List of All ARAMCO Standards PDF - PDF
List of All ARAMCO Standards PDF - PDF
List of All ARAMCO Standards PDF - PDF
Standards…
PDF
Original Title: List of all ARAMCO
standards.pdf
Active_Doc_List
Uploaded by Freckland on Jul 13,
salman1111a
2019
Full description
) " # $
Save 100% 0% Embed
% &
Share Print
SA STD INDEX
aneelbaig
Download now 1 of 239 ' Search document (
SAES-L-136
Abdul
List of Active Engineering Standards Documents Due Ahad
Date Lone
(March 31 2013)
List of attchement
Gate Valves, Through Conduit Type, API kbpatel123 11-OCT-10
04-SAMSS-050 SPEC 6D Valves
04-SAMSS-051 Ball Valves, API SPEC 6D Valves 11-OCT-10
04-SAMSS-052 Ball Valves, API SPEC 6A Valves 11-OCT-10
Steel Lubricated Plug Valves - Flanged and 11-OCT-10
04-SAMSS-053 Welding End Valves
04-SAMSS-054 General Requirements for Chokes Valves 11-OCT-10
05-SAMSS-002 Automatic Electric Water Heaters Plumbing and Utilities 21-JUN-11
Selection and Qualification of Elastomeric 03-MAR-13
06-SAMSS-001 Sealing Materials and Manufacturers Non-Metallic
Pressure Preservative Treatment for Wood 21-JUN-11
09-SAMSS-002 Piles, Timbers and Ties
Qualification Requirements for Alkyd
01-SAMSS-010
Onshore Structures
22-JUN-11
09-SAMSS-021 Enamel Coating System (APCS-6) PaintsJeck Maquited
and Coatings
22-JUN-11
Qualification Requirements for Conversion
09-SAMSS-030 Coating/Alkyd Coating System (APCS-7) Paints and Coatings
24-OCT-12
Qualification Requirements for Aluminum-
09-SAMSS-035 Pigmented Alkyd Coating System (APCS-4) Paints and Coatings
09-SAMSS-060 Packaging Requirements for Coatings Paints and Coatings 24-OCT-12
Qualification Requirements for Internal 13-JUL-11
Coating Systems Used in Immersion
09-SAMSS-067 Services Paints and Coatings
Qualification Requirements for Coal Tar
Epoxy in Buried or Immersion Services
01-SAMSS-010.pdf 13-JUL-11
09-SAMSS-089 Shop-Applied
Epoxy CoatingExternal
for SteelFusion Bonded
Line Pipes Paints and Coatings 25-OCT-11
Shop-Applied Extruded P.E. External 27-MAR-12
09-SAMSS-090 Coating System for Line Pipe Paints and Coatings
Qualification Requirements for Shop- 15-OCT-11
09-SAMSS-091 Applied Internal FBE Coatings Paints and Coatings
09-SAMSS-093 Scaffold Plank Onshore Structures 15-MAR-11
09-SAMSS-097 Ready-Mixed Portland Cement Concrete Civil 19-DEC-10
09-SAMSS-098 Precast Concrete Fence Posts Civil 11-OCT-11
01-SAMSS-010
doyenofcastle
SAES-L-136
kartik_harwani4387
Qualification Requirements for Stand Alone 11-OCT-11
Self-Priming Epoxy Mastic Coatings
including Top Coating with Aliphatic
09-SAMSS-101 Polyurethane Paints and Coatings
Qualification Requirements for High 22-MAY-11
Temperature External Coatings in
Atmospheric Services (APCS-11A) and
09-SAMSS-103 (APCS-11B) Paints and Coatings
09-SAMSS-106 Epoxy Coating of Steel Reinforcing Bars Paints and Coatings 27-MAR-12
22-MAY-11
Qualification Requirements and Application
of Composite Fluropolymer/Ceramic
SAEP-352.pdf
09-SAMSS-107 Coatings to Fasteners PaintsRami Elloumi
and Coatings
The Requirements of External Liquid 11-JUN-11
Coatings for Buried Pipelines and Piping
09-SAMSS-113 (APCS-113A) Paints and Coatings
Shop-Applied Extruded, Three-Layer 22-MAY-11
Polypropylene External Coatings for Line
09-SAMSS-114 Pipe Paints and Coatings
12-SAIP-50 Use of Metal Studs in Buildings Inspection Engineering 18-APR-09
12-SAMSS-005 Marking of Metal Products Materials and Corrosion Control 07-MAY-11
Fabrication of Structural and Miscellaneous 17-MAY-11
12-SAMSS-007 Steel Onshore Structures
12-SAMSS-008
Erection of Structural and Miscellaneous
Steel
SAEP-352 , 01.01.2018.pdf
Onshore Structures
09-MAY-11
14-SAMSS-536 Transformers
Material, Manufacture and Preservative Electrical Systems
Electrical Substations Equipment
Designs and 20-OCT-08
14-SAMSS-600 Treatment of Wood Poles Automation
Material, Manufacture and Preservative Electrical Systems Designs and 19-OCT-08
14-SAMSS-602 Treatment of Wood Crossarms Automation
19-OCT-08
Octagonal Steel Poles for Overhead Electrical Systems Designs and
14-SAMSS-603 Distribution Systems - Crossarm Structures Automation
02-SAMSS-012 (Weld
Overlay Fitting, Flanges
Inspection Procedure for Conduit and and Spool Pieces) 18-APR-09
15-SAIP-50 Cable Seals Inspection Engineering
Inspection Procedure for PVC Coated Rigid ALI 18-APR-09
15-SAIP-51 Steel Conduit Inspection Engineering
Medium Voltage Power Cable 5 kV t hrough Electrical Systems Designs and 04-DEC-12
15-SAMSS-502 35 kV Automation
15-SAMSS-502 35
You're Reading a Preview
Medium Voltage Power Cable 5 kV t hrough Electrical Systems Designs and 04-DEC-12
16-SAMSS-510
16-SAMSS-512 utikV
Manually
S
Ow tdcohogreS
aOperated
wr: i1 krVactokPad
tch 3- 6LokMounted
V VoltageSF6
w EAutomation
lecttrrical Substta
ations Equipm
meent 22-MAY-12
29-NOV-11
Electrical Systems Designs and 06-FEB-11
16-SAMSS-513 Power System Upload
Automatyour ion Comp documents
onents to download.
Automation 02-SAMSS-012 (Weld
15-SAMSS-503 kV
Submarine Power Cable 69 5 kVkVthrthrough
ough 35 230 Electrical
Automation
Electrical Systems
Systems Designs Designs and and 10-NOV-12
16-JUL-12
15-SAMSS-504
16-SAMSS-514 kVControl and Protective Relay Panel - Indoor Automation Automation Overlay Fitting, Flanges
16-SAIP-11 Mediumand andFabrication
High Voltagofe High OR
Oil SResistance
witches Inspection Engineering 18-APR-09
16-SAMSS-515
Design
Metal-Enclosed,
G rounding System Metal-Clad
s Low-Voltage and Spool Pieces) 14-OCT-08
Electrical Substations Equipment 08-AUG-10
16-SAMSS-502
16-SAMSS-503
SAdjustable
witchgear A
InnddoA orbo
Become a Scribd member for fulljunaid access.
ssembliesDrive System - 1 kV Electrical Substations Equipment
Frequency
Cvoentrolgear - Low Voltage Eloetcotrrsica
Shah Your 02-JUN-12
16-SAMSS-517 a M alnSd uGbesntaetrio antosrsEquipm ent 30-OCT-12
16
16--S
SAM
AMSS
SS-504
-518 In
Lodow or VoMe ltagtale -Cl
Paad nelS bowi rdfirst
atch sgear:30 1 todays
38 kVareE
Elfree.
leeccttri
ricca all S
Suubbssttat
atiio onnssE Eq
quuiip
pmmen
entt 22-MAY-12
01-OCT-11
16
16--S
SAMS
AM S-5
SS 06
-519 IIn
nddooo orr CSw onitc
tro
hblgoeaardr -- HLiogwhVVoolltta
ag
gee Elle
E ecctr
triiccaall S
Suubbssta
tattiio onnssE Eq
quuiip
pme
menntt 27-SEP-11
16-SAMSS-507 High Voltage Motor Controller - Outdoor Electrical Substations Equipment 21-FEB-11
SF6 Gas Insulated Circuit Breakers, 31-JUL-10
16-SAMSS-508
16-SAMSS-520 O Ca ubl
Indoor tdebooAutomatic
r - 34.5 kVTransfer
us throughContinue
230 kV- Lowfor Free
Switch EAutomation
lectrical Systems
Electrical SubstatioDesigns ns Equipand ment 19-OCT-08
22-MAY-12
12-NOV-08
16-SAMSS-521 Voltage Electrical Substations Equipment
Retrofit/Replacement Vacuum Circuit Check Vatves, Swing 10-APR-11 Type
16-SAMSS-510
16-SAMSS-512 Manually
SOw utitdcohogreS
Breakers aOperated
r: i1
w tch
Applied krVactin
okPad
3- 6Lo
IndoorkMounted
V VMetal-Clad
w oltageSF6 Electtrrical Substta ations Equipm ent 29-NOV-11
me 22-MAY-12
16-SAMSS-522 Switchgear: 1 to 38 kV ElectriHassan
Electrical cal Systems
Substa Mokhtar
tioDesigns
ns Equipand ment 06-FEB-11
16-SAMSS-513 Pow er S ys tem Aut omat
Materials System Specification for Metal ion Comp one nts Automation 10-OCT-11
Enclosed Isolated Phase Bus ¿ Indoor and Electrical Systems Designs and 16-JUL-12
16-SAMSS-514
16-SAMSS-523 OCon utdtrol
oorand Protective Relay Panel - Indoor EAutomation lectrical Substations Equipment
Design andCoverage
Inspection Fabrication of High Resistance
of Cathodic Protection 14-OCT-08
18-APR-09
16-SAMSS-515
17-SAIP-50 G r o u n d
Deep Anode Beds i n g S y s t em s E l ec t r i c a l S u
Inspection Engineering b s t a t i on s E qu i pm en t
Adjustable Frequency Drive System - 1 kV 02-JUN-12
16-SAMSS-517 and Above Motors and Generators
16-SAMSS-518 Low Voltage Panelboards Electrical Substations Equipment 01-OCT-11
16-SAMSS-519
17-SAMSS-004 ICathodic
nrdooteocr tS
Conventional iow itchb
Transformer/Rectifiers
P oardAdjustable)
nProtection
(Tap -Phase
LoforwV o l ta
Cathodicg e
Controlled Elaetchtr
C oidciacl P Sruobte
sctatitoionns Equipment 15-AUG-12
28-DEC-11
17-SAMSS-005 Rectifiers Cathodic Protection
17-SAMSS-006 Galvanic Anodes for Cathodic Protection Cathod SAEP-385_Oct
ic Protection 2017.PDF 28-FEB-10
16-SAMSS-520 CablebAutomatic
Indoor us Electrical
Automation Systems Designs and 22-MAY-12
19-OCT-08
Impressed CurrentTransfer
AnodesSwitch - Low
for Cathodic 12-NOV-08
31-DEC-11
16-SAMSS-521
17-SAMSS-007 Vroolttaegce
P tion E
ClaetchtoridAllan SruobLindo
ciacl P stcatitoionns Equipment
te
Retrofit/Replacement Vacuum Circuit 10-APR-11
Breakers Applied in Indoor Metal-Clad
16-SAMSS-522 Switchgear: 1 to 38 kV Electrical Substations Equipment
Materials System Specification for Metal 10-OCT-11
Enclosed Isolated Phase Bus ¿ Indoor and
16-SAMSS-523 Outdoor Electrical Substations Equipment
Inspection Coverage of Cathodic Protection 18-APR-09
17-SAIP-50 Deep Anode Beds Inspection Engineering
17-SAMSS-004 Conventional
Transformer/Rectifiers
ProtectionProtection
Cathodic (Tap Adjustable)
for Cathodic
Phase Controlled Cathodic Protection 15-AUG-12
28-DEC-11
17-SAMSS-005 Rectifiers Cathodic Protection
17-SAMSS-006 Galvanic Anodes for Cathodic Protection Cathodic Protection 28-FEB-10
Impressed Current Anodes for Cathodic 31-DEC-11
17-SAMSS-007 Protection Cathodic Protection
34-SAMSS-119 Bi-
Directional Meter
Prover.pdf
fraihafraiha
01-samss-010
Fortunato Seguban
SAES-S-050
abhi lash
Inspection References
Hand Book-2
aboalhassan
Internal_Durability_Repor
t
Freckland
External_Expert_Opinion_
Summary
Freckland
AS3600 Durability
Compliance Assessment of
AFS Logic Wall
Freckland
General Rescue
Assessment Instrument
Aug 2009
Freckland
09.11 Chris Schomburgk
Paper
Freckland
PoundSterlingIR Manual
Freckland
IR manual - asian
You're reading a employees
preview *
Freckland
Unlock full
access (pages
9-12) by
uploading
documents IR manual - saudi
or with a 30 employees
day free trial Freckland
SAEP-1200 (2011) -
Qualification Procedures
of Coating and Abrasive…
Freckland
Blasting Products.pdf
SAES-B-067 - Safety
Identification and Safety
Colors.pdf
Freckland
SAES-W-012 - Welding
Requirements for
Pipelines.pdf
Freckland
SAES-W-014 - Weld
Overlays and Welding of
Clad Materials.pdf
Freckland
SAES-W-019 - Girth
Welding Requirements for
Clad Pipes.pdf
Freckland
09-SAMSS-071 (2016) -
Qualification
Requirements for…
Freckland
Inorganic Zinc Primer (17A
& B).pdf
09-SAMSS-089 (2017) -
Shop-Applied External
Fusion Bonded Epoxy…
Freckland
Coating for Steel Line
Pipes.pdf
09-SAMSS-090 - Shop
applied extruded PE -
External coating system…
Freckland
for line pipe.pdf
09-SAMSS-091 (2017) -
Qualification
Requirements for Shop-…
Freckland
Applied Internal FBE
Coatings.pdf
09-SAMSS-101 - Self
priming epoxy mastic with
aliphatic…
Freckland
polyurethane.pdf
09-SAMSS-103 (2016) -
Qualification of High
Temp. Coatings in…
Freckland
Atmospheric (11A & B).pdf
09-SAMSS-108 - Shop
Applied Internal
Fluoropolymer…
Freckland
Coatings.pdf
09-SAMSS-113 (2016) -
External Liquid Coatings
for Buried Pipelines…
Freckland
(APCS-113A).pdf
12-SAMSS-007 -
Fabrication of Structural
and Miscellaneous…
Freckland
Steel.pdf
16-SAMSS-510 - Manually
Operated Pad Mounted 1
kV to 36 kVSwitchgear.pdf
Freckland
45-SAMSS-005 - Drilling
Workover Wellhead and
Valves.pdf
Freckland
09-SAMSS-107 (2016) -
Qualification of
Fluoropolymer Ceramic…
Freckland
Coatings on Fasteners.pdf
Unlock full
access (page
19) by
uploading
documents
or with a 30
Day Free
Trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
24-62) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
76-81) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
87-88) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
94-97) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (page
103) by
uploading
documents
or with a 30
Day Free
Trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
109-141) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
153-158) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
162-166) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
170-173) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
181-189) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (page
193) by
uploading
documents
or with a 30
Day Free
Trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
197-218) by
uploading
documents
or with a 30
day free trial
Continue for Free
You're reading a
preview *
Unlock full
access (pages
225-234) by
uploading
documents
or with a 30
day free trial
Continue for Free
Reward Your
Curiosity
Everything you want to
read.
Anytime. Anywhere. Any
device.
Scribd for
enterprise