Recapitulasi Piling SSP 450 X150 X12 MM: NO Date Area Leght Total (Meter) (PCS) Leght
Recapitulasi Piling SSP 450 X150 X12 MM: NO Date Area Leght Total (Meter) (PCS) Leght
Recapitulasi Piling SSP 450 X150 X12 MM: NO Date Area Leght Total (Meter) (PCS) Leght
OPERATOT : JANSEN
PROYEK SSP -KAI CREC STASIUN PADALARANG-BANDUNG
LEGHT VOLUME TOTAL
NO DATE AREA
(METER) (PCS) LEGHT
1 15 December 2022 CREC-1C 8 10 80
CREC-1C 12 1 12
2 16 December 2022
CREC-12D 9 17 153
9 34 306
3 17 December 2022 CREC-12D
12 9 108
4 18 December 2022 0
0
0
659
50 X12 MM
PILING
REMARK
PER DAY 240
1 JONI 130
JONI
18
ASUN
370 25
43 ASUN
14.8
15 9
14 9
5
34
43 9
62
RECAPITULASI PILING SSP 450 X150 X12 MM
OPERATOT : SANDY
PROYEK SSP -KAI CREC STASIUN PADALARANG-BANDUNG
LEGHT VOLUME TOTAL
NO DATE AREA
(METER) (PCS) LEGHT
1 16 December 2022 CREC -12D 9 6 54
54
50 X12 MM
PILING
REMARK
PER DAY
6 ASUN
6
RECAPITULASI PILING SSP 450 X150 X12 MM