1497-Ipc 04
1497-Ipc 04
1497-Ipc 04
05 DATE : 27/10/2020
1 Job Description : Construction of New Building for Divisional
Secretariat at Mahawilachchiya - Anuradhapura
Contract Price
Contract Price (At Award): Rs 297,843,625.55
Less, Provisional Sum for Day Works Rs -
Less, Provisional Sum for Contingency Rs -
Effective Contract Price Rs 297,843,625.55
Add/(less) Variations Rs -
Add Adjustments for provisional Sum Rs -
Day Works Rs -
Anticipated Revised Contract Price Rs 297,843,625.55
Amount (Rs)
1 Total work done as per BOQ 24,191,820.27
Less
Discount 0.551% (if any) (Annex I) (B) 1,515,687.24
2 Sub Total 1 22,676,133.03
Add
Variation (Annex 1) (D)
Materials at site (80% of total cost of materials ) -
3 Gross amount of the bill 22,676,133.03
Less: Gross amount certified previously (Annex I) (F) Err:509
4 Gross amount certified in this bill Err:509
Less
Mobilisation Advance (a) (Annex I) (G) (5,392,466.60)
Retention Money (b) (Annex I) (H) (2,515,713.80)
Liquidated damage © (Annex I) (I)
Total recoveries R=a+b+c (7,908,180.40)
5 Total Amount Payable to the Contractor (Without Taxes) Err:509
Add: 15% VAT Err:509
NET AMOUNT CERTIFIED FOR PAYMENT (SLR) Err:509
(SLR Six Million Four Hundred Seventy Six Thousand Five Hundred Eighty One and Cents Forty Five only)
D - Variation = 302,634.26
E - Material at site = -
I - Other Recoveries
…………………………… ………………………………
Prepared by Checked by
A.M.B Mhotti W.D.S. Wickramanayaka
Technical Assistant Civil Engineer
Annex I
J - Details of Recovery of Mobilization Advance (Cumulative) (Max Rs 12,464,180.98-Without VAT)
…………………………… ………………………………
Prepared by Checked by
A.M.B Mohotti W.D.S. Wickramanayaka
Annex I
Technical Assistant Civil Engineer
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT AT MAHAWILACHCHIYA- ANURADHAPURA
……………………….. ………………………………
Prepared by Checked by
A.M.B Mohotti W.D.S. Wickramanayaka
Technical Assistant Civil Engineer
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT AT MAHAWILACHCHIYA- ANURADHAPURA
2D PLASTERING 372,450.00 - - -
……………………….. ………………………………
Prepared by Checked by
A.M.B Mohotti W.D.S. Wickramanayaka
Technical Assistant Civil Engineer
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT AT MAHAWILACHCHIYA- ANURADHAPURA
……………………….. ………………………………
Prepared by Checked by
A.M.B Mohotti W.D.S. Wickramanayaka
Technical Assistant Civil Engineer
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT AT MAHAWILACHCHIYA- ANURADHAPURA
Extra Work
SUB TOTAL - -
……………………….. ………………………………
Prepared by Checked by
L.K.A.S. Loku Kalu Arachchi W.D.S. Wickramanayaka
Technical Assistant (QS) Civil Engineer
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT AT
MAHAWILACHCHIYA- ANURADHAPURA
Material At Site
summary -
80% of Material at site -
…………………………………… ……………………………………
L.K.A.S. Loku Kalu Arachchi Checked By
Technical Assistant (QS) Eng. W.D.S. Wickramanayaka
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT AT MAHAWILACHCHIYA- ANURADHAPURA
j Factor
Category: Input % Index Index Px(Ixc-Ixb) Index Px(Ixc-Ixb) Index Px(Ixc-Ixb) Index Px(Ixc-Ixb)
(L3) Unskilled Labour 18.38 611.60 611.60 0.000 690.80 2.380 690.8 2.380 690.8 2.380
(M13) Reinforcement Steel 15.88 714.80 714.80 0.000 714.80 0.000 714.8 - 714.8 -
(L1) Skilled Labour 12.86 511.50 511.50 0.000 560.30 1.230 560.3 1.230 560.3 1.230
(M4) Cement 11.74 603.10 603.10 0.000 581.80 -0.410 581.80 -0.410 581.80 (0.410)
(M10) Bricks 8.72 539.90 539.90 0.000 629.00 1.440 629 1.440 629 1.440
(M8) Sand 4.83 3,612.80 3,612.80 0.000 3,612.80 0.000 3,612.80 - 3,454.00 (0.210)
(M46) Zn/Al Sheet 4.32 186.50 186.50 0.000 186.50 0.000 186.50 - 190.00 0.080
(M21) Form work Timber 4.19 1,084.20 1,084.20 0.000 1,084.20 0.000 1,084.20 - 1,084.20 -
(M7) Metal 3.55 410.30 410.30 0.000 410.30 0.000 410.3 - 380.2 (0.260)
(M14) Structural Steel 3.23 562.00 562.00 0.000 562.00 0.000 562.00 - 562 -
(M45) Earth 2.3 1,286.90 1,286.90 0.000 1,286.90 0.000 1,286.90 - 1,286.90 -
2A-10 30,020.00
3B-27 -
5A-3 -
5A-4
……………………….. ………………………………
Prepared by Checked by
L.K.A.S. Loku Kalu Arachchi W.D.S. Wickramanayaka
Technical Assistant (QS) Civil Engineer
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
1A PRELIMINARIES
13
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
11 Mode of Payment
The Amounts stated in the Bill No.1 -
Preliminaries may be released in the manner
recommended below as per the ICTAD
publication No. ICTAD/ID/04 published in June
2009.
BILL OF QUANTITIES
15
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
Engineer's Facilities
1A-5 Allow lump sum for constructing, maintaining, C Item 1.00 150,000.00
dismantling and removal on completion of the
works a temporary building (6m x 3m) for
Engineer's office with air condition and toilet
facilities. Including following facilities.
1A-6 Allow lump sum accomadation facilities for E Item 1.00 120,000.00
Engineer's staff (Two Rooms & Kitchen with
furniture)
1A-7 Allow lump sum for providing fixed line/CDMA D Item 1.00 35,000.00
telephone, internet connection, electricity and
water service including drinking water for the
Engineer's site office for their use in connection
with the works.
16
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
Contractor's Facilities
1A-9 Allow lump sum for constructing, C Item 1.00 100,000.00
maintaining,dismantling and removal on
completion of the works a temporory site office
with toilets facilities.
1A-11 Allow lump sum for providing and maintaining C Item 1.00 50,000.00
accommodation with toilets, dinning room with
table & chairs , adequate working space with
supply of water and other facilities for workers
outside the construction site with the necessary
sanitary facilities and other relevant services
required to maintain health and safety of workers.
1A-12 Allow lump sum for maintenance, rental, E Item 1.00 50,000.00
consumption charges etc.for telephone and
fascimile facilities,electricity and water services
for the construction work ,Contractor's site office
for their use in connection with the works.
17
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
1A-15 Allow lump sum for provision of 3 set of (hard D Item 1.00 20,000.00
copies and soft copies) as-built drawings of
following services, for Engineer's approval.
(a) Architectural
(b) Mechanical, Electrical & Plumbing
1A-16 Allow lum sum for all cost in connection with E Item 1.00 50,000.00
preparing samples for testing, marking
arrengements for testing of materials, Goods etc.
as stipulated in the specification, obtaining test
reports and submitting the same to the Engineer. (
For the tests not included in the BOQ work items)
1A-18 Allow lump sum for dust control net around the C Item 1.00 40,000.00
site.
1A-20 Allow Lump sum for maintaining first aid box at C Item 1.00 20,000.00
the site including a list of emergency phone
numbers, sterile gauze pads of different sizes,
adhesive tape, adhesive bandages (Band-Aids) in
several sizes, elastic bandage, a splint, antiseptic
wipes, soap, antibiotic ointment, antiseptic
solution (like hydrogen peroxide), hydrocortisone
cream (1%), Paracetamol, etc.
18
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
1A-21 J
Movements of workers at the site Details of
Workers and material transport personnel to
be provided with details including impacts
and mitigation methods to be adhered should
be displayed at the site and any other areas
where labors are moving.
1A-23 J
Grievance of community due to
construction activities Community
complaints with regard to environmental
safeguard to be revisited by the client’s
representatives. Name Board visible to
outside to be displaced at the site as to whom
community complaints should be sent.
1A-24 Allow lump sum for providing and maintaing C Item 1.00 150,000.00
necessary fencing (2100mm height covering)
around the working area, hording and gate and
safeguard the works, materials, plants and safety
net to minimize the distribution to public, main
road and ground as directed by the Engineer.
19
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT,MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
1A-27 Allow lump sum for supplying quality drinking E Item 1.00 50,000.00
water. Water should be made avalable for all
employer, consultant and Client.
1A-28 Allow lump sum for supplying temporary E Item 1.00 50,000.00
electricity for the work during the Construction
including temporary connection, distribution
system for the work, Internal arrangements and all
payment to authorities for temporary connection
with saftey measures. In the case of any failure of
electricity supply, the contractor shall provide
alternative supply and all such cost to be borne by
the contractor.
1A-29 Allow Provisional Sum for supply and Installation C Item 1.00 25,000.00
of Name Boards with displaying contract details
as directed by the Engineer. Displaing contract
details are Contractor Name, Client
Name,Consultant Name, Project duration,
Contract Amount, etc.
20
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
21
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
22
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
23
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
108,646.65 - 108,646.65
261,747.79 - 261,747.79
65,449.88 - 65,449.88
-
84,488.58 - 84,488.58
105,000.00 - 105,000.00
-
24,500.00 - - 24,500.00
-
24
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
16,666.66 12,500.00 4,166.67 33,333.33
-
-
70,000.00 7,500.00 2,500.00 80,000.00
- - -
30,000.00 3,750.00 6,250.00 40,000.00
-
-
25,000.00 - 25,000.00
25
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
-
- - -
- - -
-
-
4,166.67 - 4,166.67
--
3,333.33 2,500.00 833.33 6,666.66
-
- - -
-
- - -
-
26
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
-
-
- - -
-
7,000.00 750.00 250.00 8,000.00
- - --
-
-
-
105,000.00 11,250.00 3,750.00 120,000.00
-
-
27
PREVIOUS AMOUNT Rrevious Amount CURRENT AMOUNT CUMILATIVE
AMOUNT
Rs. Cts. Rs. Cts. Rs. Cts.
-
16,666.67 12,500.00 4,166.67 -
33,333.34
-
1,168,166.24 134,375.00 49,791.68 1,352,332.92
28
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
Site preparation
29
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
Excavation
2A-4 General excavation in hard soil (including m3 150 1,200.00 180,000.00
temporary supports), commencing from reduced
ground level, in any material met with except rock
requiring blasting. Rate shall include for compacting
and levelling bottom surface
2A-5 Excavation in hard soil for Column footings, m3 300 1,200.00 360,000.00
commencing from reduced ground level, in any
material met with except rock requiring blasting.
Rate shall include for any temporary supports,
compacting and levelling bottom, depth not
exceeding 3.00m
2A-6 Excavation in hard soil for Lift Well, commencing m3 12 1,200.00 14,400.00
from reduced ground level, in any material met with
except rock requiring blasting. Rate shall include for
any temporary supports, compacting and levelling
bottom, depth not exceeding 2.50m
2A-7 Excavation in hard soil for Trench for wall m3 142 1,200.00 170,400.00
foundation trenches and ground beam,
commencing from reduced ground level, in any
material met with except rock requiring blasting.
Rate shall include for temporary supports sloping
sides, compacting and levelling bottom, depth not
exceeding 2.00m
Filling
2A-8 Supplying and filling under floors and column m3 450 1,200.00 540,000.00
footings with gravel or other filling material
approved by the Engineer including spreading,
watering and well ramming using Whacker or other
similar machine in 150mm layers as directed
(Material available at Site)
30
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
Dewatering
2A-10 Allow for design and establishing a suitable P.S 30,000.00
dewatering system in a manner acceptable to the
Engineer for surface water and ground water as
necessary . The bidder shall submit all details of his
proposal indicating all technical details with the
tender to the approval of the Engineer.
Surface Treatment
2A-11 Anti termite treatment by specialist sub contractor m2 2167 220.00 476,740.00
possessing registration of pesticide controller
including minimum 10 years warrantee. The
chemical to be used should be approved by the
pesticide controller. Work should be carried out
through a reputed sub contractor and method
statement shall be submitted to the Engineer for prior
approval. treatment shall be cover excavated pits and
ground floor slab and further rate include for
rechargeable anti-treatment system inside periperals
of wall foundation complete in working order.
2B - MASONRY WORKS
2B-1 6" x 9" Random rubble masonry for foundation in 1:5 m3 149 7,850.00 1,169,650.00
cement sand mortar. Rate to include for weep holes
in retaining walls.
31
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
2C - CONCRETE WORKS
Unless otherwise stated all concrete shall be of grade Note
as per Specifications/Drawings.
32
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
Rate for form work shall include for all necessary Note
measures to provide fair face finish.
2C-1 50mm thick, 1:3:6 (25mm) cement concrete under m2 157 850.00 133,450.00
Random rubble masonry foundation including form
work. Rate including 1000 gauge polythene.
2C-2 50mm thick,1:3:6 (25mm) cement concrete under m2 224 850.00 190,400.00
columns footings including form work. Rate
including 1000 gauge polythene.
33
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
2C-5 75mm thick, 1:2:4 (20mm) cement concrete bed, m3 129 18,500.00 2,386,500.00
supply and laying to fabric reinforcement guage
6mm and charateristic strenth including bends,
hooks, tying wire, laps, wastage in floor &
pavement with drain on compacted earth filling.
Rate including 1000 gauge polythene.
FORMWORK
2C-11 Form work for sides of Columns footings m2 120 1,200.00 144,000.00
2C-13 Form work for sides of Tie beam. m2 674 1,200.00 808,800.00
2C-14 Form work for sides of column shaft up to DPC level m2 120 1,200.00 144,000.00
34
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MA
BILL OF QUANTITIES
2C-18 Tor Steel reinforcement for Lift Bed, Lift wall up to t 0.70 215,000.00 150,500.00
DPC
2C-19 Tor steel reinforcement for pavement drain t 2.00 215,000.00 430,000.00
2C-20 Tor steel reinforcement for Tie beam t 2.00 215,000.00 430,000.00
2C-21 Mild steel reinforcement for Tie beam t 0.90 215,000.00 193,500.00
2C-22 Tor steel reinforcement for column shaft up to DPC t 1.50 215,000.00 322,500.00
2C-23 Mild steel reinforcement for column shaft up to DPC t 0.30 215,000.00 64,500.00
Sub Total of Concrete Work Carried to Sub Summary of Bill No.03 9,136,800.00
2D - PLASTERING
2D-1 20mm thick 1:3 cement sand rendering for plinth m2 382 975.00 372,450.00
plaster including finishing smooth with coloured
cement floating coat.
35
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
19 95,000.00 0 - 19 95,000.00
2 15,000.00 0 - 2 15,000.00
36
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
0 - - 0 -
37
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
0 - - 0 -
38
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
39
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
40
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
- - 0 -
- - 0 -
- - 0 -
41
ECRETARIAT, MAHAWILACHCHIYA AT ANURADHAPURA
UANTITIES
- - 0 -
- - 0 -
- - - - - -
42
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
All Bricks shall be well burnt standard size brick with Note
specified strength.
BRICK WORK
Brick Filling
3A-7 Staircase for stage in First Floor Level m3 1.5 15,000.00 22,500.00
Sub Total of Brick Work Carried to Sub Summary of Bill No.04 7,185,575.00
43
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
3B - CONCRETE WORKS
44
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
Rate for form work shall include for all necessary Note
measures to provide fair face finish.
45
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
3B-4 First Floor Level Slab includig flower though area m3 170 20,500.00 3,485,000.00
3B-7 Windows canaopy & Rcc slab at 600mm Level from m3 7 20,500.00 143,500.00
FF (G.F)
3B-8 Windows canaopy & Rcc slab at 600mm Level from m3 5 20,500.00 102,500.00
FF (F.F)
46
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
47
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
48
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
3B-27 Supplying and fixing of Pre-Cast RCC vertival lovers P.S 250,000.00
for windows canaopy. As directed by the Engineer.
(both floors)
FORM WORK
3B-34 Windows canaopy & Rcc slab at 600mm Level from m2 69 1,450.00 100,050.00
FF (G.F)
3B-35 Windows canaopy & Rcc slab at 600mm Level from m2 48 1,450.00 69,600.00
FF (F.F)
49
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
50
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
REINFORCEMENT
3B-50 Windows canaopy & Rcc slab at 600mm Level from t 0.75 215,000.00 161,250.00
FF (G.F)
3B-51 Windows canaopy & Rcc slab at 600mm Level from t 0.5 215,000.00 107,500.00
FF (F.F)
51
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
3B-56 Ground Floor Level to First Floor Level t 0.5 215,000.00 107,500.00
3B-57 First Floor Level Staircase for stage t 0.5 215,000.00 107,500.00
3B-58 Ground Floor Level to First Floor Level t 0.30 215,000.00 64,500.00
3B-59 First Floor Level to Second Floor Level t 0.20 215,000.00 43,000.00
3B-60 Mild Steel reinforcement for all works t 2.50 215,000.00 537,500.00
Sub Total of Concrete Work Carried to Sub Summary of Bill No.04 25,913,050.00
3C - WALL FINISHES
WALL FINISHES
52
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
Sub Total of Floor & Wall Carried to Sub Summary of Bill No.04 1,249,500.00
53
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
All steel used in the work shall comply with the Note
relevant British Standards and to the specifications.
All steel shall be new and each member shall be free Note
from any built- weld or other forms of splice for the
full length between joints shown in or indicated in the
drawings unless such splice shall have been shown in
the approved drawings.
The Bidder shall submit the specification for the steel Note
which he proposed to use and obtain prior approval
from the Engineer before commencement of ordering
of steel and fabrication.
Drawings
Before any steel work is fabricated the contractor Note
shall obtain the Engineer's approval of the proposed
details of fabrications. For this purpose, two copies
of each drawings shall be submitted to the Engineer
not less than 14 days before commencement of
fabrication.
Inspections
All steel work shall be subjected for inspection by the Note
Engineer. The steel works shall not be moved from
the place of fabrication nor primed or painted until
the approval of the Engineer has been obtained for
the fabrication of steel work.
Welding
No welding shall be done until approval of the Note
prepared surface has been obtained. All welding shall
be carried out under the supervision of qualified
persons.
54
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
Roof Structure
3D-1 Fabricating and fixing of steel Truss ( T1,T2,T3,T4) kg 10,000 290.00 2,900,000.00
for first floor roof including gusset plates, sole
plates, base plates, cleats and bolt and nuts.Rate
include to applying two coats of anti corrosive
paint.detail as per the drawings.
3D-3 Supplying and fixing of 100 x 75 double timber nr 3.00 2,000.00 6,000.00
(Class B) prop as per the details drawings .Rate
include to applying water base paint & necassary .
(Approximate Length - 1700mm)
55
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA AT
ANURADHAPURA
BILL OF QUANTITIES
Roof Covering
3D-4 Supplying and fixing of 0.47mm top sheet thickness m2 1600 3,500.00 5,600,000.00
Zn/Al colour bond, Tile profile roofing sheet or
equivalant for first floor roof on steel frame work as
per the detail drawings. Rate shall including to
fasteners and washers. frame work paid separately.
3D-5 Supplying and laying of aluminium 5mm thick foil m2 1600 900.00 1,440,000.00
bubble reflective type double sided roof insulation.
3mm thick Air gap tape should be provided between
foil and roofing sheet along the purlins. 50mm lap
length should be provided in any joint using double
sided adhesive tape. Only the covered area will be
consider for measurement. (Mc Foil or equivalent)
3D-6 Supply and fix 0.47mm thk Zn-Al Tile Profile Lm 209 2,200.00 459,800.00
Colour ridging with necessary bolts and nuts.
3D-7 Supply and fix 0.47 mm thk Zn-Al colour valley Lm 15 2,150.00 32,250.00
gutter on existing steel members.
3D-8 Supply & fixing 0.47mm thk 300mm width Zn- Lm 320 1,000.00 320,000.00
Al Colour Valance Board with necessary bolt and
nuts.
3D-9 Supply and fix 0.47mm thk 130x145mmm size Lm 320 1,850.00 592,000.00
Zn-Al Colour eave gutter with necessary bolts
and nuts.
Sub Total of water Proofing Work Carried to Sub Summary of Bill 15,227,550.00
No.04
56
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
58
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
59
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
60
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
0.00 - 6.89 141,245.00 6.89 141,245.00
61
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
62
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
63
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
59.64 86,478.00 2.18 3,161.00 61.82 89,639.00
64
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
65
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
66
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
496.97
496.97
73.15
12 96
67
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
68
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
28500
#REF!
69
PREVIOUS AMOUNT AMOUNT
QTY AMOUNT QTY AMOUNT QTY AMOUNT
70
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
BILL NO. 04- MISCELLANIOUS & WATER PROOFING WORK
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
Rs. Cts. Rs. Cts.
MISCELLANIOUS & WATER PROOFING WORK
General Notes :
For the full description of materials and Note
workmanship refer to the relevant sections of
Specification for the works, Pricing Preambles
and the Drawings.
5A-1 Supplying and fixing of Dome type 110mm Nos 4 5,100.00 20,400.00
dia cast iron roof outlet(225x225mm) . Rate
shall including all necessary work.
5A-2 Supplying and fixing of 63mm dia uPVC Nos 16 2,750.00 44,000.00
Balcony outlet . Rate shall including all
necessary work.
5A-3 Allow Item Sum for Supplying and fixing PVC P.S 1 150,000.00
Conduit & Junction boxes before laying Slab &
beam concrete ( both floors) . Rate shall include
submit 3 copies of As-built Drawings.
5A-4 Allow Provisional Sum for Supplying and fixing P.S 1 175,000.00
100mm height Flashing curb . Rate shall include
plastering, painting ect.(approx. length 120m).
Detail as directed by the Engineer.
71
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
BILL NO. 04- MISCELLANIOUS & WATER PROOFING WORK
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
Rs. Cts. Rs. Cts.
5A-5 WATER PROOFING WORK
72
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, MAHAWILACHCHIYA
AT ANURADHAPURA
BILL OF QUANTITIES
BILL NO. 04- MISCELLANIOUS & WATER PROOFING WORK
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
Rs. Cts. Rs. Cts.
For Roof Slab
5A-5.6 Applying Torch-on or other approved m2 321 4,100.00 1,316,100.00
waterproofing material in building roof slab and
covered with 1:3 cement sand leveling (min
10mm thick) screed, approved thermal insulation,
type 1000 polythene sheet, 6mm dia. mild steel
mesh, and 75 mm thick Grade 25 (20) concrete
layer as subjected to requirements in
manufacturer's specification. Rate to include for
cleaning existing floor surfaces to be free from
dust, cement laitance, grout deposits and repair
honey combs, P-cone holes, construction joints
with non shrink, high strength repair grout and
curing the application for 5 days.
73
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
PLUMBING WORKS
General Notes :
For the full description of materials and Note
workmanship refer to the relevant sections of
Specification for the works, Pricing Preambles
and the Drawings.
74
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
75
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
76
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
Pipe Work
4A-2 Supply and laying of PNT 11, 75 mm (2 1/2") dia m 3 1,500.00 4,500.00
uPVC pipes fixed on ground level as ring main
from water tank.
4A-4 Supply and laying of PNT 11, 50 mm (1 1/2") dia m 3 640.00 1,920.00
uPVC washout pipes fixed on water tank.
4A-5 Supply and laying of PNT 11, 63 mm (2") dia m 5 1,030.00 5,150.00
uPVC washout pipes fixed on water tank slab and
convey to nearest down pipe location.
77
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
78
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
4A-7 2" dia. Brass gate valve for tank distribution line nr 2 7,800.00 15,600.00
DISTRIBUTION MAIN
Pipe Work
Fittings
Ground Floor
4A-12 40 mm (1 1/4") dia. uPVC pipe m 30 800.00 24,000.00
First Floor
4A-17 32 mm (1") dia. uPVC pipe m 30 500.00 15,000.00
79
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
80
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
Ground floor
Fittings
Sub Total of Water Supply System Carried to Sub Summary of Bill No.04 432,960.00
81
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
BILL OF QUANTITIES
83
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
4B-10 90 mm (3") dia. uPVC pipes for urinal m 25.00 1,290.00 32,250.00
4B-11 75 mm (1 1/2") dia. uPVC pipes for vent m 25.00 1,250.00 31,250.00
Fittings
4B-12 50 mm (1 1/2") dia. uPVC vent cowl nr 5 750.00 3,750.00
4B-23 110 mm (4") dia. 'Y' Junction with cleaning eye nr 5 1,410.00 7,050.00
4B-24 90 mm (3") dia. 'Y' Junction with cleaning eye nr 3 1,020.00 3,060.00
4B-25 110 mm (4") dia. Sweep 'T' junction with cleaning nr 5 1,270.00 6,350.00
eye
4B-26 90 mm (3") dia. Sweep 'T' junction with cleaning nr 5 1,120.00 5,600.00
eye
4B-27 110 mm (4") dia. Long radius bend nr 3 2,500.00 7,500.00
84
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
85
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
86
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
87
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
EXTERNAL SYSTEM
88
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
4B-59 For size of 1200 x 1200 mm (depth 0.6 m - 0.9 m) nr 2 38,000.00 76,000.00
with 100 mm thick precast cover slab for
1200x1200 mm sized opening
4B-60 For size of 1500 x 1500 mm (depth 0.9 - 1.2 m) nr 2 55,000.00 110,000.00
with 100 mm thick precast cover slab for 600x600
mm sized opening
89
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
90
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
4B-68 For size of 600 x 600 mm (depth upto 0.75m) nr 2 26,500.00 53,000.00
4B-69 For size of 900 x 900 mm (depth upto 0.75m) nr 2 32,500.00 65,000.00
91
CONSTRUCTION OF NEW BUILDING FOR DIVISIONAL SECRETARIAT, NUWARAGAM PALATHA
– CENTRAL AT ANURADHAPURA
BILL OF QUANTITIES
92
1 1700 1700
1 1700 1700
5 3500 17500
7 3500 24500
1 8000 8000
53400
11250
64650
12930
77580
Contract sum 100
VAT 8% 8
Total 108
5.4
102.6
Advance 20
VAT 8% 1.6
Total 21.6
Option 01 Option 02
IP 01 IP 01
Work done 100 Work done 50
VAT 8% 8 VAT 8% 4
Total 108 Total 54
Advance Recovery 21.6 Advance Recovery 12
Retention 5.4 Retention 5.4
81 36.6
1A-1 381,280.64
1A-2 1,377,751.17
1A-3 370,765.08
1A-4 54,793.83
1A-5 0.00 263,334.12
1A-6 0.00 28,750.00
1A-7 0.00
1A-8 0.00 308,476.98
1A-9 0.00
1A-10 0.00
1A-11 0.00
1A-11a 402,279.45 349,347.85
1A-11b 0.00 249,534.12
1A-11c 0.00
1A-11d 0.00
1A-11e 0.00
1A-12 14,375.00
1A-13 0.00
1A-14 0.00
1A-15 0.00
1A-16 0.00 2,079.66
1A-17 11,972.60 10,396.66
1A-18
1A-19 7,183.56 6,238.28
1A-20 143,671.23 124,766.99
1A-21 47,890.41 41,589.47
1A-22 0.00 20,794.62
1A-23 0.00 24,953.28
2,811,962.97 1,430,262.03
IPA 03 IPA 04 IPA 05 Cumalative
381,280.64
1,377,751.17
370,765.08
54,793.83
20,180.02 19,518.38 17,533.46 320,565.98
28,750.00
0.00
23,639.33 22,864.27 20,539.09 375,519.67
0.00
0.00
0.00
206,432.85 312,295.85 280,536.95 1,550,892.95
136,109.52 223,068.38 200,383.46 809,095.48
0.00
0.00
0.00
14,375.00
0.00
0.00
0.00
1,922.11 1,859.09 1,670.03 7,530.89
9,766.86 4,883.43 12,759.93 49,779.48
1,830,726.40
101,338.00
1,283,888.52
0.00
47,808.00
0.00
3,263,760.92
IPA 01
Concrete Rate
Qty Amount
1,016,111.25
0.00
5,270,680.00
2,590,179.50
680,535.50
1,960,577.50
1,826,722.10
199,881.50
3,754,051.09
3,061,052.43
217,432.00
125,674.47
20,702,897.34
IPA 01
Masonry Rate
Qty Amount
2,187,472.50
2,187,472.50
IPA 01
Plastering Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
WALL FINISHES Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
FLOOR FINISHES Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
CEILING FINISHES Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
PAINTING Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
DOORS & WINDOWS Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
WOOD WORK Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
IPA 01
ROOFER Rate
Qty Amount
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Construction of New building For Divisional Secretarial at Mahavilachchiya- Anuradapura
Extra Work
Cutting
Down
trees
lowing
1.0 branchersc Item 1.00 24,845.00 24,845.00
arefully,
uprooting
and
stackking
Cement
concrete
1:1:2 1/2
with 3/4
2.0 metal m3 6.07 25,678.29 155,867.22
(grade 30)
For the Lift
well with
XYPEX
3mm thk.
200mm
wide Gi
3.0 plate m 10.4 3601.41 37,454.66
water bar
for the lift
well wall
Cement
concrete
4.0 1:1:2 1/2 m3 3.77 22405.14 84,467.38
(Grade
30) for
the lift
well
SUB TOTAL 302,634.26
………………………..
Prepared by Checked by
A.M.B Mohotti W .D. S. Wickramanayake
Technical Assistant