The original presentation of this paper was published in Materials Evaluation in October 1994. I
have updated this paper to include current information regarding each response to each
question. I have also added some additional sources that were not included in the 1994 paper.
Some observations:
This paper was developed for personnel in the NDT field. It is the intent of this paper to help
NDT personnel identify, and obtain a better understanding of the many approaches industry has
in developing guidelines for the penetrant discipline. This paper does not address all the
possible issues associated with the Liquid Penetrant Process nor does it address all the possible
responses, especially from sources that contain hundreds of pages of data.
There are numerous sources (i.e., specifications, papers, books, etc.) that address the specifics
of the Liquid Penetrant Discipline. This paper provides a sampling of these sources.
1
Penetrant Inspection Discipline
The responses from the 1994 document are in black and current responses are in blue print.
By Danny N Marks
1. What temperature range #1: The temperature of the penetrant ASTM E 165-95 Liquid
(°F) should the penetrant materials and the surface of the part to Penetrant Inspection Method.
and part be before be processed should be between 50 Note: AWS D1.1-92 (Chapter 6 –
applying the penetrant? and 100°F (10and 38°C) (8.2). Note: Inspection and API Standard
Item “A” from table 2 states, for 1104 (Section 8.3) States that E
temperature range from 50 to 100°F 165 shall be used for PT
for fluorescent penetrants and 50 to application/procedure.
125°F for visible penetrants.
2
#3: 7.1.1 Temperature Limits: Same ASTM E1220-16 Standard
statement as per ASTM E1219-16. Practice for Visible Penetrant
Testing Using Solvent-
Removable Process
#6: The penetrant and surface of part, ASME (1992) Boiler and
to be processed, shall not be below Pressure Vessel Code; Section V;
60°F nor above 125°F throughout the Article 6 – Liquid Penetrant
examination period. Examination
3
special penetrants formulated for hot
applications exceeding these limits.
Special purpose penetrants are
discussed in (paragraph 2.7). (2.4.6)
Penetrant inspection SHALL NOT be
performed when the test part
temperature is less than 40°F (4°C).
(2.4.6.1)
NOTE: When temperatures are
between 40°F (4°C) and 60°F
(15.6°C), the penetration dwell time
SHALL be increased in accordance
with (paragraph 2.4.7.4.2, Table 2-2)
due to the increased viscosity.
(2.4.6.1.4)
4
#10: Prior to processing allow parts to P.S. 21202 Rev R (1993)
attain a temperature of 40 to 120°F, McDonnell Douglas Liquid
also penetrant and ambient air Penetrant Process Specification
temperature must be between 40 and
120°F for penetrant application. (6.4)
2. What intensity level (fc) #1: Visible ambient light should not ASTM E 165-95 Liquid
should visible light be at exceed 2 ft candles when examining Penetrant Inspection Method.
the examination site? fluorescent penetrant indications Note: AWS D1.1-92 (Chapter 6 –
under black light in a darken area. For Inspection) and API Standard
visible penetrant indications, a 1104 (Section 8.3) states that E
5
minimum visible light intensity at the 165 shall be used for PT
examination site of 100 fc is applications/procedure.
recommended.
#2: Visible ambient light should not ASTM E 1219-94 Standard Test
exceed 2 fc when examining Method for Fluorescent Liquid
fluorescent penetrant indications Penetrant Examination Using the
under black light in a darken area. Solvent-Removable Process
(7.1.8.1)
#4: For visible dye examination, Type ASTM E 1417-95a Practice for
II, the lighting system shall provide at Liquid Penetrant Examination
least 100 fc of visible light when
measured at the examination surface.
For stationary fluorescent dye
examination, Type I, the ambient
visible light background shall not
exceed 2 fc at the examination
surface.
6
(7.8.4.3)…it is recommended that a
visible light contamination be taken at
the viewing surface, when the UV-A
lamp is on and is held at the angle and
distance used for interpretation. The
white light reading shall not exceed 2
fc [21.5 lx]. (7.8.4.1)
#6: For color contrast penetrants 2010 ASME Boiler & Pressure
(visible) A minimum light intensity of Vessel Code, 2011a Addenda,
100 fc (1000 lx) is required on the July 1, 2011 - V Nondestructive
surface to be examined to Examination - Article 6 - Liquid
ensure adequate sensitivity during the Penetrant Examination
examination and
evaluation of indications. (T-676.3)
#7: The ambient light levels within the T.O. 33B-1-1 Air Force
inspection station of the fluorescent Technical Manual (change 2,
penetrant inspection unit shall not 1990) – Nondestructive
exceed 2 lumens per square foot (1 Inspection Methods, Chapter 6
lumen per sq foot equals 1 foot
candle). The visible penetrant
requirements are not addressed (6-
374).
7
SHALL NOT exceed 2 foot-candles.
If a stationary inspection booth is not
adequate or appropriate, other
provisions SHALL be made.
(2.5.4.2.1)
Ambient white light SHALL be
measured with a white light meter
with the UV-A lamps on. (2.5.4.1.3)
For inspecting parts that have been
processed with visible-dye penetrant
(Type II), the lighting system in the
viewing area SHALL provide at least
100-foot-candles (1000 lux) of visible
white light at the examination surface.
(2.5.4.2.3)
8
at the working distance (7.1.8). For
fluorescent penetrant method
(inspection booth), a darkened booth
or darken area where ambient white
light does not exceed 2 foot-candles
(4.4.1). The ambient white light
intensity in the inspection booth
(normal method) or inspection area
(ultrahigh sensitivity method) shall be
no more than 2 foot-candles (5.6.2).
9
5.14.2.1: Is the ambient light level in Nadcap Audit Criteria
the inspection area controlled not to AC7114/1 Audit Criteria for
exceed 2 ft candles (20 lux)? Nondestructive Testing Facility
Compliance Assessment Guidance: Penetrant Survey - To be used
This measurement is taken in the on audits starting on or after 31-
darkened inspection area to include Dec-2017.
the examination surface with the UV-
A lights operating at a distance of 15
inches (38 cm).
5.14.3.1: Is 100 ft-candles/1000 lux,
or more, available at the part surface
for visual verification of penetrant
indications? Compliance Assessment
Guidance: This question shall be
applicable where accept/reject
decisions rely on the use of white
light.
#3: The black lights shall provide a ASTM E 1417-95a Practice for
minimum of 1000 µW/cm2 at the Liquid Penetrant Examination
examination surface. Minimum
acceptable intensity is 1000 µW/cm2
at 15 inches from the front of the bulb
or filter.
10
#3: Black Lights—Portable, hand- ASTM E1417/E1417M-16
held, permanently mounted or fixed Standard Practice for Liquid
black lights used to inspect parts shall Penetrant Testing
be checked for intensity as specified in
Table 1 or prior to use, and after bulb
replacement… The minimum
acceptable intensity is 1000 µW/cm2
(10 W/m2) at 15 in. [38.1 cm] from
the front of the filter to the face of the
sensor. (7.8.4.1)
#5: For fluorescent penetrants, the 2010 ASME Boiler & Pressure
process is essentially the same as in T- Vessel Code, 2011a Addenda,
676.3, with the exception that the July 1, 2011 - V Nondestructive
examination is performed using an Examination - Article 6 - Liquid
ultraviolet light, called black light. Penetrant Examination
Black lights shall achieve a minimum
of 1000 µW/cm2 on the surface of the
part being examined throughout the
examination. (T-676.4)
#6: Measure the intensity of the black T.O. 33B-1-1 Air Force
light at a distance of 15 inches from Technical Manual (change 2,
the front or out-side surface of the 1990) – Nondestructive
black light source filter. This intensity Inspection Methods, Chapter 6
shall be a least 1000 µW/cm2 and
sources providing less than this
intensity shall not be utilized. (6-373)
11
discharge lamps and Type A and B Nondestructive Inspection
LED lamps when measured at a Methods, Basic Theory - 15
distance of 15-inches from the outside October 2016
face of the filter. Type C LED lamps
(single LED torch lamps) SHALL
have a minimum UV-A output of
1000 mW/cm 2 over a 3-inch diameter
circle when measured at a distance of
15-inches from the outside face of the
filter. (2.5.4.1.4.2.1.1)
12
ultraviolet filter or bulb (ultrahigh
sensitivity method). (5.6.2) During
inspection with fluorescent penetrants,
position the ultraviolet light at a
distance from the test part surface
such that the ultraviolet light intensity
is a minimum of 1200 microwatts per
cm2 at the test part surface (normal
method) (6.7) During inspection, …
the ultraviolet light intensity is a
minimum of 5,000 microwatts per cm2
at the test part surface (ultrahigh
sensitivity method) (6.7) The
ultraviolet light intensity shall
measure at least 1200 microwatts per
cm2 at a distance of 15 inches from
the front of the ultraviolet filter or
bulb with an ultraviolet light meter
(normal method) (7.1.8.1) … except
the ultraviolet light intensity shall
measure at least 5,000 microwatts/cm2
at 6 inches from the front of the
ultraviolet filter or bulb (7.1.8.1)
13
Page 237 - As an example, an
ultraviolet radiation illumination level
of about 8 to 10 Wꞏm-2 (800 to 1000
µWꞏcm-2) is sufficient to reveal most
anomaly indications.
Page 70 - …measurements are taken
at distances of 380 mm (15 in.) from
the face of the filter on the ultraviolet
lamp, in the center of the ultraviolet
light beam. Various specifications call
for minimum ultraviolet radiation
intensities of 8.6 to 10.2 Wꞏm-2 (865
to 1020 µWꞏcm-2).
4. How long do you let a #1: Allow the black light to warm up ASTM E 165-95 Liquid
black light warm up for a minimum of 10 min. prior to its Penetrant Inspection Method.
prior to use? (Mercury use or measurement of the intensity of Note: AWS D1.1-92 (Chapter 6 –
Vapor Lamp) the ultraviolet light emitted. (8.9.1.3) Inspection) and API Standard
& (7.1.8.3) 1104 (Section 8.3) states that E
165 shall be used for PT
applications/procedure.
ASTM E 1219-94 Standard Test
Method for Fluorescent Liquid
Penetrant Examination Using the
Solvent-Removable Process
14
#2: Not addressed ASTM E 1417-95a Practice for
Liquid Penetrant Examination
MIL-STD-6866 (1985) Military
Standard – Inspection, Liquid
Penetrant
#3: The black light shall be allowed to ASME (1992) Boiler and
warm up for a minimum of 5 min. Pressure Vessel Code; Section V;
prior to use or measurement of the Article 6 – Liquid Penetrant
intensity of the ultraviolet light Examination
emitted.
#3: Does not address a specific time in 2010 ASME Boiler & Pressure
Article 6 regarding time that a black Vessel Code, 2011a Addenda,
light (UV-A source) is to be on before July 1, 2011 - V Nondestructive
evaluation of intensity. Examination - Article 6 - Liquid
Penetrant Examination
#4: Black lights shall be energized for T.O. 33B-1-1 Air Force
15 minutes before inspection is Technical Manual (change 2,
performed. (6-369) 1990) – Nondestructive
Inspection Methods, Chapter 6
15
#5: Ultraviolet Radiation (pg 45) - ASNT Personnel Training
When using mercury vapor lamps, the Publications (PTP) - Liquid
full intensity of the lamp is not Penetrant Testing Classroom
attained until the mercury arc is Training Book - First Printing
sufficiently heated. At least 5 min January 2005
warm up is required to reach the
required arc temperature.
#7: When black light is used during P.S. 21202 Rev R (1993)
inspection, allow the bulb to warm up McDonnel Douglas Liquid
for a minimum of 5 minutes prior to Penetrant Process Specification
its use – (6.7)
16
5. How long do you let your #1: The examiner should be in the ASTM E 165-95 Liquid
eyes adapt to darkness darkened area for at least 1 minute Penetrant Inspection Method.
(less than 2 fc visible before examining parts. (8.9.1.4) & Note: AWS D1.1-92 (Chapter 6 –
light) prior to inspecting (7.1.8.4) Inspection) and API Standard
a part under black light? 1104 (Section 8.3) states that E
165 shall be used for PT
applications/procedure.
ASTM E 1219-94 Standard Test
Method for Fluorescent Liquid
Penetrant Examination Using the
Solvent-Removable Process
17
#4: Examiners shall be in a darkened 2010 ASME Boiler & Pressure
area for at least Vessel Code, 2011a Addenda,
5 min prior to performing July 1, 2011 - V Nondestructive
examinations to enable their Examination - Article 6 - Liquid
eyes to adapt to dark viewing. Glasses Penetrant Examination
or lenses worn by
examiners shall not be photosensitive.
(T-676.4[b])
18
#8: Allow a minimum of 1 minute for P.S. 21202 Rev R (1993)
dark adaption of the eyes when McDonnel Douglas Liquid
inspecting with fluorescent penetrant. Penetrant Process Specification
(6.7)
6. How long do you let a #1: The length of time the developer ASTM E 165-95 Liquid
developer (after drying) is to remain on the part prior to Penetrant Inspection Method.
dwell on part prior to examination should be not less than Note: AWS D1.1-92 (Chapter 6 –
inspection? 10 min. The maximum permitted Inspection) and API Standard
developing times are 2 hr for aqueous 1104 (Section 8.3) states that E
developers and 1 hr for nonaqueous 165 shall be used for PT
developers. (8.8.6) (7.1.7.6) (7.1.7.2) applications/procedure.
19
ASTM E 1219-94 Standard Test
Method for Fluorescent Liquid
Penetrant Examination Using the
Solvent-Removable Process
ASTM E 1220-92 Standard Test
Method for Visible Liquid
Penetrant Examination Using the
Solvent-Removable Process.
20
Nonaqueous Developers - Unless
otherwise specified, the minimum and
maximum development times for
nonaqueous developers are 10 min
and 1 h respectively. For nonaqueous
suspendable developer, the developer
container shall be frequently agitated
between applications. (7.5.2)
Aqueous Developer - Aqueous
soluble developers shall not be used
with Type II penetrants or Type I,
Method A penetrants. Aqueous
suspendable developers can be used
with both Type I and Type II
penetrants. Minimum and maximum
development times, after the
component is dry, are 10 min and 2 h.
(7.5.3)
21
Maximum developer dwell times are:
Nonaqueous developer – 30 minutes;
Aqueous developer – 1 hour; and Dry
developer – 2 hours. (6-350)
22
#7: No Change - same as above. MIL-HDBK-728/3 (NOTICE 1),
MILITARY HANDBOOK:
LIQUID PENETRANT
TESTING (01 JUL 1992), MIL-
HDBK-728/3, dated 16 December
1985, has been reviewed and
determined to be valid for use in
acquisition.
#8: Apply dry and nonaqueous wet P.S. 21202 Rev R (1993)
developers within 1 hour after the McDonnel Douglas Liquid
completion of the drying operation Penetrant Process Specification
that follows removal of excess (Amendment No. 1 – Issued 04
penetrant. (6.6.1 & 6.6.2)…Times are May, 1994)
given in Table V (page 21). The
minimum time is 10 minutes and a
maximum time of 60 minutes, except
dry developer, a maximum time of 4
hours.
23
#10: Developing Time: In general, 10 ASM Handbook, Volume 17,
min is the recommended minimum Nondestructive Evaluation and
developing time regardless of the Quality Control
developer form used. (pg 83)
7. What are the dimensions #1: Not Addressed ASTM E 165-95 Liquid
and material composition Penetrant Inspection Method.
of penetrant test Note: AWS D1.1-92 (Chapter 6 –
panels/blocks and their Inspection) and API Standard
purpose? 1104 (Section 8.3) states that E
165 shall be used for PT
applications/procedure.
ASTM E 1219-94 Standard Test
Method for Fluorescent Liquid
Penetrant Examination Using the
Solvent-Removable Process
ASTM E 1220-92 Standard Test
Method for Visible Liquid
Penetrant Examination Using the
Solvent-Removable Process.
24
developer and appropriate processing
parameters. The resulting indications
will then be compared to the
indications obtained using unused
penetrant, emulsifier (if used) and
developer.
Known Defect Standard - The
known defect standard used shall be
approved by the cognizant
engineering organization. (7.8.3.1)
25
#5: System performance testing (6- T.O. 33B-1-1 Air Force
469) – The test panels used by the Air Technical Manual (change 2,
Force are made from 0.079 inch thick 1990) – Nondestructive
brass plate 3.94 inches long and 2.80 Inspection Methods, Chapter 6
inches wide. A nickel plating is
applied to the brass plate to a
predetermined thickness, then flashed
or plated with a thin layer of
chromium to protect it against
tarnishing.
Sensitivity (6-196) – The test panels
for penetrants of sensitivity Level I –
Low, are thermally cracked aluminum
blocks. The test panels for the rest of
the sensitivity levels are a series of
Titanium and Nickel alloy panels. –
Therefore, non-qualification
comparison tests are accomplished
with cracked chrome plated panels.
26
two panels are provided as a set with
each panel measuring 3.94-inches
(100 mm) long and 1.38-inches (35
mm) wide. Panels are typically
available with cracks of 10, 20, 30,
and 50 microns. The 30 and 50-
micron panels are most often used
with low and medium sensitivity
penetrants. The 10 and 20-micron
panels are usually used with high and
ultra-high sensitivity penetrants. The
standard panel is the 20-micron panel.
(2.6.7.2)
27
available in 10, 20, 30 and 50 microns
(0.0004, 0.0008, 0.0012, 0.002 inch)
flaw depth.
#8: Test panels for measuring wash- P.S. 21202 Rev R (1993)
ability shall be in accordance with McDonnel Douglas Liquid
MIL-I-25135. Test panels for Penetrant Process
determining sensitivity shall be in
accordance with MIL-I-25135 and
shall be chrome plated test panels
containing fine crack pattern suitable
for evaluation of penetrant sensitivity.
Cracks may be in a starburst or
parallel line pattern. (Commercial
sources) (3.3)
28
Note: No specific dimensions or
material compositions of standards are
specified.
29
#10: Three-inch lengths are cut from a ASNT Nondestructive Testing
3/8 X 2 inch bar of 2024 aluminum Handbook (Vol I, Section 6) –
alloy. The block is heated at least 4 Edited by Robert C. McMaster -
minutes to obtain a temperature of Copyright 1959
525°C (977°F), then quenched in cold
water (50°F or under), thus producing
cracks I the aluminum alloy (7-26).
Use cracked aluminum-alloy blocks in
controlling the uniformity of a
penetrant-materials system, used
materials are supplied to half the
block and control materials are
applied to the other half for direct
visual comparison of crack pattern
results. (7-27)
30
with cracks about 2 to 3 µm (8 x 10-5
in. to 1.2 x 10-4 in.) wide and 40 µm
(0.0016 in.) deep; and fine crack
panel with cracks about 0.5 µm (2 x
10-5 in.) in width. (pg 254)
8. How are penetrants #1: Type I – Fluorescent Penetrant ASTM E 165-95 Liquid
classified? Examination Penetrant Inspection Method.
Method A – Water-washable Note: AWS D1.1-92 (Chapter 6 –
Method B – Post-emulsifiable, Inspection) and API Standard
Lipophilic 1104 (Section 8.3) states that E
Method C – Solvent removable 165 shall be used for PT
Method D – Post-emulsifiable, applications/procedure.
hydrophilic
Type II – Visible Penetrant
Examination
Method A – Water-washable
Method C – Solvent Removable
Methods:
31
Sensitivity:
Sensitivity Level ½ - Very Low
Sensitivity Level 1 – Low
Sensitivity Level 2 – Medium
Sensitivity Level 3 – High
Sensitivity Level 4 – Ultrahigh
Method:
Method A—Water washable.
Method B—Post-emulsifiable,
lipophilic.
Method C—Solvent-removable.
Method D—Post-emulsifiable,
hydrophilic.
32
Form d—Nonaqueous for Type I
fluorescent penetrant.
Form e—Nonaqueous for Type II
visible dye.
Form f—Specific application.
Methods:
Method A – Water washable
Method B – Post emulsifiable,
lipophilic
Method C – Solvent removable
Method D – Post emulsifiable,
hydrophilic
Sensitivity:
Sensitivity Level 1 – Low
Sensitivity Level 2 – Medium
Sensitivity Level 3 – High
Sensitivity Level 4 - Ultrahigh
33
#5: Equipment - The term penetrant 2010 ASME Boiler & Pressure
materials, as used in this Article, is Vessel Code, 2011a Addenda,
intended to include all penetrants, July 1, 2011 - V Nondestructive
emulsifiers, solvents or Examination - Article 6 - Liquid
cleaning agents, developers, etc., used Penetrant Examination
in the examination
process. The descriptions of the liquid
penetrant classifications and material
types are provided in SE-165 of
Article 24. SE-165 is basically a copy
of ASTM E 165-09.
34
Method B - Post Emulsifiable,
Lipophilic
Method C - Solvent Removable
Method D - Post Emulsifiable,
hydrophilic
Method E - Water-Washable, Water
Based
Sensitivity Level
Sensitivity Level 1/2 - Ultra Low
Sensitivity Level 1 - Low
Sensitivity Level 2 - Medium
Sensitivity Level 3 - High
Sensitivity Level 4 - Ultrahigh
Note: Sensitivity levels established for
Type 1 penetrants only
Developers
Form a - Dry Developer
Form b - Water Suspendable
Developer
Form c - Water Suspendable
Developer
Form d - Non aqueous Type 1
Developer Fluorescent
Form e - Non Aqueous Type 2
Developer
Form f - Special Applications
Form g - No Developer
Solvent Removers
Class 1 - Halogenated
Class 2 - Non-halogenated
Class 3 - Special Application
Sensitivity Level ½
Sensitivity Level 1 – Low
Sensitivity Level 2 – Medium
Sensitivity Level 3 – High
Sensitivity Level 4 – Ultrahigh
35
classifications for types II and III
systems. Sensitivity level ½ applies
only to some Method A, Type I
systems.
36
special solvents and post-
emulsification penetrants.) (6-2_
9. What are the dwell times #1: The length of time the penetrant ASTM E 165-95 Liquid
for penetrant after it has must remain on the part to allow Penetrant Inspection Method.
been applied? proper penetration should be as Note: AWS D1.1-92 (Chapter 6 –
recommended by the penetrant Inspection) and API Standard
manufacture. Table 2 (a guide) gives 1104 (Section 8.3) states that E
minimum penetrant dwell times for 165 shall be used for PT
different materials from 5 minutes to applications/procedure.
10 minutes (8.5.2)
#3: The dwell time, unless otherwise ASTM E 1417-95a Practice for
specified, shall be a minimum of 10 Liquid Penetrant Examination
minutes. For dwell times greater than
2 hours, the penetrant shall be
37
reapplied as required to prevent
drying. (7.2.1)
#6: The minimum dwell time for T.O. 33B-1-1 Air Force
service-induced defects shall not be Technical Manual (change 2,
less than 30 minutes. There is one 1990) – Nondestructive
exception to this requirement. When Inspection Methods, Chapter 6
stress corrosion is suspected the
minimum dwell time shall not be less
than 240 minutes. These established
dwell times are based on parts having
a temperature of 60°F to 100°F.
38
#6: The minimum dwell time for TO 33B-1-1
service-induced defects SHALL NOT NAVAIR 01-1A-16-1
be less than 30-minutes, unless TM 1-1500-335-23
otherwise specified by a specific part Technical Manual --
procedure. Nondestructive Inspection
Most dwell times are based on past Methods, Basic Theory - 15
experience with similar parts, October 2016
materials and potential flaws. The
minimum penetrant
dwell time that SHALL be used is
provided in (Table 2-2). Minimum
penetrant dwell times for
manufacturing induced defects
SHALL be as specified by ASTM E
1417 or as specified by specific
technical directive or procedures.
(2.4.7.4.2)
39
#9: 6.4 – Use the applicable P.S. 21202 Rev R (1993)
minimum penetrant dwell time listed McDonnel Douglas Liquid
in Table V (the maximum dwell time Penetrant Process
is 75 minutes for steel weldments and (Amendment No. 1 – Issued 04
60 minutes for all other cases). Table May, 1994)
V states minimum dwell times to be
between 2 and 30 minutes with
applicable notes #1 - #6. (page 3 –
amendment1)
40
both fluorescent and visible penetrants
types. (pg 82)
10. When removing excess #1: Method A: The temperature of the ASTM E 165-95 Liquid
penetrant (Method A, B water should be relatively constant Penetrant Inspection Method.
& D) with a manual and should be maintained with the Note: AWS D1.1-92 (Chapter 6 –
water spray procedure, range of 50 to 100°F. The rinse time Inspection) and API Standard
what parameters should not exceed 120 seconds unless 1104 (Section 8.3) states that E
(temperature, pressure, otherwise specified by part or material 165 shall be used for PT
distance, etc.) should be specification. The spray-rinse water applications/procedure.
observed? pressure should not be greater than 40
PSI. (8.6.1.1)
41
[172 kPa]. (8.6.1.1)
42
instructions.
43
#5: Method A Process—Water- ASTM E1417/E1417M-16
washable penetrants shall be removed Standard Practice for Liquid
with a manual or automated water Penetrant Testing
spray, or a manual wipe, or an air
agitated immersion wash. (7.3.1)
Manual Spray—For handheld spray
guns water pressure adequate to
remove the penetrant shall be used but
shall not exceed 40 psi [275 kPa].
Water temperature shall be between
50 to 100°F [10 to 38°C]. When
hydro-air nozzles are used the air
pressure shall not exceed 25 psi [172
kPa]. A coarse spray shall be used
with a minimum distance of 12 in. [30
cm], when possible between the spray
nozzle and the part. (7.3.1.1)
Automated Spray - For automated
spray systems, the wash parameters
shall be such that the requirements of
7.8.3 are met. Water temperature shall
be maintained between 50 to 100°F
[10 to 38°C]. (7.3.1.2)
Immersion - Immersion wash may be
utilized if the water is air agitated and
good circulation is maintained
throughout the wash operation. Water
temperature shall be maintained
between 50 and 100°F [10 and 38°C].
(7.3.1.4)
Method B Process—Lipophilic post-
emulsifiable penetrant shall be
removed by air agitated water
immersion or with a water spray or
hydro-air spray rinse after application
of an emulsifier and an appropriate
emulsifier dwell time. Water pressure
and temperature and air pressure shall
meet the requirements specified in
7.3.1.1, 7.3.1.2, and 7.3.1.4. (7.3.2)
Method D Process—Hydrophilic
post emulsifiable penetrant shall be
removed with a water prerinse,
application of the hydrophilic
emulsifier and then a postrinse.
Rinse—The water prerinse shall be
applied for the minimum amount of
time required to achieve removal of
the bulk surface penetrant. The rinse
parameters of 7.3.1.1 or 7.3.1.2 shall
apply. (7.3.4.1)
44
Postrinse—After the application and
dwell of the hydrophilic emulsifier,
the component being examined shall
be rinsed with water. The spray rinse
parameters of 7.3.1.1, 7.3.1.2, and
7.3.1.4 shall apply. (7.3.4.3)
45
Hot water, 120°F or above shall not
be used. (6-264) A spray angle,
generally of 45 degrees to 70 degrees
is most effective. (6-265) Washing of
fluorescent penetrant shall be done
under a black light in a semi-darkened
area and the washing stopped when a
low background level is reached. (6-
266)
Method D: Pre-Rinse – The cycle
shall be a coarse spray of plain water
for 30 to 120 seconds, at a pressure as
low as practically possible not to
exceed 40 PSIG, with a water
temperature of 55°F to 100°F. (6-293)
Post-Rinse – The cycle shall be a
plain water spray of 30 to 60 seconds
duration, at a line pressure of 10 to 35
PSIG, and with the water at ambient
temperature of 55°F to 100°F. Rinsing
of fluorescent penetrants shall be
accomplished under black light. (6-
305)
46
(10 C) to 100 F (38 C).
Where possible, the spray nozzle
SHALL be held a minimum of 12
inches from the part surface. The total
rinse time SHALL NOT exceed 120-
seconds.
47
Method B: Remove the emulsifier
with water spray or immersion
equipment. Effective rinsing has been
accomplished when black light are
used – (6.5.2.1)
Method D: May be rinsed with a clear
water spray prior to emulsification to
remove part of the penetrant. The
water temperature must be between
50°F and 100°F and the pressure must
be 40 PSI or less. The rinse time shall
not exceed one minute. (6.5.2.1 note)
48
or 50°F) may reduce the ease with
which penetrants can be rinsed off the
test parts. Some manufacturers of
liquid penetrants recommend elevated
rinse temperatures of 30 to 45°C (or
90 to 110°F).[Page 50]
Aerospace: (Method A) - Water
pressure adequate to remove the liquid
penetrant shall be used but shall not
exceed 275 kPa (40 lbf in.-2). Water
temperature shall be between 10 to
38°C (50 to 100°F). When hydro air
nozzles are used the air pressure shall
not exceed 172 kPa (25 lbf in.-2). A
coarse spray shall be used with a
minimum distance of 300 mm (12 in.),
when possible between the spray
nozzle and the part. (page 383)
11. What personnel safety #1: Scope: (1.5) This standard does ASTM E 165-95 Liquid
equipment (if any) is not purport to address all of the safety Penetrant Inspection Method.
required when problems, if any, associated with its Note: AWS D1.1-92 (Chapter 6 –
performing the penetrant use. It is the responsibility of the user Inspection) and API Standard
method of inspection? of this standard to establish 1104 (Section 8.3) states that E
appropriate safety and health practices 165 shall be used for PT
and determine the applicability of applications/procedure.
49
regulatory limitations prior to use. For
specific hazard statements, see
notes…
NOTE: There is no direct reference to
using safety equipment (i.e., neoprene
gloves, apron, eye protection) when
handing penetrant materials.
50
#6: Same as MIL-STD-6866 ASME (1992) Boiler and
Pressure Vessel Code; Section V;
Article 6 – Liquid Penetrant
Examination
51
1985, has been reviewed and
determined to be valid for use in
acquisition.
52
health and
a safety. T
Testing - Editor - Patrickk O.
M
Moore - Copyyright 2000
53