PNGRB Technical Standards 2018 Schedule 2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

SCHEDULE 2

[See regulation 6(2)]

STORAGE, HANDLING AND DISPENSING AT AUTO LPG DISPENSING STATIONS

1.0 SCOPE:

The technical standard and specifications including safety standards under this Schedule
lay down the minimum requirements in design, operation, inspection, maintenance, training,
consumer safety at auto LPG dispensing stations (ALDS) and do not cover the certification or
fitness requirements of vehicles using auto LPG.

2.0 DEFINITIONS:

In these regulations, unless the context otherwise requires,

(a) “Auto LPG” means a mixture of certain light hydrocarbons derived from petroleum, which
are gaseous at normal ambient temperature and atmospheric pressure but may be
condensed to liquid state at normal ambient temperature by the application of moderate
pressure, and which conforms to IS :14861;

(b) “Auto LPG Dispensing Station (ALDS)” means the premises used for storing and
dispensing auto LPG to the motor vehicles for automotive purpose;

(c) “Auto LPG Tank” means a steel container for storage and transport of Auto LPG, fitted
permanently in a motor vehicle or vehicle as its fuel tank, for automotive fuel and filled in
that position and conforming to IS:14899 and as approved by the Petroleum and Explosives
Safety Organisation under Gas Cylinder Rules, 1981;

(d) “Auto LPG Tank Truck” means a truck mounted with a properly designed vessel/tank for
transportation of auto LPG in bulk to the dispensing stations;

(e) “Bob tail” means a truck mounted with a properly designed vessel or tank with flowmeter
pump skid for transportation of LPG in bulk to the dispensing stations.

(f) “Bulk storage” means the facilities for storing LPG in stationary pressure vessels exceeding
the capacity of 1000 Lt and these pressure vessels shall conform to the Static & Mobile
Pressure Vessels (Unfired) Rules, 1981.

(g) “Dispenser” means the equipment provided in the ALDS for delivering LPG to the Auto
LPG Tank of motor vehicles;

(h) “Emergency shut off valve” means a shut off valve which, in an emergency, operates
automatically or can be operated remotely;

(i) “Filling Point” means the point of inlet pipe connection of a bulk storage tank for MS or
HSD or LPG, where hose is connected for filling the products into the tank;

45
(j) “LPG Tank Truck Unloading Hard Stand” means the area specially prepared in a Auto
LPG Dispensing Station beside the LPG fill point for unloading from tank truck to bulk
storage vessel;

(k) “LPG vent” means the vertical pipe provided on the vessel for discharge of LPG vapours
from safety relief valve at a height of at least 2 meters above the top level of the vessels
but not less than 3 meters from the ground level;

(l) “MS or HSD Vent” means the vertical pipe open at the top, fitted on an underground tank
in retail outlets for breathing;

(m) “Retail Outlet or MS or HSD Service Station” means the segregated area provided with
facilities and specially prepared, for storage and delivering MS or HSD to the fuel tanks of
motor vehicles; and

(n) “Safety Relief Valve” means a pressure relief device fitted on a pressure vessel to protect
the vessel against maximum allowable pressure;

3.0 LAYOUT AND FACILITIES:

3.1 General Guidelines:

(i) The layout should ensure unobstructed movement of all vehicles together with adequate
provision for entry and exit of Tank trucks;

(ii) Location of the facilities, equipment, entrance, exit and paving shall be arranged in a such
manner to avoid the risk of any collision amongst the motor vehicles;

(iii)The fuel lines shall have a positive segregation with electrical cables;

(iv) It is preferable that there should be unobstructed view of the operating and dispensing areas
from the salesroom;

(v) Access for mobile fire fighting equipment to all the ALDS facilities shall be ensured;

(vi) In case of above ground bulk storage vessels, provision of storage of adequate fire water
shall be made;

(vii) Provision of escape route for personnel and vehicle in emergency shall be made; and

(viii) The LPG bulk storage area at ALDS shall be enclosed by an industrial type fencing at least
2 M high erected on a kerb or toe wall of at least 0.3 M high and fill point shall be at the
inner edge of this fencing and such area shall be suitably guarded against vehicular impact.
Such fence shall have at least two means of exit and the gates of such exits shall open
outwards and shall not be self-locking.

3.2 Siting and Layout:

46
ALDS may be located in an existing petroleum retail outlet station. Safety distances to be
followed are given in the table 1 and 2 below:

TABLE - 1

Safety distances for bulk LPG storage vessels

Serial Water Capacity of Minimum distance from line Minimum distance between
No. vessel (in litres) of adjoining property or vessels (in metre)
group of buildings not
associated with storage and
operation. (in metre)
Above Underground or Above Under ground or
ground above ground ground above ground
vessel vessels covered vessel vessels covered
with earth with earth
(mound) (mound)
(1) Not above 2000 5 3 1 1
(2) above 2000 but not 10 3 1 1
above 7500
(3) Above 7500 but not 10 5 1 1
above 10000
(4) Above 10000 but not 15 7.5 1.5 1
above 20000
(5) Above 20000 but not 20 10 2 1
above 40000

TABLE – 2

Minimum Safety Distances (in meters) between facilities associated with storage and
dispensing of LPG in ALDS

S. To from LPG Fill LPG Propert Petroleum class A or B service


N storage point of Dispenser y Line / station licensed
o. vessels LPG building
storage s* Fill point Vent Petro-
vessel of pipe of leum
and petroleum petro- class A
centre of class A or leum or B
LPG B tanks class A dispens
tank or B ing
truck tanks pump
unloadin
g hard
stand

47
1 LPG As specified 9 (above 9 (above As 9 9 9
storage in Table -1 ground ground specified
vessels or vessels not in Table
mounted exceeding 1
vessels 20000 litres
exceedin capacity or
g 7500 undergroun
litres d or
capacity) mounded
vessels)
6 (above 15 (above
ground ground
or vessels
mounded exceeding
vessels 20000 litres
not capacity)
exceedin
g 7500
litres
capacity)
3
(undergr
ound
vessels)
2 Fill 9 (above - 6 9 6 6 6
point of ground or
LPG mounted
storage vessels
vessel exceeding
and 7500 litres
centre of capacity)
LPG 6 (above
tank ground or
truck mounded
unloadin vessels not
g hard exceeding
stand 7500 litres
capacity)
3
(undergroun
d vessels)

48
3 LPG 9 (above 6 - 6 6 6 6
dispense ground or
r mounted
vessels
exceeding
20000 litres
capacity or
under-
ground or
mounded
vessels)
15 (above
ground or
mounded
vessels
exceeding
20000 litres
capacity)
4 Property As specified 9 6 - 3 4 6
line/ in Table - 1
building
s*

* The distance of sales room shall be maintained as specified by Petroleum and Explosives Safety
Organisation.

Notes:

(i) If the aggregate water capacity of a multi vessel installation exceeds 40 KL, the minimum
safety distance from any vessel to the property line or group of buildings shall not be less
than 30 m for above ground vessels and 15 m for underground vessels;

(ii) The distances specified in clause (i) are required to be measured from the nearest point on
the periphery of the vessel;

(iii)Minimum 6 m distance shall be kept between LPG bulk storage vessel and Storage vessel
of the other petroleum products and

(iv) Typical layout of installation is specified in as annexure – I.

3.2 Bulk Storage Vessel:

i. The mechanical design of the storage vessel shall be based on following considerations,
namely: -

49
(a) The storage vessel shall be designed in accordance with the codes i.e. PD – 5500,
ASME-Sec VIII, IS:2825 or equivalent duly approved by PESO. Design shall also
take into account the requirements specified in Static and Mobile Pressure Vessels
(Unfired) Rules, 1981;

(b) A single code shall be adopted for design, fabrication, inspection and testing i.e.
ASTM and BS shall not be combined;

(c) Material: Carbon steel conforming to ASTM A516 Grade 60 / 70 or A537 Class
I. Micro-alloyed steel containing Ni, Mo, Va shall not be considered. Maximum
specified tensile stress of the material shall be below 80,000 psi;

(d) Design Temperature: -27 °C to +55 °C;

(e) Design Pressure: Maximum Vapour pessure of LPG conforming to IS: 14861 at
55 °C and shall be taken as 14.5 kg/cm2;

(f) Other Design Considerations:

(i) Corrosion Allowance: 1.5 mm (minimum);

(ii) Radiography: 100 %;

(iii)Stress relieving: 100% irrespective of thickness;

(iv) Wind pressure: as per IS: 875;

(v) Earthquake pressure: as per IS:1893;

(vi) Hydrotest pressure: As per design code and

(vii) Additional requirement, if any, on account of design codes or statutory


stipulations shall also be considered.

3.3.1 Above Ground Storage Vessel:

(i) The bulk storage vessel shall be placed on a firm foundation;

(ii) There shall be single nozzle at the bottom for liquid inlet or outlet with ROV
as first valve. The first flange shall be at least 3 m away from the shadow of
the vessel;

(iii)In multi vessel installation, top of the vessels shall be in the same plane, and

(iv) Suitable arrangement for draining of water from storage vessel shall be
provided with double valve.

3.3.2 Mounded or Underground Storage Vessel:

50
Mounded or Underground storage vessels shall also conform to the following
requirements, namely;

(i) The specific consideration shall be given to

(a) Internal vapour and hydraulic pressure

(b) External loading on the vessel; and

(c) Internal vacuum;

(ii) The dimensions (diameter and length) of the vessel shall be decided based on site
conditions, soil mechanics and other design considerations;

(iii)The vessel shall be protected against corrosion by appropriate anti corrosive


coating and provided with cathodic protection. Alternatively, steel tank can be
designed for the service life and shall be taken out of service on completion of
design service life with periodic inspections to verify the veracity of design
parameters;

(iv) The cathodically protected pipelines or vessels or other like things shall be isolated
from the unprotected structures or surfaces;

(v) Reference points on inner surface of the vessel shall be marked for non-destructive
testing for subsequent inspections;

(vi) The underground vessel shall be installed on a firm foundation and firmly secured
to the foundation so as to prevent movement or floatation;

(vii) The underground vessel shall be placed within a concrete or brick masonry pit
with a minimum gap of 1 m between the walls of the pit and the vessel as well as
in between the vessel;

(viii) The vessels shall be covered by earth or sand or any other non-corrosive material
and thickness of the covering material above the top surface of the vessel shall not
be less than 0.5 m; and

(ix) The fittings or mountings on the vessel shall be in such a way that these can be
operated and maintained without disturbing the earth cover.

3.4 Fittings:

Each storage vessel shall have at least two safety relief valves, two independent level
indicating devices, one independent high level or cut off switch with alarm, temperature
gauge, pressure gauge, suitable arrangement for water draining and other like fittings
Remote operated valve (ROV) shall be provided on all liquid and vapour lines connected
to the storage vessel.

51
3.4.1 Safety Relief Valve:

(i) Each safety relief valve shall be set to discharge at not more than 110 % of design
pressure and have relieving capacity adequate to prevent the maximum pressure in the
vessel from exceeding 120 % of the design pressure. Each safety relief valve shall be
provided with a lock open type isolation valve between it and the vessel so that one of
the two valves can be removed from testing without emptying the vessel.

(ii) The set and reset pressure of the safety valve shall meet the requirements of Auto LPG
conforming to IS: 14861; and

(iii)The relieving capacity of the safety valve storing LPG in mounded and underground
storage vessel shall be at least 30 % of that for above ground storage vessel in fire
condition.

3.4.2 Emergency Shut off Valve i.e. Remote Operated Valves:

(i) Emergency shut off valves of remote operated type shall be provided on all liquid and
vapour connections i.e. filling, discharge, pump by pass and vapour return lines of the bulk
storage vessels except those for safety valves or instruments tapping and those not
exceeding 3 mm diameter for liquid and 8 mm diameter for vapour. ROV's shall be
operable from sales room or control panel and from operating area;

(ii) The remote operated valves shall be fire safe valves with a closing time not exceeding 15
seconds;

(iii)ROV's shall have an open or closed position indicator; and

(iv) Additionally, isolation valves of ball type shall be installed at shortest distance from ROV.

3.4.3 Excess flow check valves (EFCV):

(i) Excess flow check valve shall be provided on the liquid lines. The closing flow of the
EFCV shall not be more than 120 % of the rated flow of the line or as recommended by
the manufacturer. Excess flow check valve shall be provided with a breathing arrangement
to allow equalisation of pressure; and

(ii) In closed position, the opening of the EFCV shall not be more than 2 mm2.

3.4.4 Manual Shut Off Valves:

Manual shut off valves shall be provided in all liquid and vapour pipelines as close to ROV
as possible. All shut off and isolation valves shall be of quick closing ball type, readily
accessible for operation and maintenance under normal and emergency conditions.

3.5 Tank Truck Unloading Facilities:

52
(i) The layout of the unloading location shall be such that tank truck being unloaded shall be
in drive out position;

(ii) Suitable provision shall be made for evacuation of LPG from bulk storage vessels to tank
truck to empty the vessel in case of emergency or for statutory testing

(iii)Tank truck shall be unloaded using hose with the breakaway coupling with isolation
arrangement on both ends so that no release of liquid LPG take place at the end of the
unloading. Alternatively, loading arms can be provided;

(iv) The hose - coupling or flange joint shall be of 300 lb rating with metallic gasket. The hose
coupling shall be provided with a cap or blind flange by which the nozzle can be closed
when not in use;

(v) The LPG hose used shall conform to Indian standard or API or EN codes;

(vi) Hose length shall not be more than 5.5 m;

(vii) The pipeline and the hose shall be laid so as to be above the ground to prevent any damage.
The entire assembly shall be suitable supported and be installed in a lockable enclosure;

(viii) The fill point shall be provided with non-return valve and quick shut off isolation valve;

(ix) Proper arrangement for earthing and bonding shall be made; and

(x) The vent pipe, if required, shall be at height of at least 3 m from the grade and 6 m away
from potential sources of ignition or likely places of vapour accumulation.

3.6 LPG Pump:

LPG pump can be either external or submerged.

3.6.1 External LPG Pump:

(i) Each pump shall have suitable arrangement for weather protection as per manufacturers
recommendations;

(ii) Pump and motor shall be effectively earthed;

(iii)Pumps shall be provided with arrangement to protect the pump casing from over pressure
when pumping against a closed discharge. The bypass shall discharge into the LPG storage
vessel at predetermined pressure; and

(iv) The maximum discharge pressure of the pump (shut off pressure) shall be less than the
design pressure of the piping system.

3.6.2 Submersible Pump:

(i) Pump shall be installed in properly designed well;


53
(ii) Design shall be based on combined load of pump, vessel and forces generated by operation;

(iii)Design shall be such that installation and removal of the pump can be done at any level of
LPG in the storage vessel;

(iv) Suitable arrangement for closing the flow of LPG from vessel to pump well shall be
provided;

(v) No LPG shall escape outside from the conduit or well during normal operation,
maintenance or sudden breakdown of any component;

(vi) Provision of purging the well or pump with nitrogen for complete gas freeing, prior to
removal of pump cover plate, shall be provided;

(vii) Provision of a pressure gauge shall be made at the discharge line of the pump;

(viii) Piping connections on well cover shall be provided with excess flow check valve;

(ix) Pump shall have in built safety interlock to stop automatically in the event of low level,
high temperature and dry condition; and

(x) Motor should be suitable for usage as per hazardous area classification.

3.7 Dispenser:

(i) The dispenser for Auto LPG Dispensing Stations shall be designed, constructed, tested and
maintained in accordance with the requirements laid down in SMPV Rules (unfired), 1981;

(ii) The dispenser shall be provided with an excess flow check valve, a remote operated shut
off valve and a pipe shear provision in that order in the liquid inlet pipe;

(iii)The dispenser shall be installed on a firm foundation and protected against physical
damage;

(iv) A breakaway device with excess flow valves or quick action cut off valves on both sides
of the breakaway device, conforming to UL 567 or equivalent shall be provided on the
delivery line from the dispenser so as to prevent spillage of liquefied petroleum gas from
both sides of the breakaway point in the event of its breakage;

(v) The dispensing nozzle at the end of the hose shall be of self-sealing type matching with
filler connection of multifunction valve conforming to IS: 15100, fitted on the Auto LPG
Tank of the vehicle. The liquid released on disconnection shall not exceed 5 ml;

(vi) The hose for delivery of liquefied petroleum gas by the dispenser to motor vehicles shall
be suitable for Auto LPG. The design pressure of the hose shall be minimum 25 kg/cm2
with a safety factor of five. The hose shall be electrically and mechanically continuous;

(vii) The length of the hose connected to the dispenser shall be kept minimum keeping in view
the operational requirement and shall not in any case exceed 5.5 m;
54
(viii) Clearly identified emergency shut down switches or circuit breakers shall be provided at
easily accessible location not less than 6 m away from the dispenser to cut off power supply
in the event of fire, accident or other emergency. The switches or circuit breakers shall be
visible from point of dispensing liquefied petroleum gas to motor vehicles;

(ix) Flexible hoses shall have permanent markings indicating the manufacturer's name or
identification, applicable code, working pressures and suitability of use with LPG;

(x) Provisions shall be kept to stop all operations simultaneously through push buttons located
near dispenser or sales room;

(xi) Means shall be provided on the outside of the dispenser to readily shut off the power in the
event of fire or accident; and

(xii) An excess flow check valve, or an emergency shut off valve shall be installed before the
connection of dispensing hose. A differential pressure valve shall be considered as meeting
this provision.

3.8 Automation:

The provisions as detailed in paragraph 5.0 of Schedule – I shall be complied with.

3.8 Piping:

(i) All metallic piping for LPG service shall be rated and designed to ASME-B-31.3 or
equivalent with minimum design pressure 25 kg/ cm2 with a factor of safety of four. The
materials of pipe shall be low carbon or alloy steel conforming to American Standard
ASTM-SA-333 grade 6, or SA-106 grade B Schedule 40 (for above ground) and Schedule
80 (for underground), or equivalent. The pipeline shall be tested at one and half times of
the design pressure, if hydro tested, or ten percent in excess of the design pressure if
pneumatically tested. Joints of pipeline above 40 mm diameter shall be welded or flanged.
Threaded or screwed connection shall not be provided except for special fittings like excess
flow valve, pump connections upto 50 mm diameter;

(ii) Piping shall be protected against physical damage, collision and corrosion;

(iii)Pipe length shall be short and diameter shall be kept as small as practicable;

(iv) Entire piping system including the appurtenances shall wherever possible be constructed
with welded joints and where necessary with flanged joints. The number of flanged joints
shall be kept down to a minimum;

(v) Piping shall be run as directly as practical from one point to another and with as few
restrictions such as elbows and bends as conditions will permit;

(vi) Provision shall be made in the piping including connection to the bulk storage vessel to
compensate for expansion, contraction, jarring, and vibration;

55
(vii) Wherever threaded joints are used, a seal weld shall be provided. All threaded joints and
socket weld pipe fittings shall be rated at least 3000 lb to BS 3799 or at pressure class 3000
to ASME B 16.5 or equivalent;

(viii) All gaskets shall be of flexi-metallic type. Whenever a flange is opened gasket shall be
replaced;

(ix) All flanged joints shall be rated at least class 300 to BS 1560: part 2 or ASME: B: 16.5 or
equivalent;

(x) Flexible piping connections shall be introduced into fixed piping systems wherever it is
necessary to absorb vibration or where a rigid connection is impractical. Flexible
connections shall be short and not exceed 500 mm in length and shall be of an approved
metallic construction suitable for auto LPG service and braided on outside with stainless
steel wire. The design parameters for flexible piping connections shall be identical to other
piping network. The non - metallic pipe, tubing or hose for permanently interconnecting
storage vessels shall not be used;

(xi) All sections of pipe in which LPG liquid can be trapped by the closing of the valves shall
be fitted with thermal safety valves and shall be located in fenced area; and

(xii) Upon mechanical completion of the ALDS, a complete set of as built installation drawings
shall be maintained.

3.9 Control Panel:

(i) A remotely located and easily accessible control panel for normal operations shall be
installed preferably at the sales room. It shall have provisions and indications of on or off,
low pressure of instrument air, high temperature trip of LPG pumps and quantity of product
in the vessel. It shall also have an alarm and indication for high level cut off. All indications
connected with emergency shut off switch shall be provided on this control panel along
with and "Reset" provisions;

(ii) Piping and Instrumentation Diagram (P and ID) of entire LPG system shall be displayed
near the control panel. (Typical P and ID is specified Annexure – II); and

(iii)All switches shall be clearly marked for its purpose in the field.

3.11 Electrical Equipment or Fittings:

The electrical equipment and fittings in ALDS shall conform to hazardous area
classification for that purpose and be of a type approved by the PESO. The extent of
hazardous area for dispenser at ALDS shall be as below, namely: -

(i) Entire space within the dispenser enclosure cabinet and 46 cm horizontally from the
exterior of enclosure cabinet and up to an elevation of 122 cm above dispenser base and
the entire pit or open space beneath the dispenser shall be Zone 1;

56
(ii) 46 cm vertically above surrounding ground level and horizontally beyond 46 cm up to 6 m
on all sides of the dispenser enclosure cabinet shall be Zone 2;

(iii)The area up to 1.0 m around the fill point shall be taken as Zone 1 and area within 1.5 m
of LPG vent shall be considered as Zone 1. The area beyond 1.0 m and up to 4.5 m from
fill point and beyond 1.5 m and up to 3 m from LPG vent shall be taken as Zone 2; and

(iv) The electrical power distribution system shall be as per clause 4.0 of Schedule – 1 of these
Regulations.

3.12 Fire Fighting Facilities:

(i) ALDS having only underground or mounded LPG storage vessels, two numbers of 70 kg
dry chemical type fire extinguishers shall be provided;

(ii) ALDS having above ground LPG storage vessels, hydrants with minimum water pressure
of 7 kg/cm2 shall be provided at convenient positions for all round coverage of storage
vessels and handling area, and water sprinklers with spray density of 10 lpm / m2 shall be
provided. The fire water pump shall be preferably diesel engine driven with capacity to
deliver water at the aforesaid rate and pressure. The minimum fire water storage at the
premises shall be that needed for fighting fire at least for one hour; and

(iii)Additionally, two numbers of 9 kg DCP fire extinguishers shall be provided near tank truck
unloading area and one number shall be provided near each dispenser and transfer pump
location.

4.0 OPERATING PROCEDURES:

4.1 General:

(i) Adequate training shall be imparted to the operators, service engineers and the persons
doing like jobs and records thereof shall be maintained;

(ii) Operating personnel of ALDS shall possess adequate knowledge and experience of
handling LPG to ensure functioning of the station in a safe and efficient manner;

(iii)During unloading of the product from the tank truck to the bulk storage vessels, the tank
truck shall be parked in the space marked for the purpose;

(iv) During the period of unloading of fuel from tank truck to the storage vessels, operation of
dispensing fuel to motor vehicles shall be suspended;

(v) During the period of unloading of LPG from tank truck to bulk storage vessel and also
while evacuating the storage vessel for maintenance, testing and like other operation all
dispensing, maintenance operations and like other operation at ALDS including that for
MS or HSD shall be suspended;

57
(vi) LPG shall be dispensed only into the fuel tank container of a motor vehicle duly approved
by the PESO;

(vii) LPG shall not be filled in the fuel tank of motor vehicle while the engine of the vehicle is
running;

(viii) The operating procedures shall be displayed at relevant locations for activating the ALDS,
unloading of tank truck, LPG dispensing and like other operation;

(ix) Dos and Don’ts shall be prominently displayed in ALDS;

(x) Safe ingress, fueling and egress of all vehicles shall be ensured;

(xi) System of periodic inspection and maintenance of ALDS facilities shall be established as
an integral part of operations;

(xii) Action in the event of emergency shall be clearly established and understood by all
concerned and displayed prominently;

(xiii) Important operational activities shall be logged and records of such activities highlighting
receipt, inventory, level, pressure, temperature, equipment running and like other operation
shall be maintained;

(xiv) All repairs, maintenance work and like other operation shall be carried out after issuance
of work permit by authorized person.

(xv) LPG unloading operations shall be carried out under the supervision of authorised person
of ALDS and TT crew;

(xvi) Limits of operating parameters including level, pressure and any other condition as set for
sound and safe operations shall not be exceeded. In case any abnormal operating conditions
are encountered, the causes shall be investigated and corrective actions be taken;

(xvii) The operating staff shall maintain vigilance for detection and control of any leakage at the
dispensing station; and

(xviii) During the operations, LPG leaks should be monitored with explosimeter.

4.2 Receipt of Bulk LPG at ALDS:

4.2.1 All Checks essential for ALDS safety as given against serial No.1.2 in annexure - III shall
be carried out for each tank truck before starting unloading at ALDS in the following
manner, namely:

(i) Bulk LPG at ALDS shall be unloaded preferably in non-peak hours;

(ii) Unloading of bulk T/T shall be carried out only at location as approved by PESO;

58
(iii) The unloading of LPG shall be done in presence of the authorised person at ALDS and TT
Crew;

(iv) Fire extinguishers (2 nos of 9 Kg DCP type) to be positioned as an immediate aid to


extinguish any fire except that of liquid LPG;

(v) Storage tank pressure, temperature and level shall be recorded. Crew or operating staff at
ALDS shall closely monitor unloading activities;

(vi) Tank truck shall be placed in drive out position;

(vii) After placement, engine master control switch shall be switched off, if applicable;

(viii) Minimum two wooden chokes shall be placed under wheels;

(ix) Chassis and LPG vessels are to be earthed independently for which bare metal cleats shall
be provided;

(x) Liquid and vapour hose shall be connected after examining integrity of joints using proper
studs and the bolts shall not to be used;

(xi) The main control panel and other panels shall be energized to activate automatic over fill
protection, emergency shut down systems, remote operated valves and compressed air
systems;

(xii) The readings of the level gauges provided on the tanks at ALDS shall be recorded;

(xiii) The tank trucks valves shall be crack opened and checked for leaks;

(xiv) LPG level in the storage tanks shall be monitored at regular intervals so that it does not
exceed 85 %; and

(xv) On completion of unloading operation, following activities shall be carried out in sequence,
namely: -

(a) Close the valves rigid liquid and vapour lines connected to the tank truck;

(b) The hose contents should be forced into the tank truck by controlled nitrogen
pressure. Alternatively, use loading arms or hoses with isolation valves at both ends.
Only vapours shall be vented through the vent;

(c) Isolate the valves at fill point;

(d) Remove hose connection and electrical-bonding wires;

(e) Cap the vapour or liquid outlet lines of the tank trucks;

(f) Remove chokes placed under the wheels; and

59
(g) Record the roto gauge, pressure gauge, temperature gauge readings and final readings
provided on the fixed gauging systems of the storage tanks at ALDS;

4.3 Storage of Bulk LPG:

Following shall be ensured for storage of LPG, namely: -

(i) Filling shall not exceed 85 % of the capacity;

(ii) The visible portion of vessels shall be inspected daily for any LPG leakage and
corrective action if required shall be taken;

(iii)All gauges like high-level alarm, level indicating devices, temperature and pressure
gauges shall be kept in operating conditions at all times and shall be checked daily;

(iv) Product gauging shall be done before commencement of dispensing operations and also
at the time of closing the operations of the ALDS every time; and

(v) Functioning of remote operated valves shall be checked prior to receiving of product
into the storage tanks.

4.3 Dispenser Operation:

(i) Ensure that the area is safe for refueling;

(ii) Guide the vehicle to the position at the designated area of the ALDS facing the direction
of exit;

(iii)Do not leave the vehicle unattended during refueling operation;

(iv) Ensure that sources of ignition, such as pilot lights, electrical ignition devices, electrical
appliances or gadgets, and engines located on the vehicle being refueled are turned off
before dispensing of LPG to a vehicle;

(v) Check for stamping of Road Transport Authority in the registration certificate of vehicle
prior to refueling;

(vi) The operator at ALDS shall satisfy himself before commencement of filling in the
vehicle in respect of following, namely: -

(a) The vehicle is fitted with only approved Conversion Kit and Auto LPG Tank with
standard fittings as per AIS 026 or equivalent;

(b) A “COMPLIANCE PLATE” is installed near the filling connection which is clearly
visible, displaying following information, namely: -

(A) Auto LPG Tank identification number;

(B) Date of installation;


60
(C) Water capacity (Litres) of total installation;

(D) Date of last retest;

(E) Vehicle Registration or Identification No.;

(F) LPG installation complies with the safety requirements of AIS 026; and

(G) Installed by (indicate the designation);

(c) That a green coloured label of size 80 mm x 80 mm with the text “LPG” is affixed
either close to the vehicle number plate or on left side of the wind screens;

(d) Check for the ‘Automatic Fill Limiter (AFL)’, which shuts off fuel supply to tank at
80 % of tank capacity, on the fill point of the Auto LPG Tank.

(e) LPG filling shall not be carried out for vehicles having Auto LPG Tank due for
retesting as per Gas Cylinder Rules, 1981. Ensure that the emergency shut-off valve
and the manual isolation valves are open on both delivering and return lines.

(vii) Set the dispenser meter at the quantity or value to be filled;

(viii) Position the fill nozzle on the vehicle container and couple securely;

(ix) Check that the vehicle fill connection is in sound condition in terms of tightness and leakage;

(x) Energize the system through push button and allow flow of LPG into the auto LPG Tank;

(xi) When using a filler nozzle with a nozzle bleed valve, open the valve to empty the nozzle
before disconnection;

(xii) Return the nozzle to correct position after the filling is over; and

(xiii) At the end of the day’s work, ensure that valves are closed, hoses are properly stowed and
electrical equipment is switched off.

Note: - Commissioning and de commissioning procedure for the ALDS is given in Annexure
- IV.

5.0 INSPECTION AND MAINTENANCE:

(i) A well-designed system of periodic inspection of all facilities of ALDS shall be formulated
to maintain it in safe operable condition all the time. Safety audit of the ALDS shall be
undertaken and certificate of fitness declaring integrity with respect to equipment,
facilities, operations and safety procedures shall be accordingly issued. Check list for
inspection is specified in Annexure -III;

(ii) All recommendations of the safety audit or inspections shall be complied in a time bound
manner and records maintained thereof;
61
(iii)Disassembly or removal of the facilities and components of equipment whilst any part of
the system is under pressure is hazardous and shall not be undertaken unless the system is
depressurised, gas freed and certified;

(iv) The system of permit to work shall be established for non-routine works in line with the
work permit issued by authorised person and such works shall be undertaken with full
knowledge and approval by authorised person for such purpose. The work permit shall be
in line with Annexure-vi (A) and vi (B) of Schedule – 1;

(v) Equipment appurtenances, protection devices associated with the dispensing unit as
incorporated in the design and approved by PESO shall be tested, maintained, repaired and
replaced as recommended by the manufacturer;

(vi) Checklist shall be in conformity with the design intention, operating and maintenance
procedures, preventive measure and protection systems and safety practices;

(vii) Preventive maintenance schedules shall be drawn for all equipment in accordance with
manufacturer’s recommendations and established mandatory or recommendatory
standards. Records of all preventive maintenance undertaken shall be maintained and
updated from time-to-time; and

(viii) Calibration of dispenser shall be carried out in line with statutory applicable.

6.0 TESTING OF RELIEF AND PROTECTION SYSTEM:

(i) All periodic tests shall be carried out by competent or authorised persons in this behalf, as
applicable and records shall be maintained;

(ii) For in house testing of safety relief valve, only properly built, testing facilities shall be
used;

(iii)After the calibration or re-calibration of the safety relief valve and excess flow check valve,
it shall be certified by competent person; and

(iv) A schedule for testing of Relief Valves and Protection System of various equipment shall
be developed. The checks shall be done as specified by manufacturer. The frequency of
testing shall be either as given below or as recommendation by manufacturer whichever is
of shorter period, namely: -

Equipment or Facility Frequency Agency


Safety Relief valve Once in a year Competent person
Thermal or Hydrostatic relief Once in a year Competent person
valve
Excess Flow Check Valve Once in a year Competent person
High Level Alarm of storage Once in 6 Competent or authorised person in
vessel months this behalf.
Remote Operated Valves Once in 6 Competent or authorised person in
months this behalf.
62
LPG Pump or Compressor Once in 6 Competent or authorised person in
Trips months this behalf.
Compressor Trips Once in a Competent or authorised person in
quarter this behalf.
Emergency Push Button Trips Once in a month Competent or authorised person in
this behalf.
Breakaway Coupling Once in 6 Authorised person in this behalf.
months
Cathodic Protection System Once in a year Authorised person in this behalf.
Piping Network Once in five Authorised person in this behalf.
years along with
tank testing
LPG Unloading Hoses Once in 4 Authorised person in this behalf.
months
Fire Extinguishers Once in 6 Authorised person in this behalf.
months
Dispensing hoses Once in 6 Authorised person in this behalf.
months

7.0 SAFETY INSPECTIONS and AUDIT:

The safety inspections or audit of ALDS shall be carried out as given below:

TYPE FREQUEMCY AGENCY


General Inspection Daily Operating personnel
Twice in a quarter Authorised personnel of
marketing company
Safety Audit Once in a year Authorised Person in this
behalf
Electrical Audit Once in three years Licensed Electrical agency

Note: - The comprehensive checklist shall be developed in line with the similar checklists
provided in Schedule – 1.

8.0 EMERGENCY PLAN AND PROCEDURE:

(i) A comprehensive ERDMP shall be developed in accordance to the Petroleum and Natural
Gas Regulatory Board (Codes of Practices for Emergency Response and Disaster
Management Plan (ERDMP)) Regulations, 2010. The copies of the ERDMP shall be
available to all personnel in the Auto LPG Dispensing Station;

(ii) The entity having control over the ALDS shall draw an operational emergency plan
keeping in view the following, namely: -

63
(a) Loss of, or interruption to, the gas supplies due to leaks or failure of pipeline;

(b) Major failure of LPG fittings;

(c) Accidents or other emergencies, which can affect the ALDS;

(d) Civil emergencies;

(e) Any other risk arising from the existence or operation of the ALDS;

and such emergency plan shall be disseminated amongst all personnel involved
insuring that they understand their roles and responsibilities in the event of an
emergency.

(iii)Each ALDS shall be provided with at least 3 shut down devices located in convenient
locations near storage vessels, dispenser and office/ sales room;

(iv) The in-charge of the ALDS shall maintain close liaison with Fire Service, Police, District
Authorities and LPG marketing company;

(v) Important telephone numbers for emergency use shall be displayed prominently in the
ALDS and

(vi) Means of communication shall be always at the disposal of the In-charge of the ALDS.

9.0 COMPETENCE ASSURANCE AND ASSESSMENT:

(i) The objective is to provide good understanding of all the facets of dispensing activities
including operations, procedures, maintenance and hazards of LPG and the risks associated
with its handling. Training shall ensure that the jobs are performed in accordance with the
laid down procedures and practices;

(ii) Every entity shall develop, implement, and maintain a written training plan to instruct all
ALDS with respect to the following, namely: -

(a) Carrying out the emergency procedures that relate to their duties at the ALDS as set
out in the procedure manual and providing first aid;

(b) Permanent maintenance, operating, and supervisory personnel with respect to the
following, namely: -

(i) The basic operations carried out at the ALDS;

(ii) The characteristics and potential hazards of ALDS and other hazardous fluids
involved in operating and maintaining the ALDS, including the serious danger from
frostbite that can result upon contact with POL products including LPG;

(iii) The methods of carrying out their duties of maintaining and operating the ALDS as
set out in the manual of operating, maintenance and transfer procedures;
64
(iv) Fire prevention, including familiarization with the fire control plan of the ALDS;
fire fighting; the potential causes of fire or accident in ALDS; the types, sizes, and
likely consequences of a fire/ accident at ALDS;

(v) Recognizing situations when it is necessary for the person to obtain assistance in
order to maintain the security of the Petroleum Retail Outlet;

(iii)Training shall be imparted by competent personnel to the staff attached with the LPG
dispensing station at the time of induction, which is to be followed up by periodic refresher
courses. The training programme shall inter alia cover following aspects, namely: -

(a) Hazardous characteristics of LPG;

(b) Familiarisation with operational procedures and practices;

(c) Commissioning of new facilities and equipment;

(d) Hands on experience on operation of equipment;

(e) Routine checks and maintenance activities of the facilities;

(ii) Knowledge of emergency and manual shut down systems shall inter alia cover following
aspects, namely: -

(a) Immediate and effective isolation of any LPG leak;

(b) Accounting of product;

(c) Safety regulations and accident prevention;

(d) Fire fighting facilities, its upkeep and operation;

(e) Evacuation and safe egress of the vehicles in an emergency;

(f) Housekeeping;

(g) Safety in transportation of LPG;

(h) First aid; and

(i) Emergency plan. or drills; and

(iii) Proper records for the training and refresher courses shall be maintained at the installation.

65
10.0 CUSTOMER SAFETY AND AWARENESS:

10.1 Display of important information:

At ALDS, the particulars of licence, emergency telephone nos. of local fire service, police,
LPG marketing company and emergency instructions shall be conspicuously displayed in
the following manner, namely: -

(i) Caution boards shall be displayed near the dispenser for customer awareness as below,
namely: -

(a) Stop the engine before refueling;

(b) No smoking;

(c) No flames or pilot lights or use of electrical gadgets;

(d) Avoid contact with liquid LPG;

(e) Do not fill LPG beyond 80 % capacity; and

(f) Keep distance from vehicle being fueled.

(ii) A display board shall be prominently placed at ALDS for the benefit of the Customer
highlighting behavioral characteristics of LPG in bilingual i.e. Hindi or English and local
language as below, namely: -

(a) Auto LPG is stored and delivered as a liquid under pressure;

(b) While changing from liquid to gas, LPG expands approximately 260 times its original
volume;

(c) Leakage of liquid LPG is more dangerous than gaseous LPG and it has distinct odour;
and

(d) LPG vapour is approximately 1.5 times heavier than air, LPG vapour tends to settle
down.

10.2 DOs & DON’Ts:

DON’Ts:

(i) Do not start the engine or drive away the vehicle till the filling nozzle has been
disconnected from the filler cap of the vehicle;

66
(ii) Do not refuel the vehicle during the period LPG is being decanted the storage vessel;

(iii) Do not handle LPG without protective hand gloves and safety glasses; and

(iv) Do not fill in the Auto LPG Tank which is overdue for pressure retesting.

Dos:

(i) Switch off the mobile phone at the ALDS;

(ii) Switch off the engine before commencement of refueling of Auto LPG;

(iii) Check vehicle tank spout valve and its rubber seal;

(iv) Squeeze trigger fully and hold;

(v) Ensure a 9 kg DCP Fire Extinguisher is available near the LPG Dispenser;

(vi) Connect Nozzle to avoid cross threading; and

(vii) In case of any leakage or fire observed, press the “EMERGENCY STOP” button on
the LPG Dispenser.

11.0 List of Standards or Guidelines referred to in Schedule 2 shall be as given in Annexure V.

VANDANA SHARMA, Secy.

[ADVT.-III/4/Exty./365/18]

67
ANNEXURE- I

68
ANNEXURE - II

69
Annexure - III

INSPECTION OF THE AUTO LPG DISPENSING STATION

S. ITEMS OBSERVATIO Remarks/


No NS Recommendations

(State details)

1.0 CHECKLIST:

1.1 Bulk Storage Area:

Condition of earthing of vessels.

Functioning of level instruments.

Safety valves regularly tested and records


maintained.

Functioning of level gauge and high-level


alarm.

Any sign of leakage or corrosion.

Positioning of fire extinguishers.

Fence around storage vessel is 2 m high

Conditions, functioning and coverage of


sprinkler or hydrant system.

No simultaneous unloading of LPG and other


fuel

Illumination level adequate.

Condition of cathodic protection system,


current, potential

Storage area is properly paved

No vegetation in the area

70
No unauthorised structure up to the property
line

Housekeeping.

1.2 Tank lorry unloading:

Approved spark arrestor fitted with the tank


lorries.

Proper earthing connections and earth pit


resistance.

Any visible sign of LPG leakage.

All flanges completely bolted

Only metallic gaskets in use

Bolts and nuts protected against corrosion

Electrical resistance within limits

PESO license for the vehicle.

Hose test certificate available

2 nos. of fire extinguishers in the vehicle.

Tool kit available

First aid box available

Flange connections having bonding.

Safety instruction booklet or TREM Card


available.

Wheel choke used while unloading.

Portable extinguisher positioned and functional

Tank lorry in drive out position

Illumination level adequate.

Housekeeping in order.

71
1.3 Dispensing pump:

Leakage from pump seals.

Lubrication effective.

Flameproof fittings and junction box.

Earthing connections proper.

Alarms and trips functioning.

ROV’s can be actuated from remote location

Telephone in sales room

Safety guards in position.

Abnormal vibration or excessive noise.

Portable fire extinguishers in position.

Signs of visible leakage.

Vent and drains with double block valves and


without leakage.

Housekeeping in order.

Ignition source in the surrounding.

1.4 Dispensing Unit:

Effective arrangement to protect against


collision damage.

EFCV and breakaway coupling provided and


are functional/ test report available.

Filling hose is tested, test report available and


due date is marked.

Fueling nozzle is of self-sealing type.

Leakage from nozzle is within 5 ml and is


certified or tested

72
Filling operation cannot be started unless the
system is properly earth.

Filling nozzle is in lockable position

Filling nozzle capped when not in use

No fugitive emission while disconnecting the


nozzle.

Dispenser is equipped with a device for


emergency shutdown of entire dispensing unit.

All valves, meeting equipment, vapour


eliminator and other equipment installed on the
dispenser is duly recognised by a CCOE or
testing laboratory.

Cut off valve of the dispenser is in closed


position when the dispenser is not activated.

Pull away device (Break away coupling)


provided in transfer hose and is functional.

Means provided to prevent LP gas from being


discharged unless the nozzle is connected to
the vehicle.

The fueling nozzle is provided with a swivel


inlet connection (360 deg.)

Electrical components suitable for class I,


group D, division – I applications.

1.5 Electrical System:

Transformer in conformity with area


classification.

Area classification duly approved by CCOE


available.

Alarm and trip circuit functioning.

No temporary electrical connection.

Condition of cable duct and wiring good.


73
Rubber mats with ISI mark.

Fuse are of proper type and rating.

Fire extinguishers are in proper working


condition.

Motors provided with double independent


earthing connection.

Flame proof ness of terminal box, fitting and


junction boxes maintained and certificates
available.

Earthing pit condition good.

Push buttons earthed properly and flameproof


conditions not tampered.

Ground resistance at motor or push button


measured and found satisfactory.

Water accumulation in lighting fixture


distribution box.

Lighting fixture flameproof and as per area


classification.

LPG pipelines with jumper for electrical


continuity.

Condition of grounding electrode.

Area classification duly approved by CCOE


available.

Records of electrical testing checks maintained


up-to-date.

74
Annexure - IV

Commissioning & Decommissioning Procedures

1.0 General:

(i) The commissioning or de-commissioning operations shall be carried out by well trained
and experienced personnel;

(ii) The commissioning or de-commissioning operations shall be preferably during daytime.


Such operations shall be done when traffic in the vicinity is minimum;

(iii) Caution boards shall be displayed while venting is in progress

(iv) The surrounding area shall be cordoned off and the gas level shall be monitored closely
using explosimeter and

(v) Fire fighting facilities shall be kept ready.

2.0 Commissioning, purging and charging of new vessels:

Pre-commissioning inspection and certification by the competent authority shall be


obtained prior to initiating the activities specified in paragraph 3.0 to 6.0

3.0 Water or Nitrogen filling:

(i) All gaskets shall be changed after hydrotest;

(ii) The LPG system shall be first filled with clean water or Nitrogen. This will assist
displacement of air followed by replacement of water or Nitrogen by introducing vapour
LPG. Liquid LPG should not be introduced under any circumstances for purging the vessels;

(iii) At the time of filling water or Nitrogen, air shall be released from vent points;

(iv) At this stage the system shall be checked thoroughly for leak-proof ness;

(v) The complete leak testing during commissioning at 10 % above the working pressure but not
exceeding design pressure of the vessel, shall be a proof test over and above the hydro test
undertaken for various equipment and facilities at earlier stage. This will ensure leak proof
ness of the system as a whole before gas charging;

(vi) Particular attention shall be given with respect to the fittings, connections and joints of the
storage vessel. In case of any leakage is found the vessel shall be depressurised and water or
Nitrogen drained or removed for taking corrective action; and

75
(vii) Gasket shall be checked and replaced in case any flange joint is found leaking during leak
testing.

4.0 Gas charging:

(i) Liquid or vapour LPG shall not be directly used for displacement of air in storage vessels
since the system is likely to contain a flammable mixture for a period of time, which shall
be ultimately vented to the atmosphere;

(ii) Gas shall be charged only after ensuring elimination or absence of oxygen;

(iii) Vapour from LPG tank lorry shall be used for gas charging, taking due precaution that
temperature of the contents does not drop substantially;

(iv) While charging gas, water or nitrogen shall be drained simultaneously maintaining a positive
pressure of around 1-2 kg/sq.cm. in the vessel;

(v) Pressure in the storage system shall be monitored and creation of vacuum condition to be
prevented;

(vi) At the time of draining of water, it shall be ensured that no pockets of water remain in the
system;

(vii) Where water draining is resorted to, by opening of end flanges of headers or lines, such
flanges shall be blinded at the end of draining operation;

(viii) In case of displacement of Nitrogen with LPG vapour, constant readings of LPG air mixture
should be taken with explosimeter to ascertain the displacement of Nitrogen with LPG
vapours;

(ix) Functioning of the level gauges, high level alarm and their correctness shall be checked at
the time of water filling and gas charging; and

(x) Provision shall be made for proper drainage of water from vessels, pipe lines and equipment.
In case of Nitrogen displacement, controlled venting should be done from pipelines and
equipment to ascertain Nitrogen displacement with LPG. Explosimeter reading shall also
be taken to check the concentration levels.

5.0 Liquid charging:

(i) Liquid LPG shall be introduced at a controlled rate after displacement of entire water or
Nitrogen with vapour LPG;

(ii) The commissioning operations shall be controlled and supervised by authorised personnel
in this behalf; and.

(iii) Fire fighting system shall be kept in readiness.

76
6.0 Commissioning of Dispensing unit:

(i) For commissioning of dispenser unit, liquid LPG shall not be charged and displacement of
air shall be carried out by introducing vapour LPG from the storage vessel and venting under
controlled conditions with due safety precautions;

(ii) Water charging during pressure testing shall be limited up to the inlet of the dispenser so that
internals appurtenances, instruments, metering element and all other accessories are not
affected, but, there are no restrictions if Nitrogen is used for purging; and

(iii) Manufacturer’s recommendations shall be followed while commissioning the dispensing


unit.

7.0 Decommissioning and Gas Freeing of Storage Tanks:

(i) Water or Nitrogen shall be used for gas freeing adopting procedures similar to water or
Nitrogen filling and gas charging during commissioning;

(ii) For decommissioning of storage vessels, liquid shall be first exhausted using pumps or
compressors followed by displacement of gas by water or Nitrogen;

(iii) The liquid LPG can be transferred to the adjacent tank or a road tanker;

(iv) In case compressor is available, pressure in the system shall be reduced by recovering
vapour from the storage vessel and transferring to another vessel if the layout of the system
so permits;

(v) While introducing water or Nitrogen, residual vapour in the storage vessel shall be released
at controlled rate by venting through cold flare; and

(vi) Check that the vessel is gas free with explosimeter.

77
Annexure – V

REFERENCES

(i) Regulation for LPG Service and Road Tank Trucks in the Netherland, 1987.

(ii) Code of Practice 11: Recommendations for the safe handling of LPG used as an internal
combustion engine fuel for motor vehicles (LPG ITA).

(iii) AS/NZS 1596:1997: Storage of Handling of LP Gas.

(iv) AIS 026 D1 : The use of LPG Fuel in Internal Combustion Engine to Power 4-
Wheeled Vehicles.

(v) IS:2825 : Code for Unfired Pressure Vessels.

(vi) IS:5571 : Guide for Selection of Electrical Equipment for Hazardous Area.

(vii) IS:5572 : Classification of Hazardous Areas (other than mines) having


Flammable Gases and Vapours for Electrical Installations.

(viii) IS:14861 : BIS Specification of LPG for automotive purposes.

(ix) IS:14899 : Liquefied Petroleum Gas containers for automotive use – Specification.

(x) The Static and Mobile Pressure Vessels (Unfired) Rules-1981.

(xi) LPG (Regulation of use in Motor Vehicles) Order, 2001.

(xii) Gas Cylinder Rules, 2004.

(xiii) API Standard 25 – Design and Construction of LP Gas Installations;

(xiv) ASME Boiler and Pressure Vessel Code Sect. VIII Division 1 American Society of Mech.
Engrs., New York.

(xv) NFPA 58 : Storage and Handling of Liquefied Petroleum Gases.

(xvi) NEPA 59 : LP Gases at Utility Gas Plants.

(xvii) ASME B - 31.3 : Chemical Plant and Petroleum Refinery Piping.

(xviii) PD-5500 : Specification for unfired fusion welded pressure vessels.

78