Nutzen Jaipur Site Erection BOP MS - SS Job - Unit II and Unit III
Nutzen Jaipur Site Erection BOP MS - SS Job - Unit II and Unit III
Nutzen Jaipur Site Erection BOP MS - SS Job - Unit II and Unit III
….
ection BOP MS - SS Job - Unit II and Unit III
Quantity Rate/Qty Total Cost Ramarks
900
280
192
837 L Angle 75 x 75 x 5 (120 Mtrs) and MC 75 (20 mtrs)
81
33
536.5
1186.5 Included 3" pipe joint (4 No), Joints included 1.25" in 1.5"
771.2 MC150=1.6m, MC75=15m, ML50x50x5=10m, MC100=60m(Skid)
140
246
66
50
250 Included Cooling tower fan
630
1600
100
60
240
40
30
25
1431 87 Sqm (L75)+18m(C75)+9m (HT)+11.75m(LT)+5m(LT)+2.42m(DM)
7.53 0.7Sqm
15
42
436 MC75=30m, MC150=6m, MB200=5m
340
200
550
178 9sqm+3.6+2.91.05
52
65 L50 x L50 x 5
140+13.5 13sqm+1.25sqm
800
500
2000
50
10
20
2220
190
165
456
280
129 2x6sqm
51
51
84
324
35
56
1004 Given by TG
437.21 5.25Sqm+1.4sqm+0.7sqm (Pipe)+20.32sqm+5sqm
10000
5000
30
30
321
580
214
214
724
80
214
200
22
8.996
18.4
100 15NB x 100
37 1" x37
3
50
50
400
400
364
0
80
168
672
60 Gas line inner side
96 Gas line inner side
840
720
288 0
786
40
80
50
50
5
1760
80
336.9 31.3Sqm
744.7832
At Actual
620
645
160
30
121
398.2 37Sqm
+2.42m(DM)
72