CONCRETING OF ROAD AT SO.

AGSAMBALILO, ILAG
San Teodoro, Oriental Mindoro

PERT / CPM NETWORK DIAGRAM WITH S-CURVE


Removal of RCPC (12" dia.) -
Clearing and Grubbing

Structure Excavation
Project Sign Board

310mm

Subgrade Preparation Aggregate Subbase Course

7 8
10 21 48 6 27 48

Pipe Culverts, 460mm dia. (18" Ø)


s 1 2 3 4 PCCP - 150mm thk.
5 6
0 0 1 1 33 3 5 5 7 7 9 9 11 11 37
2 2 2
1
Aggregate Subbase Course
Subgrade Preparation

Stone Masonry
37

0 4 8 12 16 20 24 28 32 36 40

MARCING CONSTRUCTION SERVICES

ERIC E. ABUTAN
Proprietor
AT SO. AGSAMBALILO, ILAG
Oriental Mindoro

AGRAM WITH S-CURVE

100

90

80

70

E
48 48 60

50

40

30

20

10

0
44 48