PROPOSED PILOT PLANT FOR THE PRODUCTION OF PRECIPITATED KIPS ENGINEERING LIMITED.

CALCIUM CARBONATE FOR PHARMACEUTICALS & ALLIED


INDUSTRY AT NARICT, ZARIA JULY, 2020

SLAB REINFORCEMENT DESIGN

LEGEND:
d/h = Slab Effective/Total Depths (d=h-cover)
g/q = Dead/Live Loads (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-span = Ultimate Span Moment
M-sup = Ultimate Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Slab Strip: X1 -- Storey: 1


---------------------------
Materials: C20/25 / Grade 460 (Type 2)

Type g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Sup S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)

Support Mc = 0.6Support As = 174.17/201.06 SupTop: Y8-250(T1)

P1 1 6.600 4130.00 0.0320 0.0240 174.17/223.4


118/150 2.500 3600.00 5.0 3.7 StrBot: Y8-225(B2)

Support Mc = 4.7Support As = 185.98/201.06 SupTop: Y8-250(T1)

P3 1 6.600 1730.05 0.1000 0.0860 185.98/251.33


126/150 2.500 7200.00 3.6 3.1 StrBot: Y8-200(B1)

Support Mc = 0.5 Support As = 185.98/0.00

Slab Strip: X2 -- Storey: 1


---------------------------
Materials: C20/25 / Grade 460 (Type 2)

Type g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Sup S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)

Support Mc = 0.6Support As = 174.17/201.06 SupTop: Y8-250(T1)

P2 1 6.600 4130.00 0.0320 0.0240 174.17/223.4


118/150 2.500 3600.00 5.0 3.7 StrBot: Y8-225(B2)

Support Mc = 5.0 Support As = 174.17/0.00

Page 1
PROPOSED PILOT PLANT FOR THE PRODUCTION OF PRECIPITATED KIPS ENGINEERING LIMITED.
CALCIUM CARBONATE FOR PHARMACEUTICALS & ALLIED
INDUSTRY AT NARICT, ZARIA JULY, 2020

Slab Strip: Y1 -- Storey: 1


---------------------------
Materials: C20/25 / Grade 460 (Type 2)

Type g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Sup S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)

Support Mc = 0.7Support As = 185.98/201.06 SupTop: Y8-250(T1)

P2 1 6.600 3600.00 0.0394 0.0299 185.98/251.33


126/150 2.500 4130.00 6.1 4.6 StrBot: Y8-200(B1)

Support Mc = 6.1Support As = 185.98/201.06 SupTop: Y8-250(T1)

P1 1 6.600 3600.00 0.0394 0.0299 185.98/251.33


126/150 2.500 4130.00 6.1 4.6 StrBot: Y8-200(B1)

Support Mc = 0.7 Support As = 185.98/0.00

Slab Strip: Y2 -- Storey: 1


---------------------------
Materials: C20/25 / Grade 460 (Type 2)

Type g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Sup S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)

Support Mc = 2.2Support As = 174.17/201.06 SupTop: Y8-250(T1)

P3 1 6.600 7200.00 0.0000 0.0240 174.17/223.4


118/150 2.500 1542.00 2.2 14.9 StrBot: Y8-225(B2)

Support Mc = 2.2 Support As = 174.17/0.00