2 PDF
2 PDF
2 PDF
Y
Y 3.50
3.50
2.30 1.20
UP
A B
3.50
2.00
2.00
2.00
2.00
CR TOP OF PARAPET
CR
1.00
D2
TOP OF THE BEAM
0.40
D1 DOWN
2.80
X
X
4.40
4.60
4.60
4.40
VAPE SHOP
7.20
2ND FLOOR FIN. LINE
3.00
2
2
0.85
ROLL-UP DOOR
D1
2.00
1.85
2.00
GROUND FLOOR FIN. LINE
1.15
0.40
Y Y FRONT ELEVATION
SCALE 1:100M
1 2 B A 2 1
TOP OF PARAPET TOP OF PARAPET TOP OF PARAPET
1.00
1.00
1.00
TOP OF THE BEAM TOP OF THE BEAM TOP OF THE BEAM
ACU
2.80
2.80
2.80
7.20
7.20
7.20
2ND FLOOR FIN. LINE 2ND FLOOR FIN. LINE 2ND FLOOR FIN. LINE
FIRE WALL
3.00
3.00
3.00
GROUND FLOOR FIN. LINE GROUND FLOOR FIN. LINE GROUND FLOOR FIN. LINE
0.40
0.40
0.40
LEFT-SIDE ELEVATION REAR ELEVATION RIGHT-SIDE ELEVATION
SCALE 1:100M SCALE 1:100M SCALE 1:100M