........-.s.s0
3.4.1 COCOMO II Model (May 15, Dec.16)
Syllabus Tople : Specialized Estimation Techniques
Specialized Estimation Techniques
3.5.1 Estimation for Agile Development...
3.5.2 Estimation for WebApp Projects ........
eee nnnnnns
sere eeetnnnnnna
......sseceeessessnsesseesttmmnnnrsensnenn
Syllabus Topic : Project SChEGUlNG

Project SCHECUIING ......ss.ssssesesssseeseceserenesennennnncnrers


ensesnerrrr
Syllabus Topic: Defining A Task Set for Software Project....---neeessenereeeseern
eecaesauseacsseceaveccessseseacceenvangnenneceneentegs
3.6.1 Defining A Task Set for Software Project
A Project
3.6.2 Reasons for creating a WBS in
ee anstanme ES nmn
ensestnm
Scheduling Techmique ..-sctucsses
3.7.1 Critical Path Method ...
» PERN sanasssavsevenssenveseensonmnesa
37.2 Program Evaluation and Reviewtla
SCHODUIC......s-sseeceeneescnsneneranneennennsnsnnensnnten!
Syllabus Topic : Tracking the

Scanned by CamScanner
Soe ry IMU = SO6M
= Com sa Lk ounwaro Engineering
.p) ‘
ra 4.10.2(B) Applicat
Syllabus Topic ; TimeLino Charts... 4A0.2(C) User tr
3.8.1 TimeLine Charts occ 4.10.2(0) GUI Im
Syllabus Topic : Eamod Value Analysis 4.10.2(E) User tr
3.8.2 Enmod Valuo Anatysis © Chapter Ends ........
3.8.2(A) — Featuros of EVA cece
3.B.2(B) Noed for EVA... ceceeene —_
ChapterS: Softwar
a |

Ay, ||_ Slabus : Risk Ident


A-1 to ——s process, Software Quali
Chapter 4: Software Design
—— 6 Coupling. A rchitectural Design 5A Risk Manager
fo : Design Principles, Design Concepts, Effective Modular Design - Cohesion an ~ ‘, saan :
Componentevel design, User Interface Design. Cy siebecy

v Syllabus Topic: Design Principles... ie5


4.2
v Rick Cont

43 Syllabus

Risk Pre
°
44 Effective Modular Design. Syliabu
wun
4.4.1 Advantages of Modularization _
4.4.2 Functional independence

45 Cohesion (May 15, May 16, Dec. 16, May 17, Dec. 17, nee 18)... es
ee, 4 5a Syilal
ade

45.1 Different Types of Cohesion (Dec. 15) aa


45.2 Advantages of Cohesion -

4.5.3 Disadvantages of Cohesion.. Ae sy


v ee — A 5.
46 Coupling (May 15, May 16, Dec. 16, May 17, Dec. 17, May 18)............. Apedefousyussacenansssstbussscogssseers ; : ty :
46.1 Types of Coupling (Dec. 15) ..........cssersesesscsnssnsssnenensensnsseenens dinnesnecesvonaentan togeusnessncordnsonssuserennsassssbenieen dpseiacessnsoniee eeeid |
4.6.2 Advantages Of Coupling.........cccsesessenssesssssessesssesssceessersesensenenes ssaeuvoaesansi savennne engactaveorss Outs se suusnrenensssaevaneresteanersonsers
4.6.3 Disadvantages of Coupling............ saendvzqusr Stnssednesthrovtssesessfesssrobensechavstecetsiatutyeevesnenseszes}uee4s ssinnguegnensenosgnennece 4A
4.6.4 Advantages of High Cohesion and Low Coupling (Dec. 17)... nati sheneantéccincsiensee savaneateesasesonsvssipersnisssssnie 4A
47 Differences between Coupling and Cohesion ........cssssscsssesseesesseesee otsiscanndicnsesan er eSenovesant sooysons ise eonbeesbe
was Tenspevivtessoniee 4g
¥ Syllabus Topic : Architectural Design........
4.8 Architectural Design .......c.sscssssssecssecssessese
4.8.1 Functions of Architectural Design
4.8.2 Architectural Design Document.
4.8.3 Architectural Style (DOC. 15) ....acscssossunseusesssesesserecsossccs
v Syllabus Topic : Component - Level Design
49 Component - Level Design .......ccsssssesssee <i
v Syllabus Tople: User Interface DeSigh .scussunnemneteneneoec..
4.10 User Interface Design (Dec. 16, May 18) ...
4.10.1 Command Line intertace (CLI)
4.10.2 GrapUser
hiInter
caface
l (GUI)
4.10.21A) GUI Flamante

Scanned by CamScanner
Chapter5: Software Risk, Configuration Management & Quality Assurance 5-1 to 5-46

Syllabus : Risk Identification, Risk Assessment, Risk Projection, RMMM, Software Configuration management, SCM repositories, SCM
process, Software Quality Assurance Task and Plan, Metrics, Software Reliability, Formal Technical Review (FTA), Walkthrough.

5.1 Risk Management (May 15, Dec, 15, Dec. 16, May 18)....ecsssssccsessscsccsssssssessessesssssssenmisnsevesssasssssnssesssesseeseesesransessnunrannnsneatseneti 5-1
v Syllabus Toplc : Risk ASSCSSMEN...........ecssssssecssssecssescsscsssessesnssasesssnssesaveneonssnssessessnencaneetearenseacensensenscnessarcansacescaesesenseerensaraetsess 5-4
§.2 Risk Assessment... - ies seevnsseeeorer onlineegneqre signs ceva ssncnrq mona erecelOESnn 5-4
v Syllabus Tople : Risk Identification ......ssssssessesseresssssessesersecsssnessascasensnsaressassonscerenstennessetserssnessenees esseseninenereeceessnnentsnnenencnereceen 5-5
§.2.1 Risk Identification ..........cccsccsscsescssssssscscsssssnsssesssersssecssccssscssesssssseorsasceduensassesenarecsesesessnensnencnesssnsenenersseanesnsasseneneaneasenes 5-5

5.2.2 Risk Analysis .....sssessssssssssesseccsscesssscsssssvessssesssnssssnsesssscessrseensesersssensscrsacersuecesusessansconssssnsesonscseavecsacsanenancanscanecoanesenasseats 546


5.3 Risk Containment........... sesusavesveussuenvcsossusnvevssusavsavanveasenccsssusssenscsscsecascuesussnssosensoneasenvenscssonsavensaneueguesssenannanenscassnesssescessesnacecensensecs 5-7
Syllabus Tople : Risk Projection .........sssssssssesssosssesssssnerssenserecssnsosesasenscennessersecsseenecensssnenersnssassecansenuesansansarensansanenaseaterserensensstnass 5-7
5-7
5.4 Risk Projection .......sssssssssssssssssserssnssessesnesnssnscnssseassarsssenseneesstessocsasansnesenes agrosesesecssccansecscessssuvcssessoesesuecansessesnequecnoranceneenseenscansetaat
5-9
Syllabus Topic : RMMM........ssssssssssssssssssssessssssesssscesssseensonsesensnvenssssnossssnsunensnsssenssssscenunecsensessoasesisnnssascavecnnnsssiagegniecresssensnssenssectt
5.5, RMMM (May 15)......ccsssecsssessssrerssssssecsseneesscansaneesensnenes 7 ssseseavessaneossnsauceseesecsensenencaucatacssonensacsensacsananaenensaneseanes 5-9

5.5.1 The RMMM Plan........csccccccsssscsseccsscssossessesscsnesenssecssssccssssnsseseceasescaesansesanasnassnscsssenseusensnausaneuancusssaassassnsnssasasenensasesease 5-10


5-11
Syllabus Topic : Software Configuration Management.........sssssssssessssssssssssssesssesesscennnansesesesssesnannnesecacccsessenscenassecconaanaasansanentys
seanecnanconesens5-11
Software Configuration Management.......... : seceecsavccscssucusssensssusesevseacenecesceaescsacstssscseceecasscusesansansnstauseusespecsuaeseenauneeseens
5.6.1 Benefits of Software Configuration Management .........scssssssssssesssssnsersnecseensneaneessnssansaesnsensssanencnnataenaseasensessnennsasneses 5-11
5.6.2 SCM DISCIPINeS........sersesersesecsensereneevssnnvenentessenes aseusseavagensdesursdtecvescesniaenossecisbinsteoveelss sansebenssnnsnnsens B sasctssavesonserees
unsses
Syllabus Topic : SCM Repositories..........ssssssssscsssvsssssssesnnsessecssnnvssesssnnsnssesscenssssssnassneasernsnnansesenasavessescansengnasssen
5.6.3 SCM Repositories..........csessssssssesssessnsecssesssessnsengeeonnssssssanessnesenussavensuennesenvenannsaneseusasnensavsnnssensanssecenesenes

5.6.4 SOM PrOoCeSS...ccccscssessssvssecssessesscansssscsscsecsssassecssnseneacsassesecnensessensseessnsensanenuarssesesanenseesee


5.6.4(A) Configuration Identification .........sssssessscsesecnenereessnesnenrsesseaneanensensnesnereesessensnsonssreess
5.6.4(B) Change Control (Configuration Control) (Dec. 15, May 17, May 18)
5.6.4(C) Version Control (Dec. 15, May 17, May 18) sie ssassorosssousesenrsvocceenosesosescesscacorensssesensneasoasnaese5-21
5-21
5.6.4(D) Configuration AUdit .........sssssssssssernesssessssernesanessnsessessnescasansnesenersassnsecsnsenseenncavacsnssnessnsscanscguannenasscnsaqunczanasesesesse4ssses
5.6.4(E) Status Reporting................+- sesussassceseuseacegesessecvecceseaseseccesenescsossessecsesscssensessnssencassacsscuseenanenesesses 5-22
ened ot i eee st . sssitlcdenencaeliSnaibuchina dee
deottsiss OOS

Scanned by CamScanner
a
a ~—vnvspgens =
ine
Hee
es —sasnn stT cae
RES
Softwaro Quality ASBUTRMOD occurrent
5.8
eesni
nrrenet
mmtaatt
rnsrttten n vssveseshovessssectsseesysnnasaesonssennent®5-27
5.81 Comrypenmnernts of SCA SYSor asseresre see nnnrsenemr 828
ually ASSUTEIIOD. ces veeseereereeerserenerees
5.82 Pre-project Software Q
ss
en eme se
rnn ne
mer er
see eeen we 529)
s.....nss.
¥ Sytlnbus Tople : Metric os
rsernessnne
5.8.3 NMieotrins (May TB) ccc sscscsssenssesnssnse a
eneernee
5.8.4 in-process Quality MEtMIOS .svvcecerece 531
5.8.8 Defect Density During Machine Testing «..- nieaeescatetnsenetareTucereentnn
t
eunveuseciaetnet 32
snrnseunenesevesectneenstenusens
5.86 Defect Arrival Pattem During Testi saessnvssess eacgs eecan esstn ansan sanen cste
ssarecersensseenenevensnenssnessestancas 5-42
Phase-Based Defect Removal Patten sesscssessnoreesssncesnsnorcecccensonrearesea
$.87
ore dihin taHidlo tr msiatedsiviitad 5-32
ereenureerenreree seneasanresesssesenedenees iptavusttterctesteweitert erik cd
5.8.8 Maintonance Quality Metrics........ssess 5-33
r
t [GOK saressssenssessonersesnarsssscnsneneesstee
5.8.9 Fix Backlog and Backlog Managemen
BBO Fix QUOT . enes
cr rereeeee

5.8.14 Defective Fix..

5.9 SQA ProcOSSeS wvesesserreeee


sasonucnnnennnrents
acsnnsn rse -
ce eee
5.10 Baonefits Of SQA. sserssesscssessuesssterssssnrcesseetsnecen tee A gnen
teste ett
senn seennnen
Task and PLAID. dossssssssssesseesnnesss
v Syllabus Topic : Software Quality Assurance
rnnannrnr
ee EEEsen
SEE snee
rerSES
tumnmensnnnntnmens
5.11 Sotware Quality Assurance Task and Plam.cesssss
5.11.1. Test Management Reviews and AUIt secesesseseeeees
5.11.2 Implementation of the Quality Assurance......
5.11.3 Review the Process... ‘
ee nsanen sssesanennsnnnannnnncnee
eee ssnena
nsannersessseesenreeressee
5.12 Quality Evaluation Standards .......ssscsssssessssssa
ne sietnsprsaenne
sereenssss
annnnsnansserssensrnn
5.12.1 Quality Evaluation Stamdards.......--sssessessseescesssssnnss
eee ee
eee snnee
enaneeennsnne naneee esnneS nnenen
5.13 Six SIGMA esecseneecessenssseenssennensnesnne
scanensereceanies
5.13.1 Characteristics of Six Signa ......-ss-sccscssssrsssssessenseensanenseensennnnanecn
erssnnennnansereccenesstin
5.13.2 Key Concepts of Six Sigal ......--sssssrssssssessessesnnnnanen
arers
5.13.3 Benefits of Six Sigrma.........ssscsscssssessenesssnrsssenenssessansaeno
5.13.4 —_ Elements of Six Sigma.........sssessssseeseesersess
5.13.5 Responsibilities/roles in a Six Sigma ,
ecessasecesnececeuacsenucsuavecssnecansecanenssunasnen egessanecaneeanconseensuanegeasgesseeeee
v Syllabus Topic : Software Reliability ............. cossussesssnuecessauetassss
5.14 Software Reliability
.
5.14.1
sssusansssscnusvonsonecennsesssesnuscensesnsanesarssss crasscenseess wee 43
v Syllabus Tople : Formal Technical Review (FTIR) .ssessssssssscssnssessnnsen
rseeseerassserssseres ve 5-43
5.15 Forme! Technical Review (FTR) (Dec. 15, May 16, May 17, May 18)........sssssssssssse
anesanssnavanssansnsssssssassase nnesnana navansss ecenncan asssssse gseeesen eess 5-43
5.15.1 Steps in FTR (May 18)......cssssssssssssssesecsscssonsssonusssnsssnssnssonssnnnens
ene
ecsesronsnsnsannanssnecnanccnsangganccnngsnnsansnanasenenaneaanseenseneeagesaeys tat 5-45
v Syllabus Topic: Walkthrough ....ssssssssssssnsnsssssssseessnvanseesceremannaranseers
ssscnscasete
snsstanseseenenesueunnnanssonsnensacecencnnacaneaaganancannnanganesannyanayasnes 5-45
5.16 Walkthrough (May 16)....csssssssessesssssuvsnsseseeerssvanssereenssessssesseeseen
ensssensoussansennssarsseseenseevensssensanesesssansossnens 5-45
5.17 Comparison between FTR and Woligurcsdh (MY 16) ou... a ecsecsecsessscsssssscessssssssenssonsnns
nssnscoesequtans¢aesensoecnseenveenseshyaneceoessies achouauarenee BEEN s inaiecancoansecssosveasones 5-46
e Chapter Ends .......... sncovenensseiasesausesoeesesshesntnattscntoaaccsnavceesoesasocu
Module 6

Scanned by CamScanner
‘e c

ae

‘a a

“teh BT Sofware Engineering (MU - Sem. 6 - Comp) ,


Sy O49 Adtvarniages of Software Teating tatta «4 Cortaran
Testing! roy
by ALL Types ot Softwa
, : , : 62
ae Testing
Ditterence between Maerua! and AttomationSdeascmncimenensceass
M8 eT T TUNG
of Software
Princysles me roca
ae % 6.14 § as serene
a
“8g, G15 of Sohware Testing (Dee, 16)..
Objectives -
— eS
B10 Software Testing Process... sascosihiet
~ %
65
Y Byfebus Topte : Strategic Approach to Software Testing won oe ntibre “1
Soft t “eee : sertercaees ee
82 Strategic Approach to
1
2 Sytiabus Tople : Verification and Validation
6.2.1 Verification and Validation 0... _
6
622 Difference between Verification
and Validation (May 15, Dee. 17)..... = : “9

‘63 Unit Testing (Dec. 15)


6.3.1 Stubs and Drivers in Unit Testing. oe
63.2 List of Errors Detected by Unit Testing. veees tiie 14
Integration Testing eu
wv Syllabus Topic :
eis
ad Integration Testing (Dec. 15, Dec. 16)...
6.4.1 Types of Integration Testing S15
v Syllabus Topic : Validation Testing 128

65 Validation Testing, 18
6.5.1 Validation-Test Criteria 618

Configuration Review E13


6.5.2

65.3 Alpha and Beta Testing........ 619


G21
6.5.3(A) Difference between Alpha and Beta Testing
6-21
v Syllabus Toplc : System Testing ........---ssesessensnensesnerersserees
sesvenenusesseassessasseseeete 621
6.6 System Testing (May 17) ......... :
to 6-24
¥' Syllabus Topic : Software Testing Fundamentals.........
seecneseesonosessavensonensnensonseeess 6-24
6.7 Software Testing Fundamentals ............s+sssse0
..esssssssssssesssssessessnssnserssssnsenesnenessseanenneeet so 25
6.7.1 Characteristics of a Good TeSt
v Syllabus Topic : White-Box Testing.............

6.8 Whito-BOx Testing .......ssssssssscsssscsscensecsnsessssesssecennenceseansnaneansensanessansesensece


6.8.1 Advantages of White Box Testing........
6.6.2 Disadvantages of White Box Testing
SES
fifieiesbag Y Syllabus Topic : Basis Path Testing ...svnsnenesnnnnnrnnstannninne
Dec. 17)
6.9 Basis Path Testing (Dec. 15,
Seesuasee
6.9.1 Flow Graph Notation

= 6.9.2 Basic Terminology associated with The Flow Graph...


18) ......sscssseers avaiadbbastoneneesit vans sonasasnsaucnsnuavssoesesanences
6.9.3 Cyclomatic Complexity (Dec. 47, May
6-1 to 6-45

6.9.4 Deriving Test Cases ........ sees


cmapie vents ctohapteerramcsncerorerereeneenern
ystem Testing. 6.9.5 Graph Matrices .......s0 vie

Testing.....
ting, Softwar; y Syllabus Tople : Control Structure peacouceranssesnnasensnees
rannmnnnnertese easinsese om
.....ssssesssnseesnoreesnereemannema
Control Structure Testing.
&1

Scanned by CamScanner
. 6 - Comp)
ineering (MU - Sem
eer Software Eng rr
Cond itio n Testing.......-eseee
6.10.1
Data Flow Test ing.
6.10.2

Topic:
Sytlabus
eeeeeeee
ing (Dec. 1G) see
6.11 Black Box Test -..
k Bo Testing
x
6.11.1 Types of Blac ..
of Bla ck Box Testing
6.11.2 Advantages g.. .
tin e
and Black Box Testing Techniqu
Tes
s of Black Box (May 15, May 16)
e113 isadvan' an
Di e White Box Testing
Differe
6.11.4
te nance
: Software Main
Syllabus Tople
(May 17).-----
intenance 6-24 Nature of Software, Software En
6.12 Software Ma
nce .------ =
6.12.1 Cost of Maintena ue 6-39 Prescriptive Process Models
re ven
ab us Top ic : Types of Softwa ~
Models, Concurrent Models, Ac
Sy ll . 16) -
-..
e (May 16, Doc
es of So ft wa re Maintenanc 6-43
6.13 Typ e
nennv
s TT enmne
w ren
aanenseene
n e! mneon

twa_re Fre
le : Sof— -engineeing. ee ree
v labus Top
Sylee 7
sasiaer

6.14
erse Engineering.
Syllab us Topic : Rev naneeses
May 18).....-- ceceacensene
v
(May 15, May 16,
6.15 Reverse Engineering
nnannnnneate aaneeee:
Chapter Ends. sesrneennn
«
@ Definition
Computer software,
instructions that tell
built, that actually ;

- In computer
d
processeby
Nae

-— Computer s
7 as online di

- Computer
own,

— At the \
individu

- A mack
chang¢

- Fore
comp

- Ani
:
syst

Scanned by CamScanner

You might also like