PSA+Pre-filing+Checklist Revised 2022
PSA+Pre-filing+Checklist Revised 2022
PSA+Pre-filing+Checklist Revised 2022
ENERGY
REGULATORY
COMMISSION
Applicant/
s: Date:
TECHNICAL REQUIREMENTS
I. Salient Features
☐ IPP Administrator
☐ IPP
Classification of Supplier ☐ Wholesale Aggregator
☐ Interim Supplier
☐ Others _______________
☐ Coal
☐ Bunker/Diesel
Technology ☐ Renewable
☐ Hybrid
☐ Others
☐ Emergency (up to 6 months)
☐ Emergency (more than 6 months to 1 year)
☐ More than 1 to 5 years
Term of the Contract
☐ More than 5 to 10 years
☐ More than 10 to 15 years
☐ More than 15 years & above
☐ Competitive Public Bidding
☐ Swiss Challenge
Mode of Procurement
☐ Exempted (Emergency PSA)
☐ Others _______________
Date of Commencement of Supply
Installed Capacity (if applicable)
Net Dependable Capacity (if applicable)
Contracted Capacity/Energy (MW/kWh)
Minimum Energy Off-Take (MEOT)
2 OF 9
Republic of the Philippines
ENERGY
REGULATORY
COMMISSION
Utility.
☐ 31. Matrix and type of Competitive Selection
Process (CSP).
☐ 32. Certification from General Managers (for
ECs) or CEO/COO (for Private Corp.) for
conducting CSP.
1
Resolution No. 38, Series of 2006 – A Resolution Promulgating the Energy Regulatory Commission’s Rules
of Practice and Procedure.
2
Rule 20 B Section 2 of the ERC Rules of Practice and Procedures – Supporting Documents and
Information.
6 OF 9
Republic of the Philippines
ENERGY
REGULATORY
COMMISSION
Thus, the Applicants shall submit the documents in the following format:
3
Resolution No. 9, Series of 2020 - A Resolution Adopting the Guidelines Governing Electronic Applications,
Filing and Virtual Hearings Before the Energy Regulatory Commission.
7 OF 9
Republic of the Philippines
ENERGY
REGULATORY
COMMISSION
ANNEX “A”
SAMPLE SUPPLY – DEMAND SCENARIO
Supply-Demand Scenario (Yearly)
8 OF 9
Republic of the Philippines
ENERGY
REGULATORY
COMMISSION
ANNEX “B”
SAMPLE AVERAGE DAILY LOAD CURVE
1.
2.
3.
4.
9 OF 9