9.

What is of LEAST importance as an input to process improvement initiatives

Team Score Card (*)

10. Where can one find the information with regards to Testing Standards and Defect Management
guidelines?

Project Engineering Guidelines (*)

11. Which among the list below is the PRIMARY source of the project goals in the Metrics Selection
Tool?

Process Performance Baseline (PPB) (*)

12. According to GIP, "Remark" is a status assigned to the QA Test Defect when

The defect is raised by the QA Test team (*)

The defect is rejected as "not reproducible" by the Development team

13. What does the term "Living" indicate when it is associated with an Artifact?

Artifact that is going to be updated throughout the project lifecycle (*)

14. Identify the PRIMARY benefit of a DAR process

Provides a framework for option analysis and removes bias (*)

15. Sudha is to lead a project for a client in Japan. Language constraint is identified as a key challenge
in the requirement gathering phase. What is the MOST effective method to be adopted

Usage of "Use Case Diagramming Method (*)

1. Identify the activity that will NOT lead to a change request

None of the Options (*)

2. What is the purpose of Refactoring the code

All the options (*)

3. What is the applicability of the program management discipline

All the options (*)


1. Sudha is to lead a project for a client in Japan. Language constraint is identified as a
key challenge in the requirement gathering phase. What is the MOST effective
method to be adopted?

Usage of "Use Case Diagramming Method"

2. “Defect to Remark Ratio" metric is a DIRECT indicator of

Efficiency of the QA Test Team

3. Review plan is placed in


PAD

4. "Perform Architectural Analysis and Design" is NOT required for

Systems with existing well-defined architecture

5. Who should approve the Project Approach Note

Delivery Head, as he is the management representative

6. Identify what is NOT an appropriate status during change approval?

Hold

7. What is incorrect about Contract Compliance Checklist

It is prepared by Project Manager

8. Contract compliance conducted by

Account owner

9. Where is the reuse area(s) identified for a project

Project Approach Document

10. As per the PTR template in GIP, what are the Mandatory activity for a maintenance project

Project Effort Estimate


11. Risk tracking during project execution is done using

Project risk list


12. What is the primary intent of an architectural POC
Prove feasibility of the system to architecturally significant requirements

13. What is normally NOT included in a deployment package


Review Reports

14. During Detailed Design how does one address non functional requirements

By mapping Design elements to State Chart Diagram

15. Identify what will NOT influence the Quality Plan for a project?

Feed from other Quality Partners

16. What is normally NOT discussed in an Account Business Review

SARB Comments

17. What is the PRIMARY intent of bi-directional traceability

To identify all requirements are translated into implementation, to verify all features
implemented can be traced to an approved source and traceability between requirements is
maintained for ensuring integrity

18. The assertion that is true in its completeness with respect to work product audit is

Review of artifacts by the process consultant is considered as work product review

19. Identify what is NOT an input for "Planning the Integration

Developer Release Notes

20. Who is authorized to "Close" an implemented CR

Member of the CCB

21. Identify the activity FIRST leads to the creation of Scope-Traceability Matrix

Manage Requirements

22. What is the src of CI for Performing Product Audit


Found in Configuration Project Repository
23. The status "living" is assigned to a document. what does it mean

document that is changed through out the life cycle

24. As per the PTR template in GIP, what are the Mandatory activity for a maintenance project?

None of the options

25. What is NOT a key criterion for evaluating adequacy of a requirement statement

Simple

26. What is not relevant to PM Activities

Account delivery report

27. A project manager decides to identify and map dependent requirements. Which artifact would be an output
of this?
Scope and Traceability Matrix
28. Sumathy is the Quality Partner for a Project. What is Smithy’s role in developing the PTR for the project?
Review PTR

29. Due to time constraint the team has only limited time to close comments arising out of the work product
audit. What should be the BEST consideration to identify the subset of comments for closure?
All comments whose impact on non-implementation is high needs to be closed