Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Denah Lantai 1 Skala 1: 100 Denah Lantai 2 Skala 1: 100 Denah Lantai 3 Skala 1: 100

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

150 150 200 150 150 150 150 200 150 150 150 150 200 150 150

KM/WC D
KM/WC DAPUR +0.75 DAPUR KM/WC KM/WC KM/WC KM/WC KM/WC
200

200

200
VOID VOID VOID VOID
+0.75 +0.75 +0.75 +0.75 +3.95 +3.95 +7.95 +7.95
345

345

345
TEMPAT TEMPAT TEMPAT TEMPAT
145

145

145
WUDHU WUDHU WUDHU WUDHU
KAMAR TIDUR KAMAR TIDUR +3.95 +3.95 +7.95 +7.95
+0.80 +0.80
C

80

80

80
175
327

327

327
152

80

80

80
1300

1300

1300
RUANG TERBUKA B RUANG TERBUKA RUANG TERBUKA
+0.80 +4.00 +8.00

80

80

80
328

328

328
80

80

80
A
300

AREA PARKIR AREA PARKIR AREA PARKIR AREA PARKIR AREA PARKIR AREA PARKIR
206

206
+0.15 +0.15

300 200 300 300 200 300 300 200 300


800 800 800

1 2
DENAH LANTAI 1 DENAH LANTAI 2 DENAH LANTAI 3
Skala 1 : 100 Skala 1 : 100 Skala 1 : 100

October 28, 2021 Project Location P ROJECT TITLE A 08


356

356

356

356
323

313
+8.00
400

400
+4.00
400

400
1280

1280
+4.00
400

480
+8.00

150
120
80

+0.00
Muka Tanah Muka Tanah
250

250

250

250
800 1000

1 2 A B C D

POTONGAN A-A
Skala 1 : 100 POTONGAN B-B
Skala 1 : 100

October 28, 2021 Project Location P ROJECT TITLE A 08


356

356

356

356
323

313
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1
+12.00

RB-1
400

400
K-1 K-1 K-1 K-1 K-1 K-1

+7.95 +8.00 +7.95 B-2

B-1 B-1 B-1 B-1 B-1

B-1
400

400
B-3

1280

1280
K-1 K-1 K-1 K-1 K-1
K-1

+3.95 +4.00 +3.95


B-2
B-1 B-1 B-1 B-1 B-1

B-1
400

B-3

480
K-1 K-1 K-1 K-1 K-1
K-1

+8.00

150
120
80

+0.00
Muka Tanah Muka Tanah
S-1 S-1 S-1 S-1 S-1 S-1
P-2

100
S-1
250

250

250

250
P-1 P-1 P-1 P-1 P-1 P-1

800 1000

1 2 A B C D

POTONGAN A-A STRUKTUR


Skala 1 : 100 POTONGAN B-B STRUKTUR
Skala 1 : 100

October 28, 2021 Project Location P ROJECT TITLE A 08


150 150 200 150 150 150 150 200 150 150

P-1 KP KP KP KP P-1 KP KP KP KP
K-1 K-1 K-1 K-1
S-1
S-2 S-2 S-2 B-1 B-2 B-2 B-2 B-2
S-2 S-2 P-1 P-1
P-1
345

345
KP KP KP KP
KP KP KP B-2 B-2 KP
S-1 P-1 P-1
P-1 P-1
K-1 K-1 K-1 K-1

B-1
C C
327

327
KP KP B-1 P-1 B-1

KP KP
S-2
P-1 P-1

1300

1300
K-1 K-1 K-1 K-1

S-1 B-1

P-1
328

328
S-1 S-1 B-1 B-1

S-1 B-1
P-1 P-1
K-1 K-1 K-1 K-1

P-2
300

300
P-2 P-2 P-2 P-2
K-2 K-2 K-2 K-2

285 200 285 285 200 285

800 800

DENAH PONDASI DENAH KOLOM,BALOK,PLAT LANTAI 2


Skala 1 : 100 Skala 1 : 100

October 28, 2021 Project Location P ROJECT TITLE A 08


150 150 200 150 150 150 150 200 150 150

KP KP KP KP
K-1 K-1 K-1 K-1

B-1 B-2 B-2 B-2 B-2 RB-1 RB-2 P-A


P-2 P-2 P-2
345

345
RB-1
KP KP
KP B-2 B-2 KP
P-2 RB-1
P-2
K-1 K-1 K-1 K-1

B-1 RB-1
327

327
B-1 P-2 B-1 RB-1 RB-1

1300

1300
K-1 K-1 K-1 K-1

B-1 RB-1

P-2
328

328
B-1 B-1 RB-1 RB-1

B-1 RB-1

K-1 K-1 K-1 K-1

P-2
300

300
285 200 285 285 200 285

800 800

DENAH KOLOM,BALOK, PLAT LANTAI 3 DENAH RING BALOK


Skala 1 : 100 Skala 1 : 100

October 28, 2021 Project Location P ROJECT TITLE A 08


DETAIL TULANGAN BALOK DAN RING BALOK DETAIL TULANGAN KOLOM
Note :
KODE S1 S2 Mutu Beton : K300
KODE K1
POSISI Tumpuan Lapangan Tumpuan Lapangan Mutu Tulangan POSISI Tumpuan Lapangan

3 3
- Ulir : BJTS 30
D8 - 100
3 3 3 3
5 D 16 5 D 16

20
2 D 12

20
2 D 12
- Polos : BJTP 24 3 D 16 3 D 16

POTONGAN 35 35
D8 - 75 D8 - 75
POTONGAN D10 - 50 D10 - 50

- Wire Ulir : U50


2 D 10 2 D 10
D10 - 75 D10 - 75 2 D 12 2 D 12
35 2 D 16
35 2 D 16
3 D 16 3 D 16 15 15 3 D 16 3 D 16

25 25
35 35
DIMENSI 250 x 350 250 x 350 150 x 200 150 x 200

TULANGAN ATAS 3 D16 3 D16 2 D12 2 D12 DIMENSI 350 x 350 350 x 350
TULANGAN SAMPING TULANGAN UTAMA 8 D16 20 D16
TULANGAN BAWAH 3 D16 3 D16 2 D12 2 D12 SENGKANG
SENGKANG
KODE KP
KODE B1 B2 B3
POSISI Tumpuan Lapangan
POSISI Tumpuan Lapangan Tumpuan Lapangan Tumpuan Lapangan

3 3 2 D 12 2 D 12

12 D 16

5 D 16
3 3 3 3 15 D8 - 100
15 D8 - 100

3 D 16 3 D 16 3 D 16 3 D 16
POTONGAN 2 D 12 2 D 12

50 50
POTONGAN
2 D 10 2 D 10
30 D10 - 75
30 D10 - 75
30 D10 - 75
30 D10 - 75 15 15
3 D 16 3 D 16 3 D 16 3 D 16
5 D 16

12 D 16
20 20 20 20
35 35
DIMENSI 150 x 150 150 x 150

TULANGAN UTAMA 4 D12 4 D12


DIMENSI 350 x 500 350 x 500 200x 300 200 x 300 200x 300 200 x 300
SENGKANG
TULANGAN ATAS 10 D16 6 D16 3 D16 3 D16 3 D16 3 D16

TULANGAN SAMPING

TULANGAN BAWAH 6 D16 12 D16 3 D16 3 D16 3 D16 3 D16

SENGKANG

KODE RB1 RB2


POSISI Tumpuan Lapangan Tumpuan Lapangan

3 3 3 3
5 D 16 3 D 16
3 D 16 3 D 16

POTONGAN 30 30
POTONGAN B-B STRUKTUR
D10 - 75 D10 - 75
40 2 D 12
D12 - 50
40 2 D 12
D12 - 100
3 D 16 3 D 16
3 D 16 5 D 16

20 20
20 20 Skala 1 : 100
DIMENSI 200 x 400 200 x 400 200 x 300 200 x 300

TULANGAN ATAS 5 D16 3 D16 3 D16 3 D16

TULANGAN SAMPING

TULANGAN BAWAH 3 D16 5 D16 3 D16 3 D16

SENGKANG

October 28, 2021 Project Location P ROJECT TITLE A 08


DETAIL TULANGAN PELAT WIREMESH 35

TULANGAN WIREMESH TULANGAN PELAT RANGKAP


LAPIS ATAS KANTILEVER

3 D 16
1/4LX 1/4LX

250
D10 - 75
M8 - 100 LX LX

1/4LX 1/4LX

1/4LY 1/4LY 1/4LY 1/4LY


LY LY
150
5 13 D 16
TULANGAN WIREMESH
LAPIS BAWAH

3 D 16
15 D 16
1/4LX
D10 - 75

150

150
35
2 D 16
3 D 16
M8 - 100 LX

1/4LX
150 150
1/4LY 1/4LY
LY

DETAIL PONDASI TELAPAK P1


DETAIL PENULANGAN PLAT LANTAI Skala 1 : 100
No Skala

October 28, 2021 Project Location P ROJECT TITLE A 08


SLOF 15X20 (S2)

TIMBUNAN TANAH PASANGAN BATU BATA


LANTAI KERJA t=8mm
PLAT LANTAI WIREMES M8 t=12mm

K-1 K-1

Muka Tanah Muka Tanah

25 25

60 60

70 70

25 25

60
DETAIL PONDASI C - C 60

70 70
Skala 1 : 50

October 28, 2021 Project Location P ROJECT TITLE A 08

You might also like