Demolition
Demolition
Demolition
SPECIFICATION FOR
DEMOLITION
Repsol YPF
September, 2005
Specification Page 1
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005
TABLE OF CONTENTS
1.0 GENERAL....................................................................................................................................5
1.1 Summary..........................................................................................................................5
1.2 References.........................................................................................................................5
2.0 EXECUTION................................................................................................................................5
2.1 Preparation.......................................................................................................................6
2.2 Buildings and Structures.................................................................................................7
2.4 Explosives.........................................................................................................................8
2.5 Burning.............................................................................................................................8
2.6 Salvage...............................................................................................................................8
Specification Page 2
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005
1.0 GENERAL
1.1 Summary
A. Scope of Specification
B. Related Specifications
Coordinate Work prescribed by this specification with Work prescribed by the above
listed specifications.
1.2 References
The publications listed below form part of this specification. Each publication shall be the
latest revision and addendum in effect on the date this specification is issued for construction
unless noted otherwise. Except as modified by the requirements specified herein or the
details of the drawings, Work included in this specification shall conform to the applicable
provisions of these publications.
Specification Page 3
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005
2.0 EXECUTION
2.1 Preparation
A. Protection
1. Existing Facilities
2. Weather Protection
3. Protective Barriers
B. Dust Control
1. Existing Buildings
Specification Page 4
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005
2. Work Areas
3. Airborne Contaminants
A. General
2. Within the battery limits (5 feet outside of the building perimeter column
lines indicated on the drawings) of proposed new buildings, remove
structures and related appurtenances to a depth of no less than 12 inches
below the indicated bottom of footing or foundation.
3. Within 2 feet on each side of the centerline of proposed new utility lines,
remove existing structures and appurtenances to a depth of no less than 12
inches below the bottom of the new utility.
4. In areas other than those indicated above, remove existing structures and
appurtenances to a depth of no less than 24 inches below the proposed
finished grade.
Specification Page 5
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005
A. General
B. Abandonment of Utilities
Purge, clean, fill, or terminate utility pipelines that are to be abandoned in a manner
conforming to the requirements of the nationally recognized code covering the specific
utility; and as indicated on the drawings, in these specifications, and elsewhere in the
contract documents. Bring conflicts between code requirements and the contract
documents to the attention of Owner, for resolution.
C. Disconnecting Utilities
2.4 Explosives
Using explosives will be permitted. Comply with all state, and local safety regulations
concerning the use of explosives, including necessary analyses for overpressure and debris
hazard. Give the owner, adjacent property owners, and all public utilities with facilities in
rights-of-way adjacent to the site at least 24 hours notice before any blasting operation.
Specification Page 6
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005
2.5 Burning
Burning debris and rubbish on the owner's property will be permitted. When permitted,
burning shall strictly comply with applicable local and Federal regulations.
2.6 Salvage
Owner reserves the right to keep identified materials and equipment scheduled to be
demolished or removed. Remove other such materials and equipment from the site.
2.8 Cleanup
Remove from the project site materials, rubbish, and other debris resulting from the
demolition work; leave the site clean and safe.
2.9 Regulations
End of Specification