Experimental Investigation of Load-Bearing Mechanism of Underwater Mined-Tunnel Lining

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Journal of

Marine Science
and Engineering

Article
Experimental Investigation of Load-Bearing Mechanism of
Underwater Mined-Tunnel Lining
Zhiqiang Zhang 1,2, * , Binke Chen 1,2 and Qingnan Lan 1,2

1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China;


Becker91910315@gmail.com (B.C.); lqn0929@gmail.com (Q.L.)
2 Key Laboratory of Transportation Tunnel Engineering, Southwest Jiaotong University, Ministry of Education,
Chengdu 610031, China
* Correspondence: clark@swjtu.edu.cn; Tel.: +86-02887601573

Abstract: A series of model tests were performed to investigate the load-bearing mechanism of a
mined railway tunnel lining under water pressure. To investigate the load-bearing characteristics of
different types of linings, a fully closed water pressure exerting device for a noncircular section tunnel
was invented. A large-scale model test (1:30) under combined water and soil pressures was conducted
to investigate the mechanical characteristics, deformation, stress distribution, crack development
process, and failure mode of the underwater mined-tunnel lining. The test results indicated that
for the high-speed railway tunnel of Class IV surrounding rock with a design speed of 350 km/h,
both the drainage lining and the waterproof lining were controlled by a small eccentric compression
under the two test conditions. One had only water pressure, and the other had a variable water
pressure and constant soil pressure. The key sections for controlling instability were the bottom of
the wall and the inverted arch. The ultimate water head of the drainage lining was 49 m, and the
 ultimate water head of the waterproof lining was 78 m. In comparison with the drainage lining,
 the waterproof lining could significantly improve the water-pressure resistance. Thus, design loads
Citation: Zhang, Z.; Chen, B.; Lan, Q. of 30 and 60 m are recommended for the drainage and waterproof lining structures, respectively.
Experimental Investigation of
Load-Bearing Mechanism of Keywords: underwater tunnel; drainage lining; waterproof lining; model test; mechanical characteristics
Underwater Mined-Tunnel Lining. J.
Mar. Sci. Eng. 2021, 9, 627.
https://doi.org/10.3390/jmse9060627

1. Introduction
Academic Editor: José A. F. O. Correia
Developed countries in the world have been building underwater tunnels continuously
since the 1930s. So far, the countries with underwater tunnels mainly include Japan, Norway,
Received: 9 May 2021
Accepted: 1 June 2021
Denmark, Britain, France, and China. Some of the famous projects are the Seikan Tunnel
Published: 4 June 2021
in Japan, the Channel Tunnel between Britain and France, the Channel Tunnel in Norway,
the Xiang’an Tunnel in Xiamen, and the Shiziyang Tunnel in China [1–6]. Compared
Publisher’s Note: MDPI stays neutral
with the rapid development of underwater tunnel engineering, the corresponding design
with regard to jurisdictional claims in
theory has been lagging behind the engineering construction, and a series of technical
published maps and institutional affil- problems need to be solved, such as the calculation theory of tunnel lining water pressure,
iations. the distribution law of lining water pressure of different waterproof and drainage methods,
and the stress characteristics of lining structure under the combined action of soil and water
pressure [7–12]. For such problems, domestic and foreign related scholars have undertaken
a lot of research.
Copyright: © 2021 by the authors.
In Switzerland, Chabot studied the limited bearing water pressure of the waterproof
Licensee MDPI, Basel, Switzerland.
lining, and the results indicated that the waterproof lining is relatively suitable for the
This article is an open access article
water head range of 30–60 m. Thus, the lower limit of the water head is 30 m, and the
distributed under the terms and upper limit is 60 m. For a tunnel whose water head is >60 m, a drainage system must be
conditions of the Creative Commons installed for reducing the water pressure in the lining structure [13]. In Finland, Lipponen
Attribution (CC BY) license (https:// et al. examined the effects of geological factors on the long-term stability of rock cracks in a
creativecommons.org/licenses/by/ rich water tunnel and recommended a special supporting method for such conditions [14].
4.0/). In Turkey, Mustafa Ayhan et al. investigated the Dicle–Kralkizi tunnel, which has a high

J. Mar. Sci. Eng. 2021, 9, 627. https://doi.org/10.3390/jmse9060627 https://www.mdpi.com/journal/jmse


J. Mar. Sci. Eng. 2021, 9, 627 2 of 20

water pressure. They studied the main factors related to the over-breaking and surface
settlement, which affect the stability of the surrounding rock, and analyzed the relationship
between the excavation speed and the tunnel stability [15]. Jin-Hung Hwang examined
the seepage characteristics of a tunnel via two- and three-dimensional (3D) numerical
simulations [16]. Wang et al. proposed a lining structure based on controlled drainage.
Analyses, numerical simulations, and modeling tests revealed that a grouting circle can
significantly reduce the water pressure behind the lining structure. The optimal radius
of the grouting circle was proposed [17]. For a multiple-arch tunnel and a small-distance
tunnel, Li et al. adopted a fluid–solid coupled approach to obtain the distributions of
the seepage field and pore water pressure [18]. Fernandez et al. studied the impact of
tunnel excavation on the water flow field around the tunnel structure. They reported that
changes in the permeability coefficient of the surrounding rock directly affect the amount
of water discharged during excavation and the stability of the surrounding rock. However,
the interaction between the seepage field and the soil stress is not fully understood [19].
Moon and Jeong studied the effects of geological characteristics and the joint spacing
distribution of the tunnel site on the seepage field and water discharge. It was concluded
that geological characteristics were among the major factors causing the water burst of
the tunnel [20]. Hund-Der Yeh et al. summarized several closed-form, semi-empirical,
numerical, and other related analysis methods for vertical-well water simulation and appli-
cations to underground engineering [21]. Wang et al. studied a diversion tunnel across a
slope via a 3D numerical simulation and examined a series of uncertainty problems caused
by the flood discharge tunnel, such as the effect of the stability and various mechanical
properties [22]. Li and Zhou adopted the hyperstatic reaction method to study the me-
chanical performance and section optimization of a lining structure. The optimized section
significantly improved the mechanical characteristics of the lining structure and reduced
the lining deformation [23]. Fang et al. developed a simulation test device for determining
the external water pressure of a tunnel lining according to the pressure difference between
the inside and outside of the tunnel structure model and studied the mechanical character-
istics of a large-section highway tunnel lining structure under external water pressure [24].
Li et al. analytically investigated the undrained responses for deep circular tunnels with
reinforcement in saturated ground. An idealized model of an axisymmetric tunnel with
an initial hydrostatic stress field was proposed [25]. To study the structural response of
the tunnel lining in the loess region in a local hydrodynamic environment, experimental
testing at 1 g and a numerical simulation were performed by Qiu et al., and the results
were verified and found to be in good agreement [26]. Guo et al. studied the mechanical
characteristics of shield tunnel structures under the combined action of soil and water
through a series of model tests. They concluded that under the action of a high internal
water pressure, structural cracks first appeared at the hance of secondary lining and then
at the vault and arch bottom [27].
Literature reviews on the water pressure around tunnel structures have indicated that
the research on tunnel seepage model tests is in the initial stage, and few studies have been
performed in which the mechanism of the support system in the construction and operation
stages was simulated with consideration of the water–soil coupling action [28–35]. Tunnel
excavation causes redistribution of the initial stress and seepage fields in the surrounding
rock and soil. Changes in the seepage lead to changes in the stress field, and changes in the
stress field change the surrounding rock, affecting the seepage characteristics [36–43]. Hence,
the interaction between the surrounding rock and the support structures is complex, owing
to the interaction between the stress and the seepage field. This is a coupled process that is
difficult to model and poses a threat to the lining structure, as the combined loading from
water pressure and soil pressure can exceed the design capacity. Under the combination of
water and soil pressures, the stability of the surrounding rock is reduced, and the forces
acting on the support structures are increased. In severe cases, catastrophic accidents can
occur, such as tunnel collapse, mud burst, and water inrush [44–50]. Thus, in the present
study, to obtain the stress distribution law of the support structure under the influence of
J. Mar. Sci. Eng. 2021, 9, 627 3 of 20

external water pressure during the construction and operation of a high-stress water-rich
tunnel, a model test system capable of simultaneously considering the water and soil
pressures was developed. The water effect is simulated indirectly using the hoop loading
method according to the principle of mechanical equivalence. Models are constructed using
similar materials to study the stress evolution process, progressive failure characteristics,
and most unfavorable stress sections and failure modes of the tunnel main structure under
water and soil pressures. In particular, obtaining the limit indices for waterproof and
drainage tunnels to withstand external water pressure can provide a basis for the safety
design and construction-scheme selection of the underwater tunnel support structures,
which has practical significance and considerable theoretical value.

2. Materials and Methods


2.1. Description of Project
The Liuyanghe Tunnel is a controlling project for the Wuhan–Guangzhou Passenger
Dedicated Line. It is located in the east of Changsha City and crosses the Niujiaochong
Interchange between the Beijing–Zhuhai Expressway and the Changyong Expressway,
the dense plant area of Xingsha Town, Yuanda Road, Changsha City, People’s East Road,
Liuyang River, and Airport Expressway; it exits the ground in Lituo Township and ends at
the new Changsha Station, as shown in Figure 1. The tunnel ground structure is complex,
and its exposed strata are mainly quaternary artificial fill, silty clay, sandy gravel stratum,
Cretaceous argillaceous sandstone, conglomerate, sandstone, and calcareous sandstone.
From top to bottom, the groundwater of the tunnel comprises loose rock pore water, clastic
rock pore fissure water, and clastic rock pore fissure–karst cave water. The fault structure
of the tunnel site area is not developed, and there are no large faults. However, there are
factors such as uneven weathering, an uneven lithology, and the development of karst
caves. The seismic basic intensity in this area is VI degree, and the peak acceleration of the
ground motion is divided into 0.05 g.

Figure 1. Topographic and geomorphological sketch of the study area.

The design speed of Liuyanghe Tunnel is 350 km/h, the line spacing is 5.0 m, and the
total length is 10,100 m. The tunnel consists of an open cut and buried section (including
a 1484-m-long buffer structure) at the entrance, an undercut section (7416-m-long), an
open and buried section at the exit (including a 1020-m-long buffer structure), and a
180-m-long open section of the approach road at the exit. The length of the excavation
crossing the Liuyang River is 362 m. The width of the Liuyang River, through which the
tunnel passes, is 210 m, and the absolute elevation of the riverbed across the river reaches
J. Mar. Sci. Eng. 2021, 9, 627 4 of 20

22.8–23.0 m. The elevation of the tunnel roof is 4.0–8.7 m, and the thickness of the tunnel
roof is 19.1–23.8 m. The tunnel crossing area is rich in groundwater, and the water pressure
is high. During the tunnel excavation process, disasters such as lining damage, seepage,
and high-water pressure inrush can easily occur.

2.2. Water-Pressure Loading Simulation and Principle


To investigate the stress characteristics and failure modes of different types of water-
proof lining tunnel structures, the secondary lining of the standard section of a double-track
high-speed railway tunnel of Class IV surrounding rock with a design speed of 350 km/h
was examined in this study.
There are two methods for simulating the water pressure in laboratory tests: directly
applying pressure around a scaled model and applying a similitude equivalent water
pressure based on the superposition method. Direct water-pressure application is simple
and easy; however, the whole scaled model made of plaster is soaked in water, resulting
in instability and degradation of the mechanical properties, which are derived using the
similitude law. Additionally, directly soaking the scaled model in water to apply the
water pressure affects the application of soil pressure to the scaled model, sometimes even
causing a failure to apply soil pressure in the tests. Hence, in this study, the similitude
equivalent water pressure method was adopted, and a device was developed to achieve
indirect water-pressure application.
The actual water pressure at the lining of the mountain tunnel is unevenly distributed
along the tunnel section, exhibiting a “bulb-like” distribution with a small top and a large
bottom. It is difficult to simulate the loading mode of a nonuniform water pressure in
laboratory model tests. Therefore, according to the principle of mechanical equivalence,
the method of piecewise uniform water pressure superposition was adopted to simplify
the simulation of the radial water pressure, as shown in Figure 2a.

Figure 2. Principle of equivalent water-pressure loading for noncircular cross section.

To apply a uniform water pressure in the test, several steel stranded wire hoop lining
structures were adopted to apply a water pressure to each section of the circular arch via
hoop tension, to realize complete and close loading along the model section. According to
the principle of structural mechanics, the relationship between the hoop tension and the
uniform water pressure can be determined, as shown in Figure 2b.
J. Mar. Sci. Eng. 2021, 9, 627 5 of 20

With the external radius of the lining demoted as R, the longitudinal width denoted
as B, the average compression stress acting on surface of the structure denoted as q, the
number of strands denoted as n, and the single-strand hoop tension force (which is evenly
distributed on the lining in the longitudinal direction) denoted as F, according to the
equilibrium relationship of force, we obtain:
Z α
2
2nFy = B qR sin θdθ (1)
α1

Integrating once yields


1
Fy = − BqR cos θ αα21 (2)
2n
Additionally,
q = γw H (3)
The relationship between the hoop tension force and the height of the water head is
given as follows:
1
Fy = − Bγw HR cos θ αα21 (4)
2n
Thus,
Fx = Fy × tan α1 (5)
F = Fy / cos α1 (6)
For a noncircular high-speed railway tunnel structure, the cross section mainly consists
of the top arch sections (arch crown and arch foot) and bottom arch sections (inverted arch).
Hence, the uneven water pressure acting on the tunnel structure is simplified as the evenly
distributed load acting on the top and bottom sections. Using Equations (4)–(6), the hoop
tension forces in the top part (F1 ) and bottom part (F2 ) were determined according to the
accumulations of the equivalent force acting on each arch section. The internal stress from
the simulation matched the actual water-pressure effect.

2.3. Equivalence Verification of Water-Pressure Loading Simulation


Depending on whether the secondary lining structure can withstand the water pres-
sure, lining designs can be divided into two types: waterproof and drainage. The cross-
sectional dimensions (secondary lining) of both lining types are shown in Figure 3a. To ver-
ify the equivalence of the water-pressure loading simulation, taking the waterproof-type
lining section of a 350 km/h high-speed railway tunnel as example, a finite-element model
was established for the comparative analysis of the internal lining stress between the actual
water pressure and the simulated water pressure within the depth range of 10~100 m.
The actual water pressure was applied directly to the lining (as shown in Figure 3b)
through equivalent nodal loading, and the simulated water pressure was applied through
a prestressed hoop tension load at both ends of the top and bottom sections of the lining,
as shown in Figure 3c. The hoop tension forces (x- and y-axis components) in the top and
bottom sections were calculated using Equations (4) and (5) and are presented in Table 1.
Two-dimensional load structure models of actual water pressure and equivalent water
pressure were established, respectively, with finite element software ANSYS 15.0 to test the
reliability of equivalent simulated water pressure loading. The internal forces (moment and
axial loading) in the waterproof lining under a 60 m water level for the actual water pressure
and the equivalent simulated water pressure are compared in Figure 4. The comparison
indicates that the internal lining stress distribution under the simulated water pressure
agreed well with the actual water pressure. The maximum positive and negative bending
moments occurred at the inverted arch and bottom of the wall, and the maximum and
minimum axial forces occurred at the bottom of the wall and the inverted arch, shown in
Figure 4. The internal forces were largest at the inverted arch and the bottom of the wall.
Hence, these locations were adopted to examine the consistency between the actual water
J. Mar. Sci. Eng. 2021, 9, 627 6 of 20

pressure and the equivalent simulated water pressure with the underground water level
ranging from 10 to 100 m. The relative error between the actual and simulated cases is
shown in Table 2.

Figure 3. Comparison of the equivalent simulated water pressure and actual water-pressure loading.

Table 1. Equivalent simulated hoop tension forces of the top and bottom sections with different under-
◦ ◦
ground water levels (based on Equations (4) and (5)). (Note: top half of the arch: α1 = 32 , α2 = 148 ;
◦ ◦
bottom half of the arch: α1 = −70 , α2 = 250 ).

Hoop Tension of Top Tension Hoop Tension of Bottom Tension


Underground Section Section
Water Level
FX1 (N) FY1 (N) FX2 (N) FY2 (N)
10 m 460,945 750,136 3,547,823 1,278,244
20 m 822,187 1,338,017 5,199,586 1,873,357
30 m 1,183,429 1,925,898 6,851,350 2,468,471
40 m 1,544,671 2,513,779 8,503,113 3,063,584
50 m 1,905,914 3,101,660 10,154,877 3,658,698
60 m 2,267,156 3,689,541 11,806,640 4,253,811
70 m 2,628,398 4,277,422 13,458,404 4,848,924
80 m 2,989,640 4,865,303 15,110,167 5,444,038
90 m 3,350,882 5,453,184 16,761,930 6,039,151
100 m 3,712,124 6,041,065 18,413,694 6,634,265

Table 2. Comparison between the actual water pressure and the equivalent simulated water pressure
at the inverted arch and the bottom of the wall.

Relative Error
Underground
Water Level Bending Moment Axial Force
Inverted Arch Bottom of Wall Inverted Arch Bottom of Wall
10 m 460,945 750,136 3,547,823 1,278,244
20 m 822,187 1,338,017 5,199,586 1,873,357
30 m 1,183,429 1,925,898 6,851,350 2,468,471
40 m 1,544,671 2,513,779 8,503,113 3,063,584
50 m 1,905,914 3,101,660 10,154,877 3,658,698
60 m 2,267,156 3,689,541 11,806,640 4,253,811
70 m 2,628,398 4,277,422 13,458,404 4,848,924
80 m 2,989,640 4,865,303 15,110,167 5,444,038
90 m 3,350,882 5,453,184 16,761,930 6,039,151
100 m 3,712,124 6,041,065 18,413,694 6,634,265
J. Mar. Sci. Eng. 2021, 9, 627 7 of 20

Figure 4. Comparison of the equivalent simulated water pressure and actual water-pressure loading.

Overall, according to the comparison shown in Table 2, for the noncircular section,
the difference between the internal stresses of the lining under the actual water pressure
and the equivalent simulated water pressure was extremely small, the bending-moment
error was <1%, and the axial-force error was <5%. Hence, the equivalent simulated water
pressure obtained by adjusting the hoop forces was reasonable, and the bulb-shaped
water-pressure distribution could be achieved in laboratory tests.

2.4. Test Device


2.4.1. Equivalent Water Pressure (Hoop) Loading Device
To achieve the foregoing loading procedure for the similitude model, a fully closed
prestressed equivalent water pressure (hoop) loading device for the tunnel model test of
the noncircular section was designed and used in this study, as shown in Figure 5. In
the scaled laboratory tests, the top section forces (calculated and presented in Table 1)
were evenly divided into five stages, and the bottom forces were divided into six stages.
These forces were applied to the scaled tunnel lining structure using the unique device.
The forces at the different stages were applied stepwise to the tunnel structure, so that the
complete full loading closed simulated water pressure on the noncircular section tunnel was
fulfilled. As described previously, the uneven (bulb-shaped) water pressure was accurately
simulated, and the internal forces in the model were almost identical to the calculated
internal forces under the actual water pressure. Thus, the high-speed highway tunnel under
high water levels can be comprehensively studied using the proposed method. The unique
device developed in this study is called a fully closed prestressed radial equivalent water
pressure (hoop) loading device and is specifically designed and built for the noncircular
section tunnel model water pressure.
J. Mar. Sci. Eng. 2021, 9, 627 8 of 20

Figure 5. Fully closed prestressed equivalent water pressure (hoop) loading device.

2.4.2. Ground Stress Loading Test Device


In the similitude model test, the device used to apply the soil pressure around the tun-
nel was horizontally laid on the ground, and its dimensions were 3.60 m × 3.60 m × 0.30 m,
as shown in Figure 6. The scaled tunnel model and similitude soil were placed inside this
loading device. The hydraulic jacks and loading panels were installed in the perpendicular
direction of the tunnel cross section so that the scaled tunnel remained in the plane stain
deformation state during the loading process. Soil pressure was provided by horizontally
installed hydraulic jacks on four sides and applied to the main structural model using
similitude soil. The soil-pressure coefficients on different sides were simulated by changing
the outputs of the hydraulic jacks in two directions and their ratio.

Figure 6. Soil-pressure loading test device.

2.4.3. Test Data Measuring System


The layout of the stress and strain gauges on the scaled tunnel model is shown in
Figure 7. Differential voltage displacement sensors with a resolution of 1/100 were placed
at the arch crown, spandrel, haunch, arch springing, bottom of the wall, and inverted arch,
and the interface contact pressure between the primary lining and the secondary lining
was measured using a soil-pressure load cell. Gauges were also placed at corresponding
locations on the excavation surface, along with a precise soil-pressure box, to measure the
J. Mar. Sci. Eng. 2021, 9, 627 9 of 20

soil pressure on the secondary lining. Strain gauges were installed both inside and outside
the lining structure to measure its deformations under loading. The internal stress of the
lining was then calculated using the strain measurements.

Figure 7. Measurement system.

During the scaled-model laboratory test, the applied water and soil pressures were
closely monitored, and the changes in the strain on the scaled tunnel structure were
carefully recorded. Using the collected data, the internal forces, e.g., the moment and axial
loading, were calculated as follows:

1
N= E(ε in + ε out )bh (7)
2
1
M= E(ε in − ε out )bh2 (8)
12
where b represents the unit length (1 m was used for all cases), and h represents the height
of the scaled model.

2.5. Test Materials


In the scaled-model test, the dimension scale factor was 1:30, the volume weight
similitude ratio was 1:1, and the similitude of all the physical quantities was derived
according to the elastic scenario. According to the similitude law, the Poisson’s ratio, strain,
and internal friction angle had a scale factor of 1:1 (Cµ = Cε = Cφ = 1). The scale factor
for the strength, stress, cohesion, and elastic modulus was 30 (CR = Cσ = Cc = CE = 30).
These ratios indicate that the similitude materials of the surrounding rocks were composed
of barite powder, coal ash, fine sand, and engine oil.
For examining the mechanical characteristics of Class IV surrounding rock with
different types of tunnels, a direct shear test was performed to determine the physical
and mechanical parameters of the similitude soil model under different loads. The soil
shear strengths under different pressures were determined in these tests. Additionally,
the shear-strength indices were determined, including the cohesion C and internal friction
angle ϕ. The parameter measurement device is shown in Figure 8, and the prototype and
scaled-model mechanical properties are presented in Table 3.
The prototype lining structure was made of C35 concrete. Hence, for the scaled model,
the lining structure was constructed using plaster, with a water-to-plaster weight ratio of
1:1.18. The model was prefabricated and assembled onsite to simulate the real site conditions.
The mechanical properties of the prototype and scaled model are presented in Table 4.
J. Mar. Sci. Eng. 2021, 9, 627 10 of 20

Figure 8. Model material parameter measurement.

Table 3. Mechanical parameters of the prototype and scaled model of the surrounding rock.

Surrounding Cohesion Internal Friction Angle Elastic Modulus Volume Weight


Rock C/MPa ϕ/◦ E/GPa γ/(kN·m−3 )
Prototype 0.2–0.7 27–39 1.3–6 20–23
Scaled model 0.017 37.2 0.117 22
Similitude ratio 30 1 30 1

Table 4. Physical and mechanical parameters of the prototype and scaled model of the lining structure.

Lining Prototype Scaled Model Scaled-Back Prototype Error (%)


Elastic modulus/GPa 32.5 1.07 32.1 1.23
Uniaxial compression
26.0 0.89 26.7 2.69
stress/MPa

2.6. Test Program


As mentioned previously, for the high-speed (350 km/h) railway tunnel of Class IV
surrounding rock, a fully closed prestressed equivalent water pressure (hoop) loading
device and ground stress compound loading devices were utilized in the scaled tunnel
tests. By performing a series of tests involving only water pressure and both water and soil
pressures, the incremental failure characteristics, worst loading cross section (rebar control
design), and failure mode (particularly the limited status of extreme external loading) were
investigated for both waterproof- and drainage-type tunnels.
According to the limited status index, the experiments were divided into two working
conditions: water pressure alone and simultaneous water and soil pressures. Details are
presented in Table 5.
J. Mar. Sci. Eng. 2021, 9, 627 11 of 20

Table 5. Experimental category and load condition.

Load Condition Loading Applied to Lining Structure Explanation


(1) This represents the situation where the lining structure
is mainly under water pressure (i.e., the failure of the
structure is controlled by the water pressure).
Load condition 1: only (2) According to experimental results, the limited water
water pressure pressures for both the waterproof and drainage lining
types were determined.
(3) The applicability of the two types (waterproof and
drainage) of lining structures was assessed.
(1) This represents the most common load condition for
lining structures with a soil pressure of <0.8 MPa.
Load condition 2: first (2) At a 0.8 MPa soil pressure, the water pressure was
apply 0.8 MPa soil gradually increased to determine the maximum water
pressure and then pressures for both the waterproof and drainage
apply water pressure linings.
(3) The failure mode of the lining structure was
determined for both water and soil pressure.

3. Results and Discussion


3.1. Failure Model under Only Water Pressure
For load condition 1 (only water pressure), model tests with the scaled lining structure
(both waterproof and drainage types) were performed in which prestressed radial forces
were applied stepwise to the top and bottom parts, separately. The initial water pressure was
10 m; the equivalent hoop tension force is presented in Table 1. At each step, an additional
water pressure of 10 m was applied to the scaled model until the model failed. Hence,
through the tests, the patterns of the internal force regular patterns for both the waterproof
and drainage linings under changes in the water pressure were obtained. Additionally, the
ultimate water pressures and failure modes were determined.
The general stress state and ultimate failure state of the lining structure in the initial
stage were taken as research objects, and the internal force distribution of the key parts
of the tunnel lining structure, such as the arch crown, spandrel, haunch, arch springing,
bottom of the wall, and inverted arch, under the two stress states was analyzed. For the
drainage lining, the water head was 10 m (corresponding to 100 kPa, representing the
general state of stress) and 49 m (corresponding to 490 kPa, representing the state of
ultimate failure). For the waterproof lining, the water head was 20 m (corresponding
to 200 kPa, representing the general state of stress) and 78 m (corresponding to 780 kPa,
representing the state of ultimate failure). The distributions of the bending moment and
axial force for the two types of lining structures (drainage and waterproof) in the general
stress state and ultimate failure state are shown in Figure 9.
As shown in Figure 9, under the action of water pressure alone, the two types of lining
structures exhibited similar distribution patterns of the internal forces (bending moment
and axial force) from the general stress state to the ultimate failure state. The bending
moment was distributed in a butterfly shape, with the arch crown, haunch, and bottom
of the wall facing outward, and the arch springing and inverted arch facing inward.
The bending moment of the inverted arch was larger than that of the arch crown. Among
the locations, the inverted arch had the largest positive bending moment, and the bottom
of the wall had the largest negative bending moment. In contrast, the axial force exhibited
a flat and round distribution, and the whole section was under compression, which was
relatively uniform. The axial force was relatively large for the inverted arch and the bottom
of the wall, and relatively small for the arch crown and haunch.
J. Mar. Sci. Eng. 2021, 9, 627 12 of 20

Figure 9. Distributions of the internal forces in the general stress state and ultimate failure state.

The curves of the internal forces at key points of the drainage and waterproof lining
with changes in the water pressure for the entire test are presented in Figure 10. As shown,
the positive bending moment of the inverted arch and the negative bending moment of the
bottom of the wall increased linearly, with an increase in the water pressure in a certain
range (drainage lining: water pressure of <0.3 MPa; waterproof lining: water pressure
of <0.6 MPa), and then exhibited the change characteristic of nonlinear failure. Among
the parts of the tunnel lining, the absolute values of the positive and negative bending
moments were the largest for the inverted arch and the bottom of the wall, respectively.
The bending moments of the other parts were essentially unchanged, with small absolute
values and minimal differences. The axial force increased linearly with an increase in the
water pressure in a certain range (drainage lining: water pressure of <0.4 MPa; waterproof
lining: water pressure of <0.6 MPa) and exhibited little difference among different parts.
Thus, the bottom of the wall and the inverted arch were the two weakest parts of the lining
structure under the action of water pressure.

Figure 10. Relationship between the internal forces and the water pressure.

The curves of the safety factor for key points of the drainage and waterproof lining
structures under water pressure are presented in Figure 11. The following observations
are made.
J. Mar. Sci. Eng. 2021, 9, 627 13 of 20

Figure 11. Relationship between the safety factor and the water pressure.

• With an increase in the water pressure, the safety factor of the lining structure de-
creased nonlinearly. During the early stages of water-pressure growth, the safety
factor declined rapidly and then became relatively flat.
• Both the drainage-type and waterproof-type lining structures were controlled by a
small eccentric compression. Among the parts, the bottom of the wall and inverted
arch always had the smallest safety factors; thus, they were the key sections determin-
ing the failure of the lining structure.
• Because the thickness of the bottom of the wall and the inverted arch of the waterproof
lining were relatively large (the thickness of the inverted arch was 80 cm), the safety
factor of the waterproof lining was significantly larger than that of the drainage lining
(for which the thickness of the inverted arch was 60 cm). Thus, the structural design
of the waterproof lining is more reasonable.
• For the drainage lining, when the water pressure was <0.3 MPa, the safety factor of
the lining structure was >2.4, indicating that the structure was safe. When the water
pressure was between 0.3 and 0.49 MPa, the safety factors of the inverted arch and the
bottom of the wall were <2.4 but >1.0, indicating that the structural safety reserve was
small and in a dangerous stage. When the water pressure was >0.49 MPa, the safety
factor of the lining structure was <1.0, and the structure failed.
• For the waterproof lining, when the water pressure was <0.6 MPa, the safety factor of
the lining structure was >2.4, indicating that the structure was safe. When the water
pressure was between 0.6 and 0.78 MPa, the safety factors of the inverted arch and the
bottom of the wall were <2.4 but >1.0, indicating that the structural safety reserve was
small and in a dangerous stage. When the water pressure was >0.78 MPa, the safety
factor of the lining structure was <1.0, and the structure failed.
Throughout the loading process, the failure modes of the drainage- and waterproof-
type lining structures were roughly similar, indicating that the arch crown and inverted
arch were concave towards the excavation face and that the bottom of the wall on both
sides was convex outwards. For both types of lining structures, first, compression and
shear failure occurred at the bottom of the wall, and then cracks appeared on the outside
of the bottom of the wall. Then, compression and shear failure occurred in the inverted
arch, and cracks appeared on the inner surface. The failure of the lining structure under
the action of only water pressure is shown in Figure 12.
The test results indicate the following.
• The ultimate water head of the drainage lining of the high-speed railway tunnel of
Class IV surrounding rock with a design speed of 350 km/h was 49 m (490 kPa), and
that of the waterproof lining was 78 m (780 kPa). For both types of lining structures, the
critical sections for ensuring safety were the bottom of the wall and the inverted arch.
• Under the action of only water pressure, the waterproof lining significantly improved
the water-pressure resistance (by approximately 59%) compared with the drainage lin-
ing.
• According to the test results indicating that the bending moment of the structure with
a water head of 60 m (0.6 MPa) had a catastrophe point and the safety factor was <2.4,
J. Mar. Sci. Eng. 2021, 9, 627 14 of 20

it is reasonable to take a 60 m water head as the design load index in the design of the
waterproof tunnel lining. Similarly, for the drainage-type lining, it is appropriate to
take a 30 m water head as the design load index.

Figure 12. Failure of the lining structure.

3.2. Failure Model under Variable Water Pressure and Constant Soil Pressure
According to the statistical results for a large number of tunnel engineering field
measurements, the surrounding rock pressure of the lining structure is <0.8 MPa in most
cases. Therefore, test condition 2 involved applying water pressure to the lining under a
constant soil pressure of 0.8 MPa, to study the lining stress failure characteristics under the
combined action of water and soil pressures and investigate the effects of changes in the
water pressure on the cracking failure of the tunnel during operation. In the model test of
two types of lining structures (drainage and waterproof) in test condition 2, soil pressure
was first slowly applied to the lining structures until it reached 0.8 MPa; then, it was
kept constant (the lateral pressure coefficient was 0.5). Then, water pressure was applied
stepwise (100 kPa in each step) until the lining structure failed, to determine the distribution
law of the internal forces of the two lining types (drainage and waterproof) with changes
in the water pressure under a constant soil pressure, the ultimate water pressure that could
be borne, and the mechanical evolution process of gradual failure.
For the drainage lining, the following two water pressures were selected: 0 kPa
(constant soil pressure of 0.8 MPa) and 750 kPa (ultimate failure state). For the waterproof
lining, the following two water pressures were selected: 0 kPa (constant soil pressure of
0.8 MPa) and 1180 kPa (ultimate failure state). The distributions of the bending moment
and axial force for the two linings (drainage and waterproof) are shown in Figure 13.
As shown in Figure 13, under the effect of the variable water pressure and constant soil
pressure (0.8 MPa), the two lining structures (drainage and waterproof) exhibited different
distribution patterns and characteristics of the internal forces (bending moment and axial
force) from the general stress state to the ultimate failure state. The distributions of the
internal forces (bending moment and axial force) for the two lining structures (drainage
and waterproof) from the general stress state to the ultimate failure state are described
as follows.
• Under only the constant soil pressure (0.8 MPa), the bending moment of the lining
structure under the general stress state exhibited a butterfly-shaped distribution
dominated by the upper part of the structure (arch). The maximum positive bending
moment occurred at the arch crown, and the maximum negative bending moment
occurred at the haunch.
• For both the drainage- and waterproof-type lining structures, when the ultimate
failure state was reached, the locations of the maximum positive moment and negative
moment changed from the upper part (arch crown, haunch) to the lower part (inverted
arch, bottom of the wall). Thus, the inverted arch and the bottom of the wall became
J. Mar. Sci. Eng. 2021, 9, 627 15 of 20

the key control sections for the design of the drainage- and waterproof-type lining
structures under the variable water pressure and constant soil pressure.
• From the general stress state of constant soil pressure (0.8 MPa) to the ultimate failure
state, the axial force of the lining structure generally exhibited a flat circular distribu-
tion and remained relatively uniform. The axial force distributions of the drainage-
and waterproof-type lining structures exhibited a gradual increase from the arch
crown to the inverted arch.
The curves of the internal forces at key points of the drainage and waterproof lining
structures with changes in the water pressure for the entire test are presented in Figure 14.
The following observations are made.

Figure 13. Distributions of the internal forces in the general stress state and ultimate failure state.

Figure 14. Relationship between the internal forces and the water pressure.

• The internal forces of the two types of linings changed similarly with respect to the
water pressure. The positive bending moments of the inverted arch and the arch
crown and the negative bending moments of the bottom of the wall and the haunch
increased approximately linearly with the increasing water pressure, within a certain
range (drainage lining: water pressure of <0.4 MPa; waterproof lining: water pressure
of <0.8 MPa) and then exhibited the change characteristic of nonlinear failure.
• For both the lining structures, with the increasing water pressure, the location of the
maximum positive bending moment changed from the arch crown to the inverted
arch, and the location of the maximum negative bending moment changed from the
haunch to the bottom of the wall. Thus, when the water pressure was low, the arch
crown and haunch were the key control sections for the lining-structure failure. With
J. Mar. Sci. Eng. 2021, 9, 627 16 of 20

the increasing water pressure, the inverted arch and the bottom of the wall were the
key control sections for the lining-structure failure.
• For both linings, the axial force increased linearly with the increasing water pressure.
The curves of the safety factor for key points of the drainage and waterproof linings
with respect to the water pressure are presented in Figure 15. The following observations
are made.
• The safety factor decreased nonlinearly with the increasing water pressure, and all
sections were controlled by a small eccentric compression. The safety factors of the
haunch, bottom of the wall, and inverted arch, which were the key control sections of
the lining structure, were small.
• For the drainage lining, when the water pressure was <0.4 MPa, the safety factor of
the lining structure was >2.4, indicating that the structure was safe. When the water
pressure was between 0.4 and 0.78 MPa, the safety factors of the inverted arch and the
bottom of the wall were <2.4 but >1.0, indicating that the structural safety reserve was
small and in a dangerous stage. When the water pressure was >0.78 MPa, the safety
factor of the lining structure was <1.0, and the structure failed.
• For the waterproof lining, when the water pressure was <0.85 MPa, the safety factor
of the lining structure was >2.4, indicating that the structure was safe. When the water
pressure was between 0.85 and 1.18 MPa, the safety factors of the inverted arch and the
bottom of the wall were <2.4 but >1.0, indicating that the structural safety reserve was
small and in a dangerous stage. When the water pressure was >1.18 MPa, the safety
factor of the lining structure was <1.0, and the structure failed.
Throughout the loading process, the failure modes of the drainage- and waterproof-
type lining structures were approximately identical. For both lining structures, first,
compression and shear failure occurred at the bottom of the wall, and cracks appeared
on the outside of the bottom of the wall. Then, compression and shear failure occurred
in the inverted arch, and cracks appeared on the inner surface. As the load increased,
cracks appeared on the outside of the haunch and finally on the inside of the arch crown.
The failure of the lining structures under the variable water pressure and constant soil
pressure (0.8 MPa) is shown in Figure 16.

Figure 15. Relationship between the safety factor and the water pressure.

The test results indicate the following.


• When the constant soil pressure was 0.8 MPa, the ultimate bearing water head of the
drainage lining of the high-speed railway tunnel of Class V surrounding rock with a
design speed of 350 km/h was 75 m (750 kPa), and the ultimate bearing water head of
the waterproof lining was 118 m (1180 kPa). For both linings, the key control sections
for the failure of the lining structure were the bottom of the wall and the inverted arch.
• Under a variable water pressure and constant soil pressure (0.8 MPa), compared with
the drainage lining, the waterproof lining had a significantly higher water-pressure
resistance (by approximately 59%) than the drainage lining.
J. Mar. Sci. Eng. 2021, 9, 627 17 of 20

• The test results indicated that the safety factor of the waterproof lining was <2.4 when
the water head was 85 m (0.85 MPa); thus, it is reasonable to take 85 m as the design
load index for the waterproof lining. Similarly, for the drainage lining, a design load
index of 40 m is recommended.
• Compared with the condition of only water pressure, the ultimate bearing capacities
of the drainage and waterproof linings were increased by 26 and 40 m, respectively,
and the design heads were increased by 10 and 25 m, respectively. Thus, the condition
of only water pressure was the most unfavorable condition. Therefore, in the lining-
structure design for the water-rich mined tunnel for the high-speed railway with
a design speed of 350 km/h, it can be concluded that the ultimate bearing head is
49 m (0.49 MPa) and 78 m (0.78 MPa) for the drainage- and waterproof-type lining
structures, respectively. Design load indices of 30 m (0.30 MPa) and 60 m (0.60 MPa)
are recommended for the drainage and waterproof linings, respectively.

Figure 16. Failure of the lining structure.

4. Conclusions
• According to the principle of mechanical equivalence, by using the “indirect” simu-
lation method of hoop loading, a full-circle closed equivalent water pressure (hoop
pull) loading device was developed for the model test of a tunnel with a noncircular
section, to achieve the nonuniform water loading of the mined-tunnel lining. Using the
finite-element method, the “indirect” simulation of the bulb-shaped water-pressure
distribution under hoop loading was confirmed to be equivalent and reasonable,
which enabled accurate predictions of the effect of the water pressure on the tunnel
structure.
• For the high-speed railway tunnel of Class IV surrounding rock with a design speed
of 350 km/h, a large-scale (similitude ratio of 1:30) model test was performed using a
nonuniform fully closed equivalent water (hoop) loading device and a surrounding
rock pressure complex loading device. The progressive failure characteristics of
different types of lining structures (waterproof and drainage), the most unfavorable
stress section (reinforcement control section), and the failure modes of instability were
investigated. Additionally, the limit index of the tunnel lining structure in a water-rich
stratum under an external load and a calculation method for it was proposed.
• For the high-speed railway tunnel of Class IV surrounding rock with a design speed
of 350 km/h, both the drainage and waterproof linings were controlled by a small
eccentric compression under the two test conditions of only water pressure and a
variable water pressure and constant soil pressure, and the key control sections for
instability were the bottom of the wall and the inverted arch. In comparison with
the drainage lining, the waterproof lining had a significantly higher water-pressure
resistance (by approximately 59%) than the drainage lining.
J. Mar. Sci. Eng. 2021, 9, 627 18 of 20

• Considering the high-speed railway tunnel of Class IV surrounding rock with a design
speed of 350 km/h as an example, the ultimate bearing head of the drainage lining
structure is 49 m (0.49 MPa), and the ultimate bearing head of the waterproof lining
structure is 78 m (0.78 MPa). The proposed design load index for the drainage-type
lining structure is 30 m (0.3 MPa), and that for the waterproof-type lining structure is
60 m (0.6 MPa).

Author Contributions: Z.Z. helped perform the analysis with constructive discussions; B.C. per-
formed the data analyses and wrote the manuscript; Q.L. contributed to the graphing and data
analyses. All authors have read and agreed to the published version of the manuscript.
Funding: This research was funded by the High Speed Railway and Natural Science United Founda-
tion of China (U1934213).
Institutional Review Board Statement: Not applicable.
Informed Consent Statement: Not applicable.
Data Availability Statement: The data presented in this study are available on request from the
corresponding author. The data are not publicly available because the funding project has not ended.
Acknowledgments: The authors are very grateful for the High Speed Railway and Natural Science
United Foundation of China (U1934213).
Conflicts of Interest: The authors declare that they have no conflict of interest to this work. We de-
clare that we do not have any commercial or associative interest that represents a conflict of interest
in connection with the work submitted.

References
1. Bian, K.; Xiao, M.; Chen, J. Study on coupled seepage and stress fields in the concrete lining of the underground pipe with high
water pressure. Tunn. Undergr. Space Technol. 2009, 24, 287–295. [CrossRef]
2. Cheng, P.; Zhao, L.-H.; Li, L.; Zou, J.-F.; Luo, W. Limiting drainage criterion for groundwater of mountain tunnel. J. Cent.
South Univ. 2014, 21, 4660–4668. [CrossRef]
3. Khave, G.J. Delineating subterranean water conduits using hydraulic testing and machine performance parameters in TBM
tunnel post-grouting. Int. J. Rock Mech. Min. Sci. 2014, 70, 308–317. [CrossRef]
4. Yang, G.; Wang, X.; Wang, X.; Cao, Y. Analyses of seepage problems in a subsea tunnel considering effects of grouting and lining
structure. Mar. Georesources Geotechnol. 2016, 34, 65–70. [CrossRef]
5. Zhu, B.; Wu, L.; Peng, Y.; Zhou, W.; Chen, C. Risk assessment of water inrush in tunnel through water-rich fault. Geotech. Geol. Eng.
2018, 36, 317–326. [CrossRef]
6. Li, Y.; Zhang, D.; Fang, Q.; Yu, Q.; Xia, L. A physical and numerical investigation of the failure mechanism of weak rocks
surrounding tunnels. Comput. Geotech. 2014, 61, 292–307. [CrossRef]
7. Guan, B.S. The loading conditions of shotcrete rock bolt tunnel support. Chin. J. Geotech. Eng. 1982, 4, 183–192.
8. Kitterød, N.O.; Colleuille, H.; Wong, W.; Pedersen, T.S. Simulation of groundwater drainage into a tunnel in fractured rock and
numerical analysis of leakage remediation, Romeriksporten tunnel, Norway. Hydrogeol. J. 2000, 8, 480–493.
9. Li, X.-B.; Zhang, W.; Li, D.-Y.; Wang, Q.-S. Influence of underground water seepage flow on surrounding rock deformation of
multi-arch tunnel. J. Cent. South Univ. Technol. 2008, 15, 69–74. [CrossRef]
10. Coli, N.; Pranzini, G.; Alfi, A.; Boerio, V. Evaluation of rock-mass permeability tensor and prediction of tunnel inflows by means
of geostructural surveys and finite element seepage analysis. Eng. Geol. 2008, 101, 174–184. [CrossRef]
11. Lei, M.; Peng, L.; Shi, C. Model test to investigate the failure mechanisms and lining stress characteristics of shallow buried
tunnels under unsymmetrical loading. Tunn. Undergr. Space Technol. 2015, 46, 64–75. [CrossRef]
12. Long, Y.Y.; Tan, Y. Soil arching due to leaking of tunnel buried in water-rich sand. Tunn. Undergr. Space Technol. 2020, 95, 103158.
[CrossRef]
13. Chabot, J.D. Entwaesserung bergmaennischer Tunnel/Draining underground tunnels. Tunnel 2002, 21, 18–24.
14. Lipponen, A.; Manninen, S.; Niini, H.; Rönkä, E. Effect of water and geological factors on the long-term stability of fracture zones
in the Päijänne Tunnel, Finland: A case study. Int. J. Rock Mech. Min. Sci. 2005, 42, 3–12. [CrossRef]
15. Ayhan, M.; Topal, E. Excavation and support design of the Dicle–Kralkizi water tunnel: An overview. Tunn. Undergr. Space Technol.
2005, 20, 81–87. [CrossRef]
16. Hwang, J.H.; Lu, C.C. A semi-analytical method for analyzing the tunnel water inflow. Tunn. Undergr. Space Technol. 2007, 22,
39–46. [CrossRef]
17. Wang, X.; Tan, Z.; Wang, M.; Zhang, M.; Ming, H. Theoretical and experimental study of external water pressure on tunnel lining
in controlled drainage under high water level. Tunnell. Undergr. Space Technol. 2008, 23, 552–560. [CrossRef]
J. Mar. Sci. Eng. 2021, 9, 627 19 of 20

18. Li, D.; Li, X.; Li, C.C.; Huang, B.; Gong, F.; Zhang, W. Case studies of groundwater flow into tunnels and an innovative
water-gathering system for water drainage. Tunn. Undergr. Space Technol. 2009, 24, 260–268. [CrossRef]
19. Fernandez, G.; Moon, J. Excavation-induced hydraulic conductivity reduction around a tunnel–Part 1: Guideline for estimate of
ground water inflow rate. Tunn. Undergr. Space Technol. 2010, 25, 560–566. [CrossRef]
20. Moon, J.; Jeong, S. Effect of highly pervious geological features on ground-water flow into a tunnel. Eng. Geol. 2011, 117, 207–216.
[CrossRef]
21. Yeh, H.D.; Chang, Y.C. Recent advances in modeling of well hydraulics. Adv. Water Resour. 2013, 51, 27–51. [CrossRef]
22. Wang, T.; Wu, H.; Li, Y.; Gui, H.; Zhou, Y.; Chen, M.; Xiao, X.; Zhou, W.; Zhao, X. Stability analysis of the slope around flood
discharge tunnel under inner water exosmosis at Yangqu hydropower station. Comput. Geotech. 2013, 51, 1–11. [CrossRef]
23. Li, P.; Zhou, X. Mechanical behavior and shape optimization of lining structure for subsea tunnel excavated in weathered slot.
China Ocean. Eng. 2015, 29, 875–890. [CrossRef]
24. Fang, Y.; Guo, J.; Grasmick, J.; Mooney, M. The effect of external water pressure on the liner behavior of large cross-section tunnels.
Tunn. Undergr. Space Technol. 2016, 60, 80–95. [CrossRef]
25. Li, P.; Wang, F.; Fang, Q. Undrained analysis of ground reaction curves for deep tunnels in saturated ground considering the
effect of ground reinforcement. Tunn. Undergr. Space Technol. 2018, 71, 579–590. [CrossRef]
26. Qiu, J.; Qin, Y.; Lai, J.; Wang, K.; Niu, F.; Wang, H.; Zhang, G. Structural response of the metro tunnel under local dynamic water
environment in loess strata. Geofluids 2019, 2019, 1–16. [CrossRef]
27. Guo, R.; Zhang, M.; Xie, H.; He, C.; Fang, Y.; Wang, S. Model test study of the mechanical characteristics of the lining structure for
an urban deep drainage shield tunnel. Tunn. Undergr. Space Technol. 2019, 91, 103014. [CrossRef]
28. Bazant, Z.P. Mechanics of Geomaterials, Rocks, Concrete, Soils; Wiley: Hoboken, NJ, USA, 1985.
29. Eisenstein, Z.D. Large undersea tunnels and the progress of tunnelling technology. Tunn. Undergr. Space Technol. 1994, 9, 283–292.
[CrossRef]
30. Park, I.J.; Park, M.J.; Kim, S.I.; Kwak, C.-W.; Jang, S.-Y. Stability analysis of tunnel spillway under internal water pressure. J. Korean
Tunn. Undergr. Space Assoc. 2005, 7, 63–72.
31. He, C.; Feng, K.; Su, Z.X. Development and application of loading test system of prototype structure for underwater shield tunnel
with large cross-section. Chin. J. Rock Mech. Eng. 2011, 30, 254–266.
32. Zhou, Y.; Su, K.; Wu, H. Hydro-mechanical interaction analysis of high pressure hydraulic tunnel. Tunn. Undergr. Space Technol.
2015, 47, 28–34. [CrossRef]
33. Xue, X.; Zhang, J.; Zhou, X. Reliability evaluation of water-rich loess tunnel with lining crack based on extension theory. Adv. Civ.
Eng. 2019, 2019, 1–10. [CrossRef]
34. Zhou, Z.; Tan, Z.; Liu, Q.; Zhao, J.; Dong, Z. Experimental investigation on mechanical characteristics of waterproof system for
Near-Sea tunnel: A case study of the Gongbei Tunnel. Symmetry 2020, 12, 1524. [CrossRef]
35. Lyu, H.M.; Shen, S.L.; Zhou, A.; Chen, K.-L. Calculation of pressure on the shallow-buried twin-tunnel in layered strata.
Tunn. Undergr. Space Technol. 2020, 103, 103465. [CrossRef]
36. Shimojima, E.; Tanaka, T.; Hoso, Y.; Yoshioka, R.; Davis, G. Using short-and long-term transients in seepage discharge and
chemistry in a mountain tunnel to quantify fracture and matrix water fluxes. J. Hydrol. 2000, 234, 142–161. [CrossRef]
37. Lee, I.M.; Nam, S.W.; Ahn, J.H. Effect of seepage forces on tunnel face stability. Can. Geotech. J. 2003, 40, 342–350. [CrossRef]
38. Xuhua, R.; Xiangrong, C.; Zhigang, S. Water problems and corresponding countermeasures in projects of deep-lying long tunnels
located in water-rich regions. Chin. J. Rock Mech. Eng. 2004, 23, 1924–1929.
39. Xie, X.-L.; Su, H.-D. Mechanical behavior of prestressed double composite linings of Yellow-river-crossing tunnel. J. Yangtze River
Sci. Res. Inst. 2011, 28, 180.
40. Zhang, J.; Li, S.; Li, L.; Zhang, Q.; Xu, Z.; Wu, J.; He, P. Grouting effects evaluation of water-rich faults and its engineering
application in Qingdao Jiaozhou Bay Subsea Tunnel, China. Geomech. Eng. 2017, 12, 35–52. [CrossRef]
41. Pan, Q.; Dias, D. Three dimensional face stability of a tunnel in weak rock masses subjected to seepage forces. Tunn. Undergr.
Space Technol. 2018, 71, 555–566. [CrossRef]
42. Zhang, J.; Li, S.; Zhang, Q.; Zhang, X.; Li, P.; Wang, D.; Weng, X. Mud inrush flow mechanisms: A case study in a water-rich fault
tunnel. Bull. Eng. Geol. Environ. 2019, 78, 6267–6283. [CrossRef]
43. Li, Z.; He, C.; Chen, Z.; Yang, S.; Ding, J.; Pen, Y. Study of seepage field distribution and its influence on urban tunnels in
water-rich regions. Bull. Eng. Geol. Environ. 2019, 78, 4035–4045. [CrossRef]
44. Wei, W.B.; Cheng, Y.M. Stability analysis of slope with water flow by strength reduction method. Soils Found. 2010, 50, 83–92.
[CrossRef]
45. Mengshu, W.; Zhongsheng, T. The construct technology of tunnel and underground engineering in China. Eng. Sci. 2010, 12,
4–10.
46. Kværner, J.; Snilsberg, P. Groundwater hydrology of boreal peatlands above a bedrock tunnel—Drainage impacts and surface
water groundwater interactions. J. Hydrol. 2011, 403, 278–291. [CrossRef]
47. Feng, K.; He, C.; Fang, Y.; Jiang, Y. Study on the mechanical behavior of lining structure for underwater shield tunnel of high-speed
railway. Adv. Struct. Eng. 2013, 16, 1381–1399. [CrossRef]
48. Ma, D.; Miao, X.; Bai, H.; Huang, J.; Pu, H.; Wu, Y.; Zhang, G.; Li, J. Effect of mining on shear sidewall groundwater inrush hazard
caused by seepage instability of the penetrated karst collapse pillar. Nat. Hazards 2016, 82, 73–93. [CrossRef]
J. Mar. Sci. Eng. 2021, 9, 627 20 of 20

49. Sun, Z.; Zhang, J.; Su, Z.; Xue, X. Seepage-Stress Coupling Analysis of Water-Rich Loess Tunnel. In Proceedings of the 4th
International Conference on Sensors, Measurement and Intelligent Materials, Shenzhen, China, 27–28 December 2015; Atlantis
Press: Zhengzhou, China, 2016; Volume 43, pp. 1187–1190.
50. Zhang, N.; Shen, J.S.; Zhou, A.; Arulrajah, A. Tunneling induced geohazards in mylonitic rock faults with rich groundwater: