Doc
Doc
Doc
This study source was downloaded by 100000865526114 from CourseHero.com on 04-13-2023 20:51:56 GMT -05:00
production using the expected actual capacity activity
level? 6. Using the data in No. 1, what is the overhead rate base on
units of production using the normal capacity activity level?
a. P80 per unit
b. P75 per unit a. P64 per unit
c. P65 per unit b. P70 per unit
d. P85 per unit c. P75 per unit
d. P80 per unit
2. Using the data in No. 1 what is the predetermined
overhead rate base on material cost? 7. Using the data in No. 1, what is the overhead rate base on
material
a. 200% cost using the normal capacity activity level?
b. 150%
c. 250% a. 160%
d. 300% b. 155%
c. 165%
3. Using the data in No. 1, what is the predetermined d. 200%
overhead rate
base on direct labor cost? 8. Using the data in No. 1, what is the overhead rate base on
machine hours using the normal capacity activity level?
a. 133%
b.. 153% a. P92
c. 166% b. P85
D. 113% c. P75
d. P60
4. Using the data in No. 1, what is the predetermined
overhead rate
base on direct labor hours?
This study source was downloaded by 100000865526114 from CourseHero.com on 04-13-2023 20:51:56 GMT -05:00
Variable 95,000 150,000 a. P10,086
Estimated b. P15,086
overhead c. P 8,733
Fixed 50,000 56,000 d. P 7,833
Overhead 130,000 142,000
13. Using the data in No. 12, what is over or underapplied
The company determines overhead rates based on estimated manufacturing for March?
units to be produced.
a. P1,086 underapplied
9. What are the estimated units of production used to obtain b. P1,086 overapplied
the overhead allocation rates 2013 and 2014? c. P 267 underapplied
d. P 267 overapplied
2013 2014 14. The normal capacity for Maria Company is 36,000 machine
a. 12,000 11,000 hours with fixed manufacturing overhead budgeted at P16,920
b. 11,000 12,000 and an estimated variable manufacturing overhead rate of
c. 12,000 13,000 P2.10 per hour.
d. 11,000 13,000 During July, actual production required 2,700 machine
hours,with a total overhead of P7,800.
10. What is the overapplied (underapplied) overhead in 2013?
What is the applied manufacturing overhead?
a. P(5,000)
b. P5,000 a. P20,898
c. P7,000 b. P19,290
d. P(7,000) c. P6,939
d. P9,639
11. What is the overapplied (underapplied) overhead in 2014?
15. Using the data in No. 14, what is the over or underapplied
a. P7,000 manufacturing overhead for July?
b. P(7,000)
c. P5,000 a. P13,098 overapplied
d. P(5,000) b. P13,098 underapplied
c. P 861 underapplied
d. P 861 overapplied
This study source was downloaded by 100000865526114 from CourseHero.com on 04-13-2023 20:51:56 GMT -05:00
Direct Labor hous 260,000 248,000 application rate for 2014 is P8.60 per hour, based on
Manufacturing anticipated fixed costs of P348,000 and anticipated variable
Overhead costs of P684,000 with an expected volume of 120,000 labor
Fixed P 585,000 P 578,400 hours.
Variabe 1,092,000 1,039,940
Total P1,677,000 P 1, 618,340 During the year, the company actually operated for 115,800
hours, incurring fixed overhead of P348,000 and variable
overhead of P637,880.
16. What is the over or underapplied overhead for the year?
20. What is the under or overapplied manufacturing overhead
a. P 16,805 overapplied for the year?
b. P16,805 underapplied
c. P15,800 overapplied a. 10,500 underapplied
d. P15,800 underapplied b. P10,500 overapplied
c. P10,000 underapplied
17. What is the fixed volume variane? d. P10,000 overapplied
This study source was downloaded by 100000865526114 from CourseHero.com on 04-13-2023 20:51:56 GMT -05:00
Answers: 12. A. Actual output 4,100 units
Overhead rate:
1. A.
P80 per unit = P800/10,000 units Fixed overhead rate: P1,400/(48,000/12) = P0.36
2. A.
200% of material cost -= P800,000/P400,000 Variable overhead rate: 2.10
3. A.
133% of direct labor cost = P800,000/P600,000 P2.46
4. A.
P32 per direct labor hour = P800,000/25,000 Applied manufactuing overhead
*P600,000/P24 = 25,000 P10,086
estimated direct labor hour. 4,100x2.46
5. A. 2.40 per machine hour = P800,000/3.333
*20 minutes/60 minutes = 1/3 machine
hour per unit
1/3 hour per unit x 10,000 unit x 10,000 units = 3.333
estimated machine hours. 13. A. Applied manufacturing overhead P10,086
6. A. P64 overhead per unit Actual manufacturing overhead 9,000
*10,000 units/80% = 12,500 Overapplied manufacturing overhead
P1,086
7. A 160% of material cost = P800,000/P500,000
*P40 x 12,500 units 14. C Actual production 2,700 hours
Overhead rate
8. A.P92 per machine hour = P800,000/(1/3 hour x 12,500 Fixed overhead rate:(P16,920/12)/
units) (36,000/12) P 0.47
Variable overhead rate: 2.10
9. A. - 2009: P180,000/P15 = 12,000 estimated units of 2.57
production Applied manufactuing overhead P6,939
a) -2010 P198,000/P18= 11,000 esimated units of
production 15. C. Actual manufacturing overhead P7,800
Applied manufacturing overhead 6,939
10. B. Applied factory overhead (P10,000 units x P15 ) Underapplied manufacturing overhead
P150,000 P 861
Actual factory overhead (P50,000+P95,000)
145,000 16. A. Actual manufacturing overhead
Overapplied overhead P P1,618,340
5,000 Applied manufacturing overhead
1,601,535
11. B Actual factory overhead (P55,000 = P150,000) (248,300 DLH x 6.45)
P205,000 Underapplied overhead
Applied factory overhead(11,000 units x P18) P16,805
198,000 (P1,677,000/260,000 DLH = P 6.45
Underapplied overhead per DLH
7,000
This study source was downloaded by 100000865526114 from CourseHero.com on 04-13-2023 20:51:56 GMT -05:00
Applied fixed overhead 558,675 P1,008,060
(248,300 DLH x 2.25) Per DLH)
Volume Variance P 26,325 Actual Overhead
985,880
18. C. Budgeted overhead Spending variance P 22,180
Fixed overhead P585,000
Variable overhead P1,042,860 (P684,000/120,000 DLH = P 5.70 per DLH)
P1,627,85
(248,300 x P4.20) 23. B Volume variance (U) P
Actual Manufacturing OH P 12,180
1,618,340 Spending variance (F)
Spending variance (f) P 22,180
9,520 Net overhead variance P
10,000
19. A. Volume variance (U) P
26,325
Spending variance (F) 9,520
Net overhead variance P
16,805
This study source was downloaded by 100000865526114 from CourseHero.com on 04-13-2023 20:51:56 GMT -05:00
Powered by TCPDF (www.tcpdf.org)