Manila City Permit Plans Requirements Checklist

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

REPUBLIC OF THE PHILIPPINES

CITY OF ILOILO a. Architectural: Plan Requirements


CITY BUILDING OFFICIAL C.1. For Residential Buildings:
3FLR City Hall Building, Plaza Libertad o Conformity of Site development plan to
floor plan
o Floor Plan layout, 4elevations, 2 sections,
Name of Owner / Applicant:________________________ others.
Address:________________________________________ o Indicate percentage of Open Spaces,
Project Title:_____________________________________ Light and Ventilation
Location of Project:_______________________________ o Firewall / Party-wall for row house /
duplex
_______________________________________________
o Reflect Parking / Carport / Garage layout
Owner’s Contact No:______________________________ o Habitable Room (Human habitable area)
o Stair detail and headroom clearance
Note: Pls. Attached this checklist to the application document.
C.2. For Commercial Buildings:
CHECKLIST OF PLAN REQUIREMENTS C.3. Permit Forms:
o Building area
FOR BUILDING PERMIT: o Signed and sealed by Architect
o Photo copy of latest PRC License
o Line & Grade:
-If the applicant is not the owner of the lot, C.4. Details / Dimension / Specification
please submit any of the following: o Stairs
o Consent / Authority / SPA from the lot o Site Development (inclusions)
owner to construct a structure on the said o Vicinity (Access St.)
lot; o Glass (precautionary details / specs)
o Deed of absolute sale; o Doors and Windows
o Contract of lease and photo copy of o Space plans / Lay-out
Certificate of Occupancy of the Main o Firewall
Building (for rentable bldg.,) o Hallway
o For Corporations-Secretary’s Certificate o Parking
for the “authority to sign “of the o Loading & Unloading
representative in behalf of the corporation. o Percentage of Floor and Lot Area Ratio
B.1. Requirement on the plans: (FLAR) / Allowable Maximum Building
-The following must be indicated on the Site Footprints (AMBF) / Open space/s, OL,
Development Plan: GFA, TGFA
o Technical description of Lot/s and o Area tabulation
Boundary lots (points, bearings and o Others: Specify
distance) based on the Lot Plan. C.5.BP344:
o Indicate roads, creeks, alleys, access o Ramp
roads, whichever is applicable. o Comfort Room
o Dimensions of structure/s and its o Signage
corresponding setbacks. o Parking
o Indicate Firewalls, if any.
o Indicate distance from the centerline of D. Structural:
road to the property line or at the D.1. Structural Design Analysis for:
outermost face of the structure (in case o One Storey with Roof Deck
the structure is adjacent to the national o Swimming pool / retaining wall
road, city road and barangay roads). o Gasoline Station
o Indicate river or creek easement (in case o Warehouse
the structure is adjacent to a river or o Two Storey Building or higher
creek), submit Certificate of No-objection D.2. Structural Frame Analysis (includes
from ICRDC. Dead Load, Live Load & Seismic)
o Vicinity Map Scale1:10,000/ location / o For Three- storey building/ structure &
building key map above
B.2. Requirements on Building Forms D.3. Soil Investigation Report:
and Plans: o For Building Two (2) Storey Roof Deck or
o Should be signed and sealed by Architect Higher
or Engineer. D.4. Plans & Design Analysis:
o Latest PTR of the Architect or Engineer o Structural plans and structural design
who sign the forms and plans. analysis (Two (2) storey & above) must
be signed & sealed by Civil Engineer.
o Indicate the General Construction Notes
on Structural Plan
G.1.Mechanical Design Analysis
D.5.Permit Forms: (whichever is applicable):
o In-charge of construction on Building o Gen Set – Foundation design w/
Permit form (box 7) must be signed & computation of factor of safety
sealed by Civil Engineer for structural o Air-conditioning System-cooling load
works only (3-storey & above). design analysis.
E. Plumbing / Sanitary: o Machineries, heavy equipment with
E.1. For Residential Buildings: motor-foundation design.
o Plumbing / sanitary plans and forms must o Legend/ mechanical symbols.
be signed and sealed by Master o Technical specification of equipments.
Plumber, including but not limited to the o General notes of mechanical Rules &
plumbing/ sanitary lay-out plan. Requirements.
o Undertaking on the plan must be signed G.2. For Fire Protection, pls. indicate
by the owner. the following:
o Septic vault capacity design analysis on o Size of pipes on the lay-out plan.
the plan. o Piping legends/ all type of
o Septic vault plan & details should conform accessories.
with the capacity design analysis o Schematic Riser diagram of piping
recommended dimensions. installation.
o Catch basin plan and details o Schedule of capacity of fire and
E.2. For Commercial Buildings, Malls, jockey pumps.
Hotels, Restaurants, etc. o Hydraulic pressure computation and
o Plan and details of cistern tank (if analysis, if needed.
applicable). Electronics:
o Plan and details of Sewage Treatment o Electronics plan & forms must be
Plant (STP) if applicable. signed & sealed by PECE
o Plan and details of grease trap/s (for o General Layout plans w/ legends
restaurants) o Single line diagram
F. Electrical: o Isometry of the system
o Electrical Plan and Forms must be signed o Equipment specifications
and sealed by PEE (Professional o Design Analysis, as applicable
Electrical Engineer). o Cost estimates
F.1. Electrical Plan contents: o Latest photocopy of PTR, PRC, CTC
o Electrical layout & TIN By PECE
o Design Analysis
o Design Analysis
o Schedule of Loads
o Single Line Diagram
o Symbol and Legend
o Complete Electrical Specification
o Voltage Drop Calculation
o Short Circuit Test Computation
F.2. Inspection:
o Vertical / Horizontal Clearance from
MORE primary Lines (not less than 2.3
Horizontal/3.8m-Vertitcal @ 750 V-
22KV).

G. Mechanical:
o Mechanical plans & forms signed &
sealed by a Prof. Mechanical Engineer.
o Indicate all mechanical equipment with
specified capacity of unit in horsepower
and the location of the unit on the plan.
o Tabulated schedule of mechanical
Equipment indicating the number of
units, capacity ad type of equipment.
o Mechanical installation details,
configuration and label the different
parts of equipment / machineries