Nutzen Jaipur Site Erection BOP MS - SS Job

Sr No Description of job Category UOM


A Genset - Exhaust Line
1 Exhaust Silencer with bellow Equipment Kg
2 Exhaust Pipe Laying (250 mm dia) MS Lay inch/dia /rm
3 Exhaust Pipe Fabrication MS Fab inch/dia /no
4 Structural Materail (Erection, Welding, clamping) Structure kg
5 Painting (Pipe and structure) Paint Sq ft
6 Exhaust Pipe cladding with Silencer Insulation RM
B Genset - Cooling Circuit
1 MS Pipe laying MS Lay inch/dia /rm
2 MS Pipe fabrication MS Fab inch/dia /no
3 Structural Materail (Erection, Welding, clamping) Structure kg
4 HT Pump Equipment kg
5 HT PHE Install Equipment Kg
6 LT pump Equipment Kg
7 LT PHE Equipment Kg
8 Cooling Tower Equipment Kg
9 Cold Water Pump Equipment Kg
10 Radiator Equipment Kg
11 HT Expansion Tank Equipment Kg
12 LT Expansion Tank Equipment Kg
13 Cooling water pump Equipment Kg
14 DM Water Pump Equipment Kg
15 DM water tank Equipment Kg
16 PHE Hot water Pipe cladding Insulation RM
17 Painting (Pipe and structure) Paint Sq ft
C Genset - Wet Ventilation
1 Painting (Pipe and structure) Wet ventilation Paint Sq ft
D Genset -Gas Ckt
1 SS Pipe laying SS Lay inch/dia /rm
2 SS Pipe fabrication SS Fab inch/dia /no
3 Structural Materail (Erection, Welding, clamping) Structure kg
4 Gas Train Equipment kg
5 Chiller with water pipe Equipment kg
6 Dehumidifier with water pipe Equipment kg
7 Painting (Pipe and structure) Paint Sq ft
E Genset - Lube Oil Ckt
1 Lube Oil Tank and pipe Equipment kg
2 Structural Materail (Erection, Welding, clamping) Structure kg
3 Painting (Pipe and structure) Paint Sq ft
F Panel Erection
1 Genset MCC Panel Incuding IO Equipment Kg
2 Genset AGS panel Equipment Kg
3 Genset syn panel Equipment Kg
4 Gas Analyser Equipment Kg
5 Flowmeter Equipment Kg
6 EJB Installation Equipment Kg
G Sludge Heating System
1 MS Pipe laying MS Lay inch/dia /rm
2 MS Pipe fabrication MS Fab inch/dia /no
3 Structural Materail (Erection, Welding, clamping) Structure kg
4 Hot water Pump Equipment kg
5 Hot water Pipe cladding Insulation RM
6 Painting (Pipe and structure) Paint Sq ft
H H2 S Scrubbing Plant
1 SS Pipe laying - Air Circulation SS Lay inch/dia /rm
2 SS Pipe fabrication SS Fab inch/dia /no
3 MS Pipe laying MS Lay inch/dia /rm
4 MS Pipe fabrication MS Fab inch/dia /no
5 SS Pipe laying - Srubber column to bio reactor SS Lay inch/dia /rm
6 SS Pipe fabrication SS Fab inch/dia /no
7 Structural Materail (Erection, Welding, clamping) Structure kg
8 Painting (Pipe and structure) Paint Sq ft
9 Scrubber Column Equipment kg
10 Settling tank Equipment kg
11 Caustic day tank Equipment kg
12 Nutrient tank Equipment kg
13 Air cooler (Heat exchanger) Equipment kg
14 Air Blower (2 No) Equipment kg
15 Sludge pump (2 No) Equipment kg
16 ST Feed Pump (2No) Equipment kg
17 Recirculation pump (2 No) Equipment kg
18 Caustic dosing pump (2 No) Equipment kg
19 Caustic transfer pump (2 No) Equipment kg
20 Valves Equipment Nos
21 NRV Equipment Nos
22 Spray nozzles Equipment kg
23 Defuser Equipment kg
24 Gauges socket provision with valve Equipment Nos
25 Drain points as per P&ID Equipment Nos
26 pH, ORP, Cond Socket provision Equipment Nos
27 Flowmeter meter installation (3 No) Equipment kg
28 Scrubber Level gauge Equipment kg
29 Scrubber MCC Panel Equipment kg
30 PLC Panel Equipment kg
I Unit II Digester
1 DI Pipe laying DI Lay kg
2 DI Pipe fabrication DI Fab inch/dia /no
3 Sludge Mixing unit Equipment kg
4 MS Pipe laying MS Lay inch/dia /rm
5 MS Pipe fabrication MS Fab inch/dia /no
6 SS Pipe laying SS Lay inch/dia /rm
7 SS Pipe fabrication SS Fab inch/dia /no
8 Sludge Heat exchanger Equipment kg
9 Ejector Equipment kg
10 Structural Materail (Erection, Welding, clamping) Structure kg
11 Knife Gate valve Equipment kg
12 Safety Spool piece Equipment kg
13 PVRV Equipment kg
14 Flame Arrester Equipment kg
15 Telescope Equipment kg
16 Manometer Equipment kg
17 300 NB Agitator Installation(Total 8 Nos having weight 220 kg each) Equipment kg
18 Mechanical Seal Pot Equipment kg
19 Painting (Pipe and structure) Paint Sq ft
J Unit III Digester
1 DI Pipe laying DI Lay inch/dia /rm
2 DI Pipe fabrication DI Fab inch/dia /no
3 MS Pipe laying MS Lay inch/dia /rm
4 MS Pipe fabrication MS Fab inch/dia /no
5 Structural Materail (Erection, Welding, clamping) Structure kg
6 DI Pipe laying DI Lay inch/dia /rm
7 DI Pipe fabrication DI Fab inch/dia /no
8 DI Pipe laying DI Lay inch/dia /rm
9 DI Pipe fabrication DI Fab inch/dia /no
10 DI Pipe laying DI Lay inch/dia /rm
11 DI Pipe fabrication DI Fab inch/dia /no
12 DI Pipe laying DI Lay inch/dia /rm
13 DI Pipe fabrication DI Fab inch/dia /no
14 Telescopic valve Equipment kg
15 Sludge Mixing unit Equipment kg
16 DI Pipe laying DI Lay inch/dia /rm
17 DI Pipe fabrication DI Fab inch/dia /no
18 DI Pipe laying DI Lay inch/dia /rm
19 Sludge Heat exchanger Equipment kg
20 Ejector Equipment kg
21 Structural Materail (Erection, Welding, clamping) Structure kg
22 Painting (Pipe and structure) Paint Sq ft
23 Knife Gate valve Equipment kg
24 Safety Spool piece Equipment kg
25 PVRV Equipment kg
26 Flame Arrester Equipment kg
27 Manometer Equipment kg
28 300 NB Agitator Installation(Total 8 Nos having weight 220 kg each) Equipment kg
29 Mechanical Seal Pot Equipment kg
K Biogas line
1 Structural Materail (Erection, Welding, clamping) Structure kg
2 Painting (Pipe and structure) Paint Sq ft
3 Raw Gas Blower (2Nos) Equipment kg
4 Swet gas Blower (3 No) Equipment kg
5 Flaring unit (Burner) Equipment kg
6 Flaring panel Equipment kg
7 Flaring unit structure Equipment kg
8 Painting (Pipe and structure) Flaring Structure Paint Sq ft

Note: Manpower Insurance is Vendor Scope


Travel and Stay arrangements is Vendor Scope
Tools - Tacketls and Safety equipments/Gear required for the job are Vendor scope
Welding Rod, Cutting Wheel, Grinding Wheel, Driing Bit Emery if required is vendor scope.
Hydro test as per system pressure requirement is Vendor Scope

….
ection BOP MS - SS Job - Unit II and Unit III
Quantity Rate/Qty Total Cost Ramarks

900
280
192
837 L Angle 75 x 75 x 5 (120 Mtrs) and MC 75 (20 mtrs)
81
33

536.5
1186.5 Included 3" pipe joint (4 No), Joints included 1.25" in 1.5"
771.2 MC150=1.6m, MC75=15m, ML50x50x5=10m, MC100=60m(Skid)
140
246
66
50
250 Included Cooling tower fan
630
1600
100
60
240
40
30
25
1431 87 Sqm (L75)+18m(C75)+9m (HT)+11.75m(LT)+5m(LT)+2.42m(DM)

7.53 0.7Sqm

15
42
436 MC75=30m, MC150=6m, MB200=5m
340
200
550
178 9sqm+3.6+2.91.05

52
65 L50 x L50 x 5
140+13.5 13sqm+1.25sqm

800
500
2000
50
10
20

2220
190
165
456
280
129 2x6sqm

51
51
84
324
35
56
1004 Given by TG
437.21 5.25Sqm+1.4sqm+0.7sqm (Pipe)+20.32sqm+5sqm
10000
5000
30
30
321
580
214
214
724
80
214
200
22
8.996
18.4
100 15NB x 100
37 1" x37
3
50
50
400
400

364
0
80
168
672
60 Gas line inner side
96 Gas line inner side
840
720
288 0
786
40
80
50
50
5
1760
80
336.9 31.3Sqm

392 Ejector discharge


0
392
672
288
720 Suction recirculation
0
120 Feeding line
0
180 Bleed off line
0
60 Telescopic line
0
30
80
180 Gas line inside the Digester
0
162 Samplint Point
840
720
288
360.59 33.5sqm
786
40
80
50
5
1760
80

744.7832
At Actual
620
645
160
30
121
398.2 37Sqm
+2.42m(DM)
72