QA PROCEDURES
.Doc. No UMC-QHSE-QA-AU/04
Issue/ Rev 02/01
AUDIT PROCEDURE
Date 01/03/2020
Department job description availability and available at the point of use but OFI
understanding. needs to be updated according to
the 2023 plan.
Awareness of QHSE policy. Good awareness and available in
the form of solid copy.
Scope of CIC process. Extracting the gold from the
agglomerated Ore to gold bullion
Tour around CIC plant. All the unit operations are working
according to the process
procedure and the plant
descriptions at the point of use in
the form of hard copy.
Audit trails Below are samples for 1/2/2023 & OFI
4/10/2022
Stripping Log sheet
Material balance sheet
Cyanide consumption
All required information needed by
the procedure was available in the
place. housekeeping and electrical
safety need to be considered for
overall CIC sections
Intersections with Other parties CIC operating procedure at the OFI
point of use UMC-PD-QP-CIC –
issue date 1/1/02020 - Issue/Rev.
02/00 must define all intersections
with another department in the
procedure such as Metallurgy and
Chemical Lab and Crusher and
Material Stores section.
Measurement Devices list and Calibration There are no list available and the NC
certificate. following devices such as AAS,
flowmeter, pH meter, sensitive
balance, automatic cyanide ppm
calibration device not calibrated.
All instruments need calibration.
CIC process KPIs. The daily and monthly KPIs report OFI
Auditor Eng. Abutalib Adam Abdallah Signature Date 17/2/2023