GATHERING FLOW LINE MGR 4 REVISION: 0

MARGARITA FIELD DEVELOPMENT


Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

SPECIFICATION FOR

DEMOLITION

Repsol YPF

September, 2005

Specification Page 1
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

TABLE OF CONTENTS

1.0 GENERAL....................................................................................................................................5
1.1 Summary..........................................................................................................................5
1.2 References.........................................................................................................................5
2.0 EXECUTION................................................................................................................................5
2.1 Preparation.......................................................................................................................6
2.2 Buildings and Structures.................................................................................................7
2.4 Explosives.........................................................................................................................8
2.5 Burning.............................................................................................................................8
2.6 Salvage...............................................................................................................................8

Specification Page 2
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

1.0 GENERAL

1.1 Summary

A. Scope of Specification

This specification prescribes the removal of existing buildings, structures, abandoned


pipelines, and other similar facilities to the extent indicated on the drawings or
elsewhere in the contract documents, and prescribes the proper disposal of the
resulting materials and debris. The site has previously been inspected for and if
required cleansed of all asbestos and/or radiological materials by the owner.

B. Related Specifications

The following specifications prescribe items of related Work:

 06708300-AR-01: General Requirements


 06708300-CV-08: Clearing and Grubbing
 06708300-CV-07: Topsoil Removal and Stockpiling
 06708300-CV-03: Erosion Control

Coordinate Work prescribed by this specification with Work prescribed by the above
listed specifications.

1.2 References

The publications listed below form part of this specification. Each publication shall be the
latest revision and addendum in effect on the date this specification is issued for construction
unless noted otherwise. Except as modified by the requirements specified herein or the
details of the drawings, Work included in this specification shall conform to the applicable
provisions of these publications.

A. OSHA (Occupational Safety and Health Administration)

1. OSHA Constructions Industry Standards: Title 29, Code of Federal


Regulations, Part 1926, Safety and Health Regulations for Construction.

Specification Page 3
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

2.0 EXECUTION

2.1 Preparation

A. Protection

1. Existing Facilities

Protect existing facilities, of the owner, whether to remain in place or be


reused, by temporary covers, shoring, bracing, and/or supports. Repair or
replace those items designated to remain or to be reused that are damaged
during performance of the work. Protect structural elements from being
overloading. Provide new supports, braces, or reinforcement, as required, for
existing facilities weakened by demolition and removal work.

2. Weather Protection

Protect facilities and equipment designated to remain in place from the


weather at all times. Maintain temporary coverings to ensure their
effectiveness and to prevent their displacement.

3. Protective Barriers

Before starting demolition operations, erect protective barriers around trees


and shrubs designated to remain. Barriers shall consist of 4 feet high woven
wire fabric [or other engineer acceptable warning barriers] fencing
supported by steel or wood posts, spaced 6 feet on center (maximum). Erect
barriers at or outside of the tree or shrub drip line. Do not use the areas
within protective barriers for traffic, storage, or any other purpose. Upon
completing demolition work, remove and dispose of protective barriers.

B. Dust Control

1. Existing Buildings

Provide dust proof barricades to prevent the intrusion of dust or inclement


weather into interiors of existing buildings exposed by the work. Construct
barricades using substantially braced framing covered with a suitable
polyethylene sheeting material. Remove and properly dispose of barricades
when no longer needed (as determined by the owner and construction
manager).

Specification Page 4
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

2. Work Areas

Take appropriate measures to avoid accumulating dust in work areas, so as


not to create a nuisance to surrounding areas.

3. Airborne Contaminants

During demolition work covered by this specification, take appropriate


measures to protect personnel from being injured by airborne contaminants
and metal dusts. Such measures shall comply with the requirements of
OSHA Construction Industry Standards pertaining to airborne contaminants.
4. The use of water will not be permitted when it will result in hazardous or
objectionable conditions such as pollution, flooding, or unsafe areas.

2.2 Buildings and Structures

A. General

Buildings and other structures and related appurtenances designated to be removed or


demolished shall be completely removed to the limits indicated below, unless other
limits are indicated on the drawings or elsewhere in the contract:

1. In areas where new pavement is to be placed, remove structures and related


appurtenances to a depth of no less than 36 inches below the finished grade
of the new paving.

2. Within the battery limits (5 feet outside of the building perimeter column
lines indicated on the drawings) of proposed new buildings, remove
structures and related appurtenances to a depth of no less than 12 inches
below the indicated bottom of footing or foundation.

3. Within 2 feet on each side of the centerline of proposed new utility lines,
remove existing structures and appurtenances to a depth of no less than 12
inches below the bottom of the new utility.

4. In areas other than those indicated above, remove existing structures and
appurtenances to a depth of no less than 24 inches below the proposed
finished grade.

B. Remaining Concrete Slabs

Wherever the concrete slab of demolished buildings or other structures or pavements


will remain below the limits of removal indicated above, break such slabs into pieces

Specification Page 5
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

with no dimension greater than 10 feet.

2.3 Utilities and Related Appurtenances

A. General

Remove the following utility service lines:

1. Existing lines designated on the drawings to be removed.

2. Portions of abandoned lines:

 Less than 24 inches below proposed finished grade.


 Within construction areas of new buildings, roads, walks, or parking
areas.
 That interferes with installation of new utility lines.
 That otherwise interfere with performance of Work.

B. Abandonment of Utilities

Purge, clean, fill, or terminate utility pipelines that are to be abandoned in a manner
conforming to the requirements of the nationally recognized code covering the specific
utility; and as indicated on the drawings, in these specifications, and elsewhere in the
contract documents. Bring conflicts between code requirements and the contract
documents to the attention of Owner, for resolution.

C. Disconnecting Utilities

When demolition or abandonment work requires the disruption or interruption of


service or disconnection of a service connection, coordinate such work with the
affected utility supplier to ensure that proper measures are taken to protect the utility
from damage. Owner shall also be informed prior to conducting these interruptions.

2.4 Explosives

Using explosives will be permitted. Comply with all state, and local safety regulations
concerning the use of explosives, including necessary analyses for overpressure and debris
hazard. Give the owner, adjacent property owners, and all public utilities with facilities in
rights-of-way adjacent to the site at least 24 hours notice before any blasting operation.

Specification Page 6
GATHERING FLOW LINE MGR 4 REVISION: 0
MARGARITA FIELD DEVELOPMENT
Repsol YPF RYB-GIC TECHNICAL BID DATE:
Engineering and Construction Specification September, 2005

SPECIFICATION FOR DEMOLITION

2.5 Burning

Burning debris and rubbish on the owner's property will be permitted. When permitted,
burning shall strictly comply with applicable local and Federal regulations.

2.6 Salvage

Owner reserves the right to keep identified materials and equipment scheduled to be
demolished or removed. Remove other such materials and equipment from the site.

2.7 Safety Requirements

Perform demolition in accordance with applicable requirements of the OSHA Construction


Industry Standards and COMPANY's project safety requirements.

2.8 Cleanup

Remove from the project site materials, rubbish, and other debris resulting from the
demolition work; leave the site clean and safe.

2.9 Regulations

Local regulations regarding hauling and disposal shall apply.

End of Specification