First Floor Lighting Layout Second Floor Lighting Layout: Schematic Diagram

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SCHEDULE OF LOADS

CIRCUIT PROTECTION/ CIRCUIT BRANCH CIRCUIT CONDUIT


CIRCUIT LIGHTING LOAD VOLT- WIRES (mm³ THHN) (PVC)
C.O. VOLT (V) LOAD DESCRIPTION AMPERES BREAKER
NUMBER SW LO AMPERES FRAME POLE TRIP (AMP) LINE GROUND (mmØ)
S2 S3
S2 S2 1 10 18 - 230 LIGHTING OUTLET @ 100VA 1800 7.82 60 1-P 20A 2 - 3.5 - 20

S1 S1
2 - - 13 230 DUPLEX CONVENIENCE OUTLET 4680 20.35 60 1-P 20A 2 - 3.5 1 - 35 20

S1 S2
3 - - 1 230 ONE (1) AIR CONDITION UNIT 1500 6.52 60 1-P 20A 2 - 3.5 1 - 35 20
S2 S1
4 - - 2 230 REF / SMALL APPLIANCE LOAD 1500 6.52 60 1-P 20A 2 - 3.5 1 - 35 20
5 - - 1 230 LAUNDRY LOAD 1500 6.52 60 1-P 20A 2 - 3.5 1 - 35 20
6 - - 1 230 SPARE 1500 6.52 60 1-P 20A 2 - 3.5 1 - 35 20

TOTAL LOAD IN THE BUILDING 54.25


ROOF LINE 1 ROOF LINE 1

LOAD ANALYSIS/ COMPUTATIONS FLOURESCENT LAMP


NOTE: 2P is permitted that the Circuit Breaker opens all the conductors
of the circuit, including the grounded conductor, and is so designed that no CFL LAMP
1. TOTAL LOAD FOR PANEL BOARD: pole can operate independently. DUPLEX UNIVERSAL OUTLET
a. LIGHTING LOAD = 1800 VA WITH GROUND
b. CONVENIENCE RECEPTACLE LOAD = 4680 VA
FIRST FLOOR SECOND FLOOR c.
d.
LAUNDRY LOAD
SMALL APPLIANCE LOAD
= 1500 VA
= 1500 VA
FEEDER CONDUCTORS:
It = (6768 x 125%) / 230V
SERVICE ENTRANCE

1 LIGHTING LAYOUT 2 LIGHTING LAYOUT SUB TOTAL

2. APPLICATION OF DEMAND FACTOR:


= 9480 VA
It = 36.78 AMPERES GROUND

E 1 SCALE 1:100m E 1 SCALE 1:100m FIRST 3000 VA @ 100% D.F. = 3000 VA


USE:2-14.0mm² THW Cu.wires (65A/55A @ 60°C) in 32 mm dia. PVC Pipe
REMAINDER @ 35% D.F. = 2268 VA CIRCUIT HOMERUN
1-8.0mm² THW Cu.wires as Grounding Electrical conductor
(6480 VA x 0.35) (NUMBER INSIDE CIRCLE
1 INDICATES CIRCUIT
NUMBER)
3. OTHER LOADS:
a. AIR CONDITION UNIT = 1500 VA SUB-SERVICE EQUIPMENT:
LIGHTING AND POWER PANEL

USE: ONE 60AT/100AF, 1P, 240V CIRCUIT BREAKER, 10KAIC, M KILOWATT HOUR METER
TOTAL NET COMPUTED = 6768 VA Bolt-On
5
S1 FLUSH TYPE WALL ONE GANG SWITCH
S2 FLUSH TYPE WALL TWO GANG SWITCH

2 2 S3 FLUSH TYPE WALL THREE GANG SWITCH


M USE 2- 14MM² & 1-5.5MM²
THHN Cu WIRE IN 40 MM
Ø RSC OR PVC PIPE
4 TO SOURCE 230V, 1Ø, 60Hz AC
2W LINE TO GROUND
GENERAL NOTE AND SPECIFICATION
1. ALL ELECTRICAL INSTALLATIONS SHALL BE DONE IN ACCORDANCE WITH THE
PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE AND
THE RULES AND REGULATION OF THE GOVERNMENT AUTHORITIES CONCERN IN
THE ENFORCEMENT OF LAWS AND ORDINANCE.
60AT
2. POWER SERVICE SHALL BE 230 VOLTS AC SINGLE PHASE 60 HERTZ SYSTEM.
3. ALL MATERIALS AND EQUIPMENTS TO BE USED SHALL BE BRAND NEW AND OF
1 20A 20A 2 APPROVED TYPE FOR BOTH PURPOSE AND LOCATION IT IS INTENDED.
3 4. FOLLOWING MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
3 20A 20A 4 CONVINIENCE OUTLETS------------0.30M ABOVE FINISH FLOOR LINE
LIGHTING SWITCHES-----------------1.40M ABOVE FINISH FLOOR LINE
PANEL BOARD---------------------------1.35M ABOVE FINISH FLOOR LINE AT CENTER
5 20A 20A 6 5. ALL WIRINGS ON CONCRETE SHELTER MUST BE EMBEDDED IN THE WALL
6. PANEL BOX USED SHALL BE IN NEMA 3R ENCLOSURE.
1-8.0 MM² THN Cu WIRE
ROOF LINE ROOF LINE FOR GROUND 7. ALL ELECTRICAL WORKS HERIN SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER OR A REGISTERED
MASTER ELECTRICIAN.
8. ADEQUATE AND EFFECTIVE GROUNDING SHALL BE PROVIDED TO THE SYSTEM.
9. RECEPTACLE OUTLETS SHALL BE INSTALLED SO THAT NO POINT ALONG THE
FLOOR LINE IN ANY WALL SPACE IS MORE THAN 1800MM MEASURED
GROUNDING HORIZONTALLY FROM ANY OUTLET IN THAT SPACE 600MM OR MORE IN WIDTH.
ELECTRODE
SYSTEM 10. FOR EACH SPARE CIRCUIT IN PANEL BOARD, PROVIDE AN EMPTY CONDUIT
20MMØ TERMINATING TO A COVERED SQUARE BOX.

FIRST FLOOR SECOND FLOOR SCHEMATIC


3 POWER LAYOUT 4 POWER LAYOUT 1 DIAGRAM
E 1 SCALE 1:100m E 1 SCALE 1:100m E 3 NOT TO SCALE

PROJECT OWNER : PROJECT TITLE : SHEET CONTENT : SHEET NO.

1
PRC NO.:

VALIDITY:

PLACE:
ELECTRICAL ENGINEER

PTR NO.:

DATE:

TIN:
PROJECT LOCATION : CONSTRUCTION OF TWO (2) STOREY RESIDENTIAL HOUSE AS SHOWN
1 ELECTRICAL