Peter Adu 300B

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

AKENTEN APPIAH-MENKA UNIVERSITY OF SKILLS TRAINING AND

ENTERPRENEURIAL DEVELOPMENT.

Course Title: Project Management In ICT.

Course Code: ITC 354.

Lecturer Name: Samuel A. Gyimah.

Project Title: Integrated Benefits Administration System.

Level: 300

Class: B
Integrated Benefits Administration System

1.0 Project Initiation

1.0.1 Project Planning

1.0.1.1 Define project objectives and scope


1.0.1.2 Identify project stakeholders
1.0.1.3 Develop project charter
1.0.1.4 Conduct feasibility study

1.0.2 Project Setup

1.0.2.1 Select project team


1.0.2.2 Identify project risks and constraints
1.0.2.3 Define project management plan
1.0.2.4 Create project schedule

1.1 Requirement Gathering

1.1.1 Business Requirements

1.1.1.1 Conduct stakeholder interview


1.1.1.2 Collect and document business requirements
1.1.1.3 Review and validate requirement

1.1.2 Technical Requirement

1.1.2.1 Analyze existing systems and data


1.1.2.2 Identify technical requirement
1.1.2.3 Develop technical specifications
1.1.2.4 Review and validate technical requirement

1.2 Design and Development

1.2.1 System Architecture

1.2.1.1 Design system architecture


1.2.1.2 Define system component and interface
1.2.1.3 Develop system diagram

1.2.2 User Interface Design

1.2.2.1 Design user interface


1.2.2.2 Develop wireframes and mockups
1.2.2.3 Review and validate design with
stakeholders

1.2.3 System Development

1.2.3.1 Develop system components


1.2.3.2 Build system integrations
1.2.3.3 Develop system functionality

1.3 Testing and Quality Assurance

1.3.1 Test Planning

1.3.1.1 Define testing objectives and scope


1.3.1.2 Identify test cases
1.3.1.3 Develop test plan
1.3.2 System Testing

1.3.2.1 Conduct system testing


1.3.2.2 Verify system functionality
1.3.2.3 Address defects and issues

1.3.3 User Acceptance Testing

1.3.3.1 Conduct user acceptance testing


1.3.3.2 Verify system usability

1.3.4 Quality Assurance

1.3.4.1 Define quality standards


1.3.4.2 Conduct quality assurance checks

1.4 Deployment

1.4.1 Deployment Planning

1.4.1.1 Identify deployment requirement


1.4.1.2 Develop deployment plan

1.5 Project Closure

1.5.1 Project Closure

1.5.1.1 Archive project documents and artifacts


1.5.1.2 Release project resources
1.5.1.3 Conduct final project review and sign-off