PT INDOBARA BAHANA

ASSESSMENT
OF FIRE PROTECTION SYSTEM
1/3
1969 Since our creation in 1969, we specialize in providing
water pumps and rotating equipment at Jakarta

1992 We had developed into company contracting


company and had opened a branch office at
Surabaya.
1998 Consequently, in 1998, a workshop and warehouse
was built at Perdatam, Jakarta.

2003 We have since further extended our reach to


provide an all-round solution and ventured into fire
detection & protection as well as security access in
2003
2009 We also expanded into environmental solutions
through corporate partnerships with water treatment
and energy saving products.

2/3
SCOPE of WORK
• Membuat desain fire fighting sesuai standart yang berlaku
DESAIN • Sesuai dengan kebutuhan di lapangan

• Supply material dengan standart yang jelas


SUPPLY • Material berkualitas

• Tenaga ahli berkualitas


INSTALL • Menerapkan standart yang tinggi

• Uji coba system sesuai desain


TESTCOMM

• Operasional, perawatan dan pemecahan masalah


TRAINNING • Dokumen lengkap

• Fire fighting existing


ASSESSMENT • New fire fighting
3/3
BRAND and REFERENCE

ACTIVE PASSIVE

DETECTION

REFERENCE

4/3
ASSESSMENT
Kegiatan inspeksi, testing dan analisa terhadap fire protection system
dengan tujuan:
1. Mengetahui performa dan fungsi existing system
2. Mengetahui akar permasalahan system berdasarkan filosofi fire
protection dan dapat ditentukan solusi yang tepat dan ekonomis
3. Membandingkan existing system dengan standart yang disepakati
4. Melengkapi fire protection sesuai dengan standart yang
disepakati

5/3
Scope of Work

CO2 SYSTEM INERT GAS SYSTEM CLEAN AGENT SYSTEM FIRE ALARM SYSTEM

FOAM SYSTEM HIDRANT SYSTEM SPRINKLER SYSTEM ASSESSMENT REPORT

6/3
ASSESSMENT SYSTEM
Fire Alarm system

Waterbased system a) Smoke Detector

a) Fire pump b) Heat Detector

b) Hidrant system c) Flame Detector

c) Sprinkler
Fire Suppression system
d) Nozzle/ deluge system
a) CO2
e) Foam
b) Clean Agent
c) Inert Gas
7/3
Masalah yang Sering Terjadi
1. Fire alarm sering bunyi dan tidak tahu
masalahnya apa. Panel di silent.
2. Tidak mengerti cara mengoperasikan
maupun maintenance fire fighting.
3. Tidak mengetahui proteksi yang sesuai
dengan bahan/ruangan yang diproteksi.
4. Tidak mengetahui peraturan atau
persyaratan yang sesuai untuk proteksi
kebakaran.
8/3
The National Fire Protection Association (NFPA) is a global nonprofit
organization, established in 1896, devoted to eliminating death, injury,
property and economic loss due to fire, electrical and related hazards.
NFPA delivers information and knowledge through more than 300
consensus codes and standards, research, training, education,
outreach and advocacy; and by partnering with others who share an
interest in furthering our mission. NFPA membership totals more than
60,000 individuals around the world.

9/3
NFPA Title Keterangan
NFPA 850 Recommended Practice for Fire Rekomendasi Fire Protection
Protection for Electric Generating untuk Pembangkit Listrik
Plants and High Voltage Direct
Current Converter Stations
NFPA 20 Standard for the instalation of Standart untuk pemasangan
stationary pumps for fire protection pompa pemadam kebakaran
NFPA 24 Standard for the Installation of Standart untuk pemasangan
Private Fire Service Mains and Their hidran pilar dan aksesorisnya
Appurtenances
NFPA 25 Standard for the Inspection, Testing, Standart untuk inspeksi, testing
and Maintenance of Water-Based dan pemeliharaan proteksi
Fire Protection Systems dengan bahan dasar air

10/3
NFPA Remarks Keterangan
NFPA 13 Standard for the Installation of Standart instalasi Sistem
Sprinkler Systems Sprinkler
NFPA 15 Standard for Water Spray Fixed Standart untuk sistem
Systems for Fire Protection Waterspray
NFPA 11 Standard for Low – Medium – High Standart untuk Foam
Expantion Foam
NFPA 2001 Standard On Clean Agent Fire Standart untuk pemadam Clean
extinguishing System Agent
NFPA 72 National Fire Alarm and Signaling Standart untuk Fire Alarm
Code

11/3
Underwriters Laboratories
As a global company with more than 120
years of expertise, UL works with
customers and stakeholders to help them
navigate market complexity. UL brings
clarity and empowers trust to support the
responsible design, production,
marketing and purchase of the goods,
solutions, and innovations of today and
tomorrow. We connect people to safer,
more secure, more sustainable products,
services, experiences and environments
– enabling smarter choices and better
lives.
http://www.ul.com
12/3
Factory Mutual
FM Global is a Johnston, Rhode Island-based
mutual insurance company, with offices worldwide,
that specializes in loss prevention services primarily
to large corporations throughout the world in the
Highly Protected Risk (HPR) property insurance
market sector. "FM Global" is the communicative
name of the company, whereas the legal name is
"Factory Mutual Insurance Company". FM Global
has been named the "Best Property Insurance in
the World” by Euromoney Magazine.
This business approach is centered on the belief
that property losses can be prevented or mitigated.
FM Global engineering personnel regularly visit
insured locations to evaluate hazards and
recommend improvements to their property or work
practices to reduce physical and financial risks if a
loss occurs.

http://www.fmglobal.com
13/3
KAPAN PERLU ASSESSMENT?
1. Jika ada modifikasi pada system, area, atau material utama.
2. Saat penambahan system baru, terutama jika terkoneksi dengan
system yang sudah ada.
3. Setelah fire system terpakai dalam waktu tertentu
4. Saat terjadi kerusakkan / trouble / error pada system.
5. Untuk menguji kehandalan fire system yang sudah ada. Termasuk
sesuai atau tidak suatu system dengan area proteksi.

14/3
METODE KERJA
Visual Cek. Tes Performa Laporan akhir
• Area • Performa system • Rekomendasi final
• Komponen • Trouble • Design, drawing & calculation
• RAB

Tes Fungsi Laporan Awal


• Fungsi system • Rekap system
• Trouble • Rekap fungsi
• Hasil performa tes
• Kondisi Rekomendasi awal

15/3
1. Visual checking:
• Area sudah terdapat deteksi/
proteksi
• Kondisi fisik system
• Komponen yang dipakai
• Notifikasi Trouble pada system

16/3
2. Tes Fungsi
• Fungsi system
• Memastikan permasalahan pada system

17/3
3. Tes Performa
• Performa system (fire pump, hydrant terjauh & tertinggi, deluge
system terbesar & tertinggi)

18/3
4. Laporan Awal
• Rekap system

REKAPITULASI FIRE PROTECTION SYSTEM


Detection Tipe
Deluge Sprinkler CO2 Gas
No Area
Sistem Sistem Supp
LHD Smoke Det. Heat Det. Flame Det. Gas Det.

1 WWTP & Lab Building 1 2 21

2 Dirty oil Pool & Oil Separator 2 2

3 Demineralization Water Tank 5

4 Start Up Boiler 1 2 2

5 Fire Pump House 1 2 2

6 Emergency Diesel Generator 1 2 6

7 Chlorination Plant 6 1

8 CW Pump 1 2 6

9 Compressor Building 1 2 11

10 Hydrogen Plant 1 4 6

11 Oil Pump House 2 ` 6

12 Warehouse 22

13 Gedung Administrasi 10 54

14 Transformer 4 9

15 Boiler Area 8 32 2 6 2

19/3
• Rekap Fungsi
FUNGSI WATER BASED FIRE PROTECTION SYSTEM
Result
No Nama Sistem Keterangan
Pass Fail Unknown
1 Start Up Boiler √ Miss Communication
2 Auxiliary Transformer A √
3 Auxiliary Transformer B √ No Power
4 Start Up / Stand by Transformer √
5 Generator Transformer √
6 Bearing Turbin Generator √
7 BFPT √ Miss Communication
8 Burner Boiler √ LHD di copot
9 Air Preheater √
10 Operating Deck of Fuel Oil √ No Detector
11 EDG Room √
12 Diesel Fire Pump √
13 Fuel Oil Pump √
Miss Communication
14 Compressore Building √
15 Hidrogen Plant √
16 HSD Tank √ Miss Communication
17 ID Fan A & B √
No Detector / Manual Operation
18 FD Fan A & B √
19 Main Oil Tank √
20 Seal Oil generator √
No Power
21 Oil Pipe Ground Floor √
22 Oil Pipe Ground 2nd Floor √
23 Meeting Room CCB √ Miss Communication
24 Cable Galley CCB √ Miss Communication
25 Dust Collector Room √ Miss Communication
20/3
FUNGSI CO2 GAS SUPPRESSION FIRE PROTECTION
No
SYSTEM
Nama Sistem
Result
Releasing Panel Type Keterangan
Pass Failed
1 Relay Room CCB √ - Damper tidak aktif
Station Service Switchgear
2 √ - AC tidak mati
Room
3 Turbine MCC Room √ - Tidak terkoneksi ke CCR
Turbin House Switchgear - Tangki CO2 kapasitas 8Ton; 2pcs (Total
4 √
Room 16Ton)
5 Boiler MCC Room √ - Agent CO2 yang tersedia = 0
6 Emergency Boiler Room √ Low - Horn Strobe lokal tidak aktif
7 6Kv Station Service Room √ Notifier 3030 Pressure - Gas discharger tidak aktif
8 Boiler Switchgear Room √ System - Notifikasi general
9 Boiler Electronik Room 1 √
10 Boiler Electronik Room 2 √
11 Turbin Electronik Room √
12 CCR √
13 Electronik MCC Room √
14 Electrical Equipment Room √
15 Coal Bunker 1 √
16 Coal Bunker 2 √ - Manual Operation
- Tangki CO2 kapasitas 8Ton; 2pcs (Total
17 Coal Bunker 3 √
Low Pressure 16Ton)
18 Coal Bunker 4 √ Notifier 3030 - Agent CO2 yang tersedia 3 Ton
System
19 Coal Bunker 5 √
20 Coal Bunker 6 √
21 Coal Bunker 7 √
21/3
• Hasil Performa tes

22/3
• Kondisi menyeluruh fire Proteksi

OVERALL KONDISI FIRE PROTECTION


1. Hydrant, deluge system, sprinkler system dan foam system dalam kondisi tidak
aktif.
2. Header Fire pump mengalami kebocoran.
3. Pipa underground area area boiler dan Transfer tower 1 & 2, mengalami
kebocoran
4. Jalur pipa di area coal handling dan jetty berada di pinggir jalan
5. 8 unit hydrant box tidak terdapat hydrant hose dan hydrant nozzle
6. Jockey pump kondisi rusak.
7. Releasing Deluge system area Coal handling manual karena FACP kondisi
rusak dan sudah absolote

23/3
• Rekomendasi awal

REKOMENDASI
DESKRIPSI PRIORITY
1. Revitalisasi Hydrant system: 1st
• Pengantian header pompa hydrant
• Up-grounding pipa hydrant area boiler dan Transfer tower 1 & 2
• Pengeseran pipa hydrant ke jalur aman & penambahan isolasi valve
• Metode installasi pipa cross road (existing timbun) diganti mengunakan
U-ditch & grating
• Penambahan hydrant hose & hydrant nozzle.
• Pengantian 1unit jockey pump

2. Otomatisasi existing deluge system area Coal handling dan Up-Grade fire alarm 2nd
area Coal handling

3. Up-Grade sprinkler system coal conveyor menjadi deluge 2nd

24/3
Laporan Final
1. Final rekomendasi :
• Analisa existing vs standard NFPA

25/3
• Analisa performa fire pump vs kebutuhan system/ skenario
kebakaran

Fire case coal handling

26/3
2. Detail Engineering Design
3. RAB

27/3
Tenaga Ahli

No Tenaga Ahli Sertifikat/ Pelatihan


1 Agustinus Joko Waluyo Ahli teknik proteksi kebakaran

Member NFPA

Ahli K3 Umum

Ahli K3 Listrik

Desain fire Pump - SPP

Desain water base fire protection - Viking

2 Johan Wibisono Ahli teknik proteksi kebakaran

Member NFPA

Ahli penagulangan kebakaran class A,B,C & D

Desain water base fire protection - Viking

3 Abdlu jabrutyas Ahli K3 Listrik

Desain Fire Alarm - Simplex

3 Aluisius Krismartanto Ahli penagulangan kebakaran class A,B,C & D

Ahli door fan tes – lvl 3

28/3
PENGALAMAN ASSESSMENT
No Customer Proyek Tahun
1 PJB 9 Paiton Study Hydraulic Waterbased system 2014
2 PJB Rembang Study Hydraulic Waterbased system 2015
3 PJB 9 Paiton Assessment Hydrogen Plant 2015
4 PJB 9 Paiton Assessment ruang Server 2016
5 IP Perak Jasa Performa Tes Fire Pump 2016
6 PJB Indramayu Jasa HiCal Waterbased System 2016
7 IP Priok Jasa HiCal Waterbased System 2016
8 IP Lontar Jasa Assessment Waterbased system 2017
9 IP Pusat Assessment Fire Protection Pangkalan Susu dan Banten 2017
10 PLN Asam Asam Assessment Waterbased System PLTU Asam Asam 2018
11 PLN UP2B Assessment Fire Fighting kantor UP2B Kalselteng 2019
12 IP Jeranjang Assessment Fire alarm dan Fire Suppression PLTU Jeranjang 2020
13 UP3 Berau Jasa Konsultan Perencanaan Pengadaan dan Pemasangan Fire 2022
Hydrant Kantor dan Fire alarm Gudang

29/3
ONE STOP SOLUTION
Product System Reference
Hydrant Pump

Sprinkler, Nozzle, Foam,


Cooling System

Fire Suppression

FM200 System

Cabinet Fire Suppression

Fire Detection

Firestop and Cable Coating

Safety Shoes

30/3
THANK YOU!

31/3

You might also like