Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Borelog CP.101

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LMS-01

RENTANG HEADWORKS AND CIPELANG MAIN CANAL UPGRADING WORKS FOR RENTANG IRRIGATION MODERNIZATION PROJECT

BOREHOLE LOG Hole No. : CP 101 Sheet No. : 1 of 1


Project Soil Investigation Rentang Irrigation Modernization Project Depth 20,00 m Drilling Rig KOKEN
Site Cipelang Coordinate x : 195692.753 y : 9265336.630 Inclination Vertical Drilled By MAKSUD
Elevation 14,525 m Date 20 Mei 2021 to 22 Mei 2021 GWL m Logged By Hanung
SPT N-Value Core Recovery (%) RQD (%)

Core Barrel &


Permeability

Casing Pipe
Formation

Rock Class
Depth (m)

Depth (m)
Bite Type
Elevation

Column
Section

SCR TCR

Sample
GWL
Date

Description Number of Blows per 15

Nilai

Nilai
cm Penetration

Nilai

Nilai
10 20 30 40 20 40 60 80 20 40 60 80 20 40 60 80
# # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
0,00 +14,53 (0-6) Clayey Sand, SW, Brown-Grey, Fine Sand-Very Fine Sand 0,00
Thursday, 20 May 2021

with Clay, Medium Plasticity, Loose-Medium Dense, Well 10 100


Graded, Moist
1,00 6 1,00

91 95
2,00 2,00
UDS-01
15 95 100
3,00 SC 3,00

9 80 85
4,00 4,00

11 65 80

5,00 5,00
UDS-02
100 100
6,00 6 6,00
(6-8,8) Silt, SW, Grey, High Plasticity, Medium Stiff, Moist
45 80
Friday, 21 May 2021

7,00 7 7,00

76 90 MH

8,00 6 8,00

60 90
9
Flood Plain Deposits

9,00 (8,8-11) Clay, SW, Grey, High Plasticity, Very Stiff, Moist 13 9,00

Casing Ø 89mm
3,10E-06

SCB Ø 73mm
87 100
10,00 27 CH 10,00
10
93 100
11,00 34 11,00
(11-20) Clayey Sand, SW, Grey, Fine Sand-Very Fine Sand
with Clay, Low Plasticity-Medium Plasticity,Dense- Loose, 53 80
Well Graded-Poor Graded, Moist
12,00 41 12,00

91 85
13,00 >50 13,00

76 90

14,00 >50 14,00

63 85

15,00 6 15,00
Saturday, 22 May 2021

70 100 SC
16,00 5 16,00

40 100
17,00 9 17,00

52 95

18,00 3 18,00

30 85
19
19,00 4 19,00
2,20E-04

91 95
-5,48
20,00 20,00
20,00

21,00 21,00

22,00 22,00

23,00 23,00

24,00 24,00

25,00 25,00

*SCB=Single Core Barrel


*DCB=Double Core Barrel
*TCB=Triple Core Barrel
Sampling Uji Lab
VENDOR KONSULTAN KONTRAKTOR

___________________________________ ___________________________________ ___________________________________

You might also like