GIP Part 3 New
GIP Part 3 New
GIP Part 3 New
10. Where can one find the information with regards to Testing Standards and Defect Management
guidelines?
11. Which among the list below is the PRIMARY source of the project goals in the Metrics Selection
Tool?
12. According to GIP, "Remark" is a status assigned to the QA Test Defect when
13. What does the term "Living" indicate when it is associated with an Artifact?
15. Sudha is to lead a project for a client in Japan. Language constraint is identified as a key challenge
in the requirement gathering phase. What is the MOST effective method to be adopted
Hold
Account owner
10. As per the PTR template in GIP, what are the Mandatory activity for a maintenance project
14. During Detailed Design how does one address non functional requirements
15. Identify what will NOT influence the Quality Plan for a project?
SARB Comments
To identify all requirements are translated into implementation, to verify all features
implemented can be traced to an approved source and traceability between requirements is
maintained for ensuring integrity
18. The assertion that is true in its completeness with respect to work product audit is
21. Identify the activity FIRST leads to the creation of Scope-Traceability Matrix
Manage Requirements
24. As per the PTR template in GIP, what are the Mandatory activity for a maintenance project?
25. What is NOT a key criterion for evaluating adequacy of a requirement statement
Simple
27. A project manager decides to identify and map dependent requirements. Which artifact would be an output
of this?
Scope and Traceability Matrix
28. Sumathy is the Quality Partner for a Project. What is Smithy’s role in developing the PTR for the project?
Review PTR
29. Due to time constraint the team has only limited time to close comments arising out of the work product
audit. What should be the BEST consideration to identify the subset of comments for closure?
All comments whose impact on non-implementation is high needs to be closed