Bisare HW Report Aftr Comment Final & BOQ

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 98

River Cross Section at Weir Site

Partial Commulative
x y Distance Distance z
373357.968 756336.883 0 0 1749.927
373347.389 756320.574 19.440 19.440 1745.75
373335.588 756304.635 19.832 39.272 1744.871
373326.095 756288.61 18.626 57.898 1744.863
373321.899 756279.273 10.237 68.134 1744.962
373319.5795 756275.5238 4.409 72.543 1743.356
373314.204 756262.395 14.187 86.729 1744.702
373300.524 756248.397 19.573 106.302 1745.272
373292.254 756236.234 14.708 121.010 1746.385
373281.268 756221.91 18.052 139.062 1746.907
373267.418 756216.096 15.021 154.083 1749.557

River X-Section
1752
1750
1748
1746
1744
1742
1740
0 20 40 60 80 100 120 140 160

Determination of River Bed Slope


Par.dis Cum.Dis. X Y Z Code
0 0 373317 756176.926 1745.343 RC
96 96 373323.55 756273.109 1744.228 RC
36 133 373350.41 756248.956 1743.798 RC
26 159 373332 756267.486 1743.442 RC
75 234 373275.21 756317.076 1743.051 RC
54 289 373315.01 756279.861 1742.516 RC

River Longitudinal Section


1746
1745
f(x) = − 0.00957027071844 x + 1745.18134777039
River Longitudinal Section
1746
1745 f(x) = − 0.00957027071844 x + 1745.18134777039
1744 R² = 0.977317907120847
1743
1742
1741
0 50 100 150 200 250 300
0,1749.927
19.4396173316147,1745.75
39.271796284046,1744.871
57.8975224175707,1744.863
68.1340249940796,1744.962
72.5427187791491,1743.356
86.7293811663442,1744.702
106.301974351765,1745.272
121.010185289808,1746.385
139.062032065176,1746.907
154.082854146524,1749.557

140 160 180


300 350
Bisare River base flow=0.183m3/s, 50yrs Max. flood=110m3/s, 50yrs Mim. Q= 0.1193m3/s

High flood Level Determination


The flood discharge of the different values and the cooresponding water depth is
computed as shown.
Roughness coffecient,N= 0.025 (Alluvial silt)
Average River bed slope = 0.009
Wetted
Water Hydraulics Velocity
Sr.Nr Elevation (m) Area (m2) Perimeter
Depth (m) Radius (m) (m/sec)
(m)
1 1743.360 0 0.000 0.000 0.000 0.00
2 1743.610 0.25 0.048 0.629 0.076 0.68
3 1743.860 0.5 0.503 4.728 0.106 0.85
4 1744.110 0.75 2.236 9.547 0.234 1.44
5 1744.360 1 5.072 13.565 0.374 1.97
6 1744.610 1.25 8.933 18.179 0.491 2.36
7 1744.860 1.5 15.443 31.645 0.488 2.35
8 1745.110 1.75 29.242 67.819 0.431 2.17
9 1745.360 2 47.130 77.0027 0.612 2.74
10 1745.610 2.25 66.913 81.8756 0.817 3.32
11 1745.660 2.3 71.001 82.7569 0.858 3.43

From the rating curve, the maximum flood=110 m3/sec is corresponding


to the tail water depth,y=1.93 m.Hence the D/s high flood level=1745.29
Q= 0.1193m3/s

ater depth is

Discharge
(m3/sec) Discharge Elevation
(m3/sec) (m)
0.00 0.00 1743.360 DischargevsElevation(m)
0.03 0.03 1743.610 1746.0

0.43 0.43 1743.860 1745.


3.22 3.22 1744.110 1745.0
9.99 9.99 1744.360
174.5
21.11 21.11 1744.610
36.33 36.33 1744.860 174.0
63.33 63.33 1745.110 1743.5
128.92 128.92

m
1745.360

E
a
v
e
t
i
ln
o
,
1743.0
221.95 221.95 1745.610
243.27 243.27 1745.660 1742.5

1742.0
0. 50. 10. 0 150. 20. 0 250. 30 .0
Dischargem3/s
Calculate by Excell
Inpute Data

Table: water depth over the weir crest including Velocity head

SN Description Unit

1 water depth over the weir crest including Velocity head m

1.1 Crest length of weir ( over flow section ) m


1.2 discharge coefficient for broad crested weir

1.3 The peak design flood of 50 yrs return period m3/sec

Table: Calculated water depth over the weir crest Excluding Velocity head

SN Description Unit

2 Calculated water depth over the weir crest excluding Velocity head m

2.1 water depth over the weir crest including Velocity head m

2.2 The peak design flood of 50 yrs return period m3/sec


2.3 Weir height m
2.4 Asumed Hd m

2.5 Crest length of weir ( over flow section ) m


2.6 Approach Area m2
2.7 Approach velocity m/s
2.8 Velocity Head m
2.9 Asumed Hd - Calculate Hd=0 m

By trail and error or


On Excell Goal seek,ByChanging Asumed Hd (SN=2.4) and make Asumed Hd - Ca
Table: Design of the weir section

SN Description Unit

3 Calculated water depth over the weir crest excluding Velocity head m
3.1 Weir height m
3.2 Specific gravity of weir body material
3.3 Top width of weir wall m
3.4 Take m
3.5 Bottom width of weir wall m
Take m
The upstream face shall be kept vertical
The selected weir section become
Weir height m
Top width of weir wall m
Bottom width of weir wall m
0.5*Hd m
2*Hd m
For the weir to be broad crested
For the weir to be broad crested
Table: Water profile over the weir

Description Unit
4 Applying energy equation between sections1 and 2
4.1 Applying energy equation at sections1 m
4.2 water depth over the weir crest including Velocity head m
4.3 Weir height m
4.4 Velocity at point 2 m/s
4.5 Discharge intensity m3/sec/m

Assume initial depth Y1 which is less than Yc

4.6 m

4.7 Applying energy equation at sections 2 m


4.8 energy equation at sections 2 - energy equation at sections 1=0 m

By trail and error or


On Excell Goal seek,ByChanging Asumed Y1 (SN=4.6) and make energy equation at sections 2 - energy equa
Description Unit
Critical flow depth m
incoming Froud number

Sequent depth m

Tail water depth m


Case-3 govern this design

Case-1

Case-2

Case-3

Head loss or dissipation energy as result of the jump m

The stilling basin length is given by the length of jump m

River bed level @ weir site m


Weir height m

Crest level of the weir m


water depth over the weir crest including Velocity head m

U/s HFL=Upstream water level m

U/S TEL m

Retrogression m

D/s HFL=D/S water level m


Hav3 d/s Velocity head m
D/S TEL =D/S HFL +Hav3 m
Afflux = H+Hd-TWD m
Normal Scour depth R=1.35*(q^2/f)^(1/3)
Cistrern Level=D/S HFL-Y2
D/S RBL= RBL-Retrogression
Hw, Percolation Head (static water level)
Hw, Percolation Head (dynamic water level)

Back water curve length(BL)


Back water length------------Y=(Xs-2∆o)2 /4∆o------ Goal seek until=0.00 ►
Bychanging ---------------------------X ►
river slope
∆o=H+Hd-TWD
TWD
Hd
WEIR HEIGHT (H) =
y head

Qty Symbol Formula

The discharge over broad crested


weir is given by
Q= Cd*Le* He 3/2
Q= design flow
0.026 He He=(Qd/(Le*Cd))^(2/3)

60.000 Le
1.700 Cd

0.430 Q

Qty Symbol Formula

Hd=He-Ha ,
0.026 Hd The discharge over broad crested weir
He=Ha+Hd
is given by
Q= Cd*Le* He 3/2
Q= design flow
0.026 He He=(Qd/(Le*Cd))^(2/3)

0.430 Q
1.600 h
0.026 Hd

60.000 Le
97.566 A A=Le*(h+Hd)
0.004 Va Va=Qd/A=Qd/(h+Hd)*Le
0.000 Ha Ha=Va2/2g
0.000

or or
d make Asumed Hd - Calculate Hd=0 (SN=2.9)
Qty Symbol Formula
Hd=He-Ha ,
0.026 Hd He=Ha+Hd
1.600 h
2.140 G MoWR
0.024 b b=(Hd+Ha)/(G-1)1/2
0.100
1.523 B B=(h+Hd+Ha)/(G-1)1/2
1.600

1.600 h
0.100 b
1.600 B
0.013
0.052
OK 0.5*Hd < b < 2*Hd
OK 0.5*Hd < b < 2*Hd

Qty Symbol Formula

H+Hd +Va2/2g = Y1+V12/2g=He+H


1.626 H+Hd +Va2/2g = He+H
0.026 He
1.600 h
5.646 V1 V1=q/Y1
0.007 q=Q/Le

solve for Y1 by trial & error. This results


three solution sets forY1; two positive
values & one negative value. Ignore the
negative value & adopt the positive one
that is less than the critical depth, Yc. Y1
must be less thanYc since the flow before
0.001 Y1 the jump is super critical.

1.626
0.000

or
uation at sections 2 - energy equation at sections 1=0 (SN=4.8)
Qty Symbol Formula
0.017 Yc dc=Yc =( q2/g)1/3
50.593 Fr1 Fr1=V1(/g*y1)1/2

0.090 Y2 Y2=Y1/2*[-1+(1+8*Fr12)1/2]

1.930 Y3
design

y3=y2

y3<y2

y3>y2

1.535 HL HL=(Y2-Y1)3/4Y1*Y2
Lj = 5*(y2-y1)
0.445 Lj

1743.360 RBL
1.600 h

1744.960 Crest Level =RBL + h


0.026 He Hd+Ha

U/s HFL=Crest level of the weir +Hd


=RBL+h+Hd
1744.986

U/s TEL =U/s HFL+ Va2/2g


1744.986 U/S TEL =U/S HFL +Ha

0.500
D/s HFL=RBL+Y3-r
1744.790
0.000 Hav3=v3^2/2g, v3=q/y3
1744.790
-0.304
0.061 f=1.76(d50)^0.5=0.56
1743.360 D/S Apron Level
1742.860 Assume Retrogression=0.5m
2.100 Crest level-D/S RBL
0.196 U/S HFL-D/S HFL

l=0.00 ► 0.00
159.67
0.009
0.70
1.93
1.03
1.60
Remark

goal seek to limlit afflux value to <1.2m(safe value)


by changing Le…Garg page=587
MoWE

Remark
He=Hd+Ha=Hd+Va2/2g----1
Va=Q/A=Q/[Le*(h+Hd)]----2
Substituting equation (2) in equation (1)
and solve for Hd by trial and error.
Remark

for masonry 2.1

Remark
**Apply Bernoulli's Equation between 0 &
1
( h+He)=Y1+V21/2g
**Apply the continuity equation Q=V1*A ,
q=Q/Le
V1=q1/y1
*Y1 must be less than YC since the flow before the jump is

supercritical.

*Y1 must be less than Yc for the jump to occure

the flow before the jump is super critical

*flow after the jump is sub critical so Should satsfay Y3>Yc

Y1 has three solution

One Negative has no physical meaning

Other two postive and the solution is the one with Y3>Yc>Y1

6.839552
2.384275
Remark

Fr1>1 which implies the flow is super critical

*From stage
*flow after thedischarge curve
jump is sub Called
critical Normal
so Should Water
satisfy Y2>Yc
Depth
*Precondtion to jump occure is Y2>Yc>Y1
*Otherwise
Tail water
nodepth
jump (the depth of water on the river when
the peak flood is passing on the river at the selected
weir site 0.949741 0.045974
1.246939 0.079249

*jump occures on appron or on toe of weir


*In practice this condtion hardly fulfilled because
little difference between actual and assumed value
of hydraulic properties of the structure and the
river will cause the jump to move from the
calculated postion
*Consequently some device to control the postion
of the jump is always neccessary 6.839552 2.652275 2.573026

*The jump will recede D/S to a point where the


flow condtions allow the jump to occure
*Jump moves away from scour-resisting appron
and will takes place on river chanal
*Remedy:-Use a certain control structure in
appron to ensure the jump occures within the
proteceted appron.
*For this case a slopping apron should be
provided in order to allow the jump to occur on
this apron at the toe of the weir by taking the
bed of the stilling basin below the river bed
level.
*depression in the downstream apron has to
be provided in order to accommodate Y2
*The dissipated energy as a result of the jump
becomes HL
*Summerged jump
*Jump on sloping face
*Most stable one
pp584 Garg
River bed level+Tail water depth from stage
discharge curve- retrogression

m
m

m
m
m
Height an
U/S D/s Seepage U/S cut off
Flow Condition water water head
level (m) level (m) (m) FC 100% FD
76.77%

2.14 1.643
No flow 1744.96 1742.82 2.14
1744.96 1744.463
1.197 0.919
High flood
1745.99 1744.79 1.197 1745.987 1745.709

t,Floor thickness
H,Resudial =H/(G-1)
Points P,Pressure (%) head=P*Hw/100 (m) (m)

X 58.852 1.259 1.14

Y 44.675 0.956 0.87


Z 37.586 0.804 0.73
Height and Elevation
S cut off D/s Cut off

FE FE1
FD1 26.51% FC1 0%
73.03% 32.86%
P(%) 37.5859
1.563 0.703 0.567 0
1744.383 1743.52 1743.39 1742.82
0.874 0.393 0.317 0 73.03 1744.383
1745.664 1745.18 1745.1 1744.79 1743.62
32.86 1743.523

0 1742.82
0.268

t,Floor thickness Actual


H/(G-1) thickness
(m) provided (m) Remark 0.567 1743.39

1.14 1.5

0.87 1 P is calculated
by direct
0.73 0.8 interpolation
1744.383 0
7.5
1743.523 8.5
1743.62

1742.820 0
Y1= 0.268

1743.390 0.567

1743.09
2.6.2.1 Comparsion b/n Tail water and hydraulic Jump curve
Cistern
Le(m)= 60 level= 1743.4 m D/S RBL(m)=
Crest
level= 1744.96 m Weir height= 1.6 Retrogression,r=
Table-2:1 Comparsion b/n Tail water & hydraulic jump depth
He=Hd+q U/s
q=Q/Le U/s v=1/
Q He=(Q/ ^2/ HFL=CL+He-
(m3/s/m Hd ha=He-Hd TEL=U/sH N*R^(2/3)*S^0.5
(m3/s) CLe)2/3 (m) ((h+Hd)^2 ha
) FL+ha (m) (m/s)
*(2*9.81) (m)
0.43 0.03 0.01 0.026 0.000 0.03 1744.986 1744.986 0.85
3 0.10 0.05 0.095 0.000 0.10 1745.055 1745.055 1.44
10 0.21 0.17 0.212 0.001 0.21 1745.172 1745.173 1.97
21 0.35 0.35 0.347 0.002 0.35 1745.307 1745.309 2.36
36 0.50 0.60 0.495 0.004 0.50 1745.455 1745.459 2.35
63 0.73 1.05 0.715 0.010 0.73 1745.675 1745.685 2.17
110 1.05 1.83 1.027 0.025 1.05 1745.987 1746.012 2.62
129 1.17 2.15 1.138 0.031 1.17 1746.098 1746.129 2.74
222 1.68 3.70 1.612 0.067 1.68 1746.572 1746.639 3.32
Vav= 1.97

Ef1=U/S F1=(q2/ Y2=y1/2*((1


HL=U/sTEL- TEL-BL Ef1=y1+q^2/ (g*y1^3))^0 V1=q/y1 +8f1^2)^.5-
q(m3/s/m) D/s TEL (m) (2gy1^2) .5 Y1 (m) (m/s) 1) (m) v2=q/y2 (m/s)
0.01 1.626 1.626 2.619 72.357 0.001 7.167 0.102 0.070
0.05 1.445 1.695 1.582 18.697 0.009 5.556 0.234 0.214
0.17 1.312 1.813 1.834 11.357 0.028 5.952 0.436 0.382
0.35 1.197 1.949 1.979 8.211 0.057 6.140 0.634 0.552
0.60 1.095 2.099 2.087 6.440 0.096 6.250 0.828 0.725
1.05 1.065 2.325 2.329 5.189 0.161 6.522 1.104 0.951
1.83 1.197 2.652 2.653 4.219 0.268 6.841 1.471 1.247
2.15 1.238 2.769 2.777 3.996 0.309 6.958 1.599 1.345
3.70 1.462 3.279 3.281 3.331 0.501 7.385 2.123 1.743

Comparsion b/n tail water and hydraulic jump curve


2.5
Water Depth (m)

1.5

Tail water curve


Hydraulic Jump
Curve
1

0.5

0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
discharge intensity,q (m3/s/m)

When TWC is lying above y2 curve at all discharges.


5.4m

1.2m masonry cutoff with 0.6m open joints


NB:-The opening b/n blocks is filled with filter material
rve

1743.36 C= 1.7

0.5 m

Tail water D/s D/S


h=v2/
depth,TWD HFL=BL+ TEL=D/S
(2*g) (m)
(m) TWD-r (M) HFL+ha(m)

0.037 0.5 1743.360 1743.36


0.106 0.75 1743.610 1743.61
0.198 1 1743.860 1743.86
0.285 1.25 1744.110 1744.11
0.282 1.5 1744.360 1744.36
0.239 1.75 1744.610 1744.62
0.350 1.93 1744.790 1744.81
0.383 2 1744.860 1744.89
0.562 2.25 1745.110 1745.18

TW-Y2
0.40
0.52
0.56
0.62
0.67
0.65
0.46
0.40
0.13

Tail water curve


Hydraulic Jump
Curve

s.
Weir Protection
Inorder to avoid cracking and shearing of the weir and the apron during overflowing and incoming of
logs, RC of thickness 200 mm is provided with proper anchoring and capping.
The nominal reinforcement is taken as 0.15% of the concrete cross sectional area
per meter width.Hence Asteel=0.0015*1000*200
Asteel= 300
Hence Provide Ø12 @ C/C 400mm.
Actual area of steel=3.14*12^2/4*3 3= number of bars per unit meter with 40cm C/C
Actual area of steel= 339.12
Since Asteel=300m2<339.12m2
Covering of the reinforcement=50mm+12/2
Covering of the reinforcement= 56
The spacing of the reinforcement bar should be lessthan three times the effective
depth or 450 mm which is smaller of the two.
Effective depth,de=200-56
Effective depth,de= 144
Hence the actual spacing,400mm<3*144
The actual c/c spacing,400mm<432mm.Hence it is ok.
The spacing @ c/c should be account the diameter of the reinforcement when
intermidate smaller or larger size of the reinforcement is applied during actual
operation.
This capping should be applied for divide wall with reinforcement size of
F12 mm with C/c spacing of 300 mm.
Actual steel area=3.14*12^2*4/4
Actual steel area= 452.16 Since 314mm2>300,it is ok.
C/c spacing=300mm<3*(200-50-12/2)mm
C/c spacing= 300mm< 432
This capping detail is provided for the weir check the design
drawing for further information.
ng and incoming of

meter with 40cm C/C


Bill No. 1 General Items
Quantit Rate
Unit
Item Describition y (Birr)
1.1 Allow for mobilization L.S 1 90071.89
1.2 1 10864.7
Allow for demobilization L.S

Allow for contractors camp facilities -4*5m 2,


Living room for contractors key personel, G-28
galvanized coruugated sheet(roofing and
external wall) and internaly painted clipwood No. 3 53470
wall, Masonry floor cement screened and well
ventilated room complete with doors and
windows.
1.3
5*5m2, store constructed from G-28 galvanized
coruugated sheet with doors and windows, No. 1 39922.69
Masonry floor cement screened

Barbed wire fence 50*20m and 1.5m high


treated timber post complete with 3m wide gate No. 1 14158.08
and a G-28 galvanized coruugated sheet guard
house (1.5*2m)
Dewatering of open trenches and excavation,
1.4 temporary diversion of the river flow and 1 43,310.00
pumps L.S

1.5 Provide project indicator post starting from the 1 4000


construction time L.S
1.6 Provision of as built drawings for the project L.S 1 8000
Total for General Items

NB:- The camp site should be selected by the Engineer in colaboration with the community considering the future c
camp as an office or any other purposes. It should be at higher elevation (i.e. above main canal) or in the infertile ar

Cost Summary
S.N Description Cost
1 General Item 370,737.36
2 Head Work 4,708,539.66
3 Infrastructure 3,281,103.40
4 Farm Structures 104,709.52
5 Total 8,465,089.94
6 Contingency (10%) 846,508.99
7 Total 9,311,598.93
8 VAT (15%) 1,396,739.84
9 Total including VAT 10,708,338.77
10 Cost per Hectar 125,097.42
Amount
(Birr)
90071.89
10864.7

160410

39922.69

14158.08

43310

4000

8000
370,737.36

considering the future consumption of the


nal) or in the infertile area, if any.
Bill No. 2- Engineering Price estimate for Bisare Head work project

Describition Unit
A. Head Work structures
Head Work
1 Weir body

1.1 Site clearing m2


1.2 Hard rock excavation M3
1.3 Earth excavation M3
1.4 Lean Concrete (C10) (1:3:6) M3
1.5 Massonry with 1:3 cement mortar M3
1.6 Reinforced Concrete
1.6.1 Concrete (C20) (1:2:3) M3
1.6.2 Reinforcing bars ф 12 Kg
Subtotal
2 Undersluice left side
2.1 Hard rock excavation M3
2.2 Earth Excavation M3
2.3 Massonry with 1:3 cement mortar M3
2.4 Lean Concrete (C10) (1:3:6) M3
2.3 Reinforced Concrete
2.3.1 Concrete (C20) M3
2.3.2 Reinforcing bars ф 12 Kg
Subtotal
3 Undersluice right side
3.1 Hard rock excavation M3
3.2 Earth Excavation M3
3.3 Massonry with 1:3 cement mortar M3
3.4 Lean Concrete (C10) (1:3:6) M3
3.5 Reinforced Concrete
3.5.1 Concrete (C25) (1:1:2) M3
3.5.2 Reinforcing bars ф 12 Kg
Sub total
4 Upstream apron
4.1 Hard rock excavation M3
4.2 Earth Excavation M3
4.3 Concrete (C25) (1:1:2) M3
4.4 Reinforcement bar Ø12 Kg
Sub total
5 Downstream apron
5.1 Hard rock excavation M3
5.2 Earth Excavation M3
5.3 Masonry M3
5.4 Concrete (C25) (1:1:2) M3
5.5 Reinforcement bar Ø12 Kg
Sub total
6 Downstream Pervious Protection
6.1 Earth excavation M3
Filter material(size of the filter material is determined by
6.2 the Engineer) M3
6.3 Riprap placing 60cm thick (30cm stone size) M3
Sub total
7 Breast wall left side
7.1 Reinforced Concrete
7.1.1 Concrete (C20) (1:2:3) M3
7.1.2 Reinforced bars ф 12 Kg
Sub total
8 Breast wall Right side
8.1 Reinforced Concrete
8.1.1 Concrete (C20) (1:2:3) M3
8.1.2 Reinforced bars ф 12 Kg
Sub total
9 Divide wall left side
9.1 Hard rock excavation M3
9.2 Earth Excavation M3
9.3 Massonry with 1:3 cement mortar M3
9.4 lean Concrete (C10) (1:3:6) M3
9.5 Plastering with 1:3 cement mortar M2
Sub total
10 Divide wall right side
10.1 Hard rock excavation M3
10.2 Earth Excavation M3
10.3 Massonry with 1:3 cement mortar M3
10.4 lean Concrete (C10) (1:3:6) M3
10.5 Plastering with 1:3 cement mortar M2
Sub total
11 U/S Left side wing wall
11.1 Hard rock excavation M3
11.2 Earth Excavation M3
11.3 Back fill M3
11.4 Lean concrete (C10) (1:3:6) M3
11.5 Massonry with 1:3 cement mortar M3
11.6 Plastering with 1:3 cement mortar M2
Sub total
12 U/S Right side wing wall
12.1 Hard rock excavation M3
12.2 Earth Excavation M3
12.3 Back fill M3
12.4 Lean concrete (C10) (1:3:6) M3
12.5 Massonry with 1:3 cement mortar M3
12.6 Plastering with 1:3 cement mortar M2
Sub total
13 D/S Left side wing wall
13.1 Hard rock excavation M3
13.2 Earth Excavation M3
13.3 Back fill M3
13.4 Lean concrete (C10) (1:3:6) M3
13.5 Massonry with 1:3 cement mortar M3
Sub total
14 D/S Right side wing wall
14.1 Hard rock excavation M3
14.2 Earth Excavation M3
14.3 Back fill M3
14.4 Lean concrete (C10) (1:3:6) M3
14.5 Massonry with 1:3 cement mortar M3
Sub total
15 Operating slab for under sluice
15.1 Reinforced Concrete
15.1.1 Concrete (C20) M3
15.1.2 Reinforced bars ф 12 Kg
Sub total
16 Operating slab for oftake canal
16.1 Reinforced Concrete
16.1.1 Concrete (C20) M3
16.1.2 Reinforced bars ф 12 Kg
Sub total
17 Gates
Under sluice gate installation, the gate consists the following par *
17.1 ∅70mm stem, 1.40m length *9mm No.
thickness sheet metal 1.3mX1m for each
*50mmX50mmX10mm angle iron, 2.5m length * ∅12mm
bar for anchorage, 2kg for each *20mmx20mm
square iron with 2mm thickness 2.5m length for each

Off take canal gate installation, the gate consists the following parts:
* ∅70mm
stem, 3.00m length *6mm thickness
17.2 sheet metal 0.50mX0.70m *50mmX50mmX10mm angle No.
iron, 3m length *∅12mm bar for anchorage,3kg for each
20mmx20mm square iron with 2mm thickness2.5m length for each

Sub total
Total
project
Unit
Quantity Rate Total Cost Remark
Area of Cyclopean concr
Area of capping
Length of rienforcement
including
1747.5 9.00 15727.50 protection
44.62 775.38 34597.46
720 29.27 21074.40 Area of concrete
87.68 1549.01 135817.20 Area of C7 concrete
179 1200.00 215040.00 Length of reinforcement

56.45 2424.69 136868.90 1.31


496.70 37.00 18377.90 6.77 Area of Cyclopean concr
577,503.35 16.92 no of bars Length of rienforcement
0.89 kg/m
0.50 775.38 387.69 88.14 m
1.76 29.27 51.52 1324.12
2.10 1200.00 2518.92
0.14 1549.01 217.17
1.98
0.00 2424.69 0.00
0.00 37.00 0.00 4.52
3,175.30 11.30
0.88
0.50 775.38 387.69 1.00
2.40 29.27 70.25
2.10 1200.00 2520.00
0.14 1549.01 216.86

0.00 2424.69 0.00


0.00 37.00 0.00
3,194.80

35.00 775.38 27138.30


117.76 29.27 3446.84 1.55
60.80 2424.69 147421.15
0 37 0.00 2.64
178,006.29
ф of bar
572.00 775.38 443517.36 6
960.00 29.27 28099.20 43.20
0.00 1200.00 0.00 16.36
768.00 2424.69 1862161.92
0.00 37.00 0 21.05 7.1302 14
2,333,778.48

552.96 29.27 16,185.14

153.58 200.00 30,716.00


307.20 1619.00 497,356.80
544,257.94

0.47 2424.69 1146.88 0.43


19.54 37.00 722.83 0.17 4.69
1,869.71 20
0.888
1.1
0.47 2424.69 1139.60
29.54 37.00 1092.98
2,232.58
1.49
0.60 775.38 465.23
1.50 29.27 44.02 1.88
8.40 1200.00 10080.00 12.19
0.24 1549.01 371.76 0.88
28.56 169.15 4830.92
10,961.01

0.60 775.38 465.23


2.09 29.27 61.17 1.90
8.40 1200.00 10080.00
0.24 1549.01 371.76
28.56 169.15 4830.92 7,200,000.00
10,978.16

19.90 775.38 15430.06 7.01


417.15 29.27 12209.98 5.80
126.69 43.00 5447.67
8.65 1549.01 13402.03
247.20 1200.00 296640.00 7.97
129.78 169.15 21952.29 108.68
365,082.03

44.20 775.38 34271.80


334.65 29.27 9795.21
157.14 43.00 6757.02
8.15 1549.01 12621.33
232.80 1200.00 279360.00
122.22 169.15 20673.51
363,478.87

9.50 775.38 7366.11


130.20 29.27 3810.95 30.00
75.60 43.00 3250.80 2.61
3.50 1549.01 5421.54
79.80 1200.00 95760.00 2.90
115,609.40

9.50 775.38 7366.11


119.56 29.27 3499.52 10.27
58.80 43.00 2528.40 4.46
3.50 1549.01 5421.54
79.80 1200.00 95760.00
114,575.57

0.80 2424.69 1939.75 10.00


21.31 37.00 788.54 1.20
2,728.30 0.89

5.00 0.42
0.40 2424.69 969.88 2.20
3.73 37.00 138.00 0.89
1,107.87 9.79
2 20000.00 40000.00 3.50

2 20000.00 40000.00 0.89

80000.00 0.60

4,708,539.66
Weir
Area of Cyclopean concrete 5.3 Length of weir 19.75
Area of capping 4.02
Length of rienforcement for Capping 12.55

Area of concrete 0.6 Length of breast wall 1


Area of C7 concrete #REF!
Length of reinforcement 2

Divide Wall
Area of Cyclopean concrete 4.5 Length of divide wall 1
Length of rienforcement for Capping 10.53
density Kg/m
0.222 #REF!

1.209

Excavation

0-20 94.28 20.80 2.80


20-45 137.27 26.00 3.50
45-202.72 1098.62 135.95 0.00
2.39 0.35
1.571
1.571
cutt off 0.3 1 0.3

exva 0.31 4.1 1.271


lean concrete 0.2 4.1 0.82
cyclopean co 2.9 4.1 11.89
cc 0.54 0.2 0.108 0.216
1 calculation of bars

length 1.3
width 1
dis no of bar length -2*covery/spacing b/n bar 1 7.1 5
log " width-two sides covery/spacng 1 5.6 4
length of balon end to end weir length -twosides of covery +2*hooks*Ǿ 1.436
length of babardis. = widht of weir -two sides of coveryb +2* hooks 1.136

Ǿ area lenth volume no bar total V deinsity mass kg


dis 12 113.04 1436 162325.4 6 0.000974 7850 7.6
lon 12 113.04 1136 128413.4 7 0.000899 7850 7.1
0
left side wing wall
Excavation a l

u/s 7.47 10.16 75.8952


d/s 5.97 10.84 64.7148 140.61

Back fill 0
u/s 36.2324
d/s 43.854 80.0864
Masonry 0
u/s 3.91 9.16 35.8156 7.47 74.06
d/s 1.82 9.84 17.9088 53.7244 33.04
Lean concrete 0
u/s 0.42 9.16 3.8472
d/s 0.3 9.84 2.952 6.7992 59.92
plastering 0 30.4
d/s u/s 40.5788 3.91 44.4888 10.8
d/s 30.1104 1.82 31.9304 76.4192
11.6

Rightside u/s 5.16 10.16 52.4256

Excavation 1.1 10.16 11.176 20.6068


4.1 10.84 44.444 63.6016
d/s 0.87 10.84 9.4308 96.8696
Back fill 53.8748 117.4764
u/s 23.9388
d/s 33.014 56.9528

Masonry 0
u/s 3.91 9.16 35.8156
d/s 1.82 9.84 17.9088 53.7244
Lean concrete 0
u/s 0.42 9.16 3.8472
d/s 0.3 9.84 2.952 6.7992 60.5236 56.9528
plastering 0
d/s u/s 43.2352 3.91 47.1452
d/s 30.1104 1.82 31.9304 79.0756

3.94
9.7 28.227
32.167
5.333333
4.333333

15.29106
14.11264
14.7 29.40369
104.46
43.84

71.52
BILL NO-3 Irrigation Infrastructure
S/no Quantity
Item of
Unit rate
Item of work discription work
(et.birr)
discription

B. Irrigation Infrastructure
1 Right side Main Canal
1.1 Earth work
Clearing and Stripping of the area to remove m2 2133.60 12
1.1.1 vegetables & trees, if any and top soil
Canal Left and Right side Bank Excavation of Soil
material as per the lines and grades shown in the
drawing and disposal of surplus material and
m3 4941.83 36.05
1.1.2 spreading, free haul less than 1000m
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
trimming and shaping, free haul 1000m m3 6.11 66.01
including compaction on 250mm layers and
1.1.3 proctor test
Install Intake pipe of length 45.6m and Ø50cm
with two man holes @ the center and end LS 1.00 9700.00
position of pipe.
1.2
1.3 Masonry work for lining including plastering m3 1402.22 1239.80
Sub total
Left side Main Canal
2
Earth work
2.1

Clearing and Stripping of the area to remove m2 1230.12 12.00


2.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 2349.10 36.05
spreading, free haul less than 1000m
2.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
trimming and shaping, free haul 1000m m3 1.30 66.01
including compaction on 250mm layers and
proctor test
2.1.3
Install Intake pipe of length 41.9m and Ø50cm
with two man holes @ the center and end LS 1.00 9570.00
2.2 position of pipe.
2.3 Masonry work for lining including plastering m3 814.20 1239.80
Sub total
3 Right side SC-1
3.1 Earth work

Clearing and Stripping of the area to remove m2 630.00 12.00


3.1.1 vegetables & trees, if any and top soil
Canal Left and Right side Bank Excavation of Soil
material as per the lines and grades shown in the
drawing and disposal of surplus material and
m3 138.60 36.05
spreading, free haul less than 1000m
3.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
trimming and shaping, free haul 1000m m3 156.64 66.01
including compaction on 250mm layers and
proctor test
3.1.3
Sub total
4 Right side SC-2
Earth work
4.1
Clearing and Stripping of the area to remove m2 702.00 12.00
4.1.1 vegetables & trees, if any and top soil
Canal and Left and Right side Bank Excavation of
Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 262.51 36.05
4.1.2 spreading, free haul less than 1000m
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including m3 121.77 66.01
trimming and shaping, free haul 1000m
including compaction on 250mm layers and
4.1.3 proctor test
Sub total
5 Right side TC-1
5.1 Earth work
Clearing and Stripping of the area to remove
m2 1134.00 12.00
5.1.1 vegetables & trees, if any and top soil
Canal and Left and Right side Bank Excavation of
Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 586.96 36.05
spreading, free haul less than 1000m
5.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
trimming and shaping, free haul 1000m m3 1.40 66.01
including compaction on 250mm layers and
proctor test
5.1.3
Sub total
6 Right side TC-2
6.1 Earth work
Clearing and Stripping of the area to remove
m2 1080.00 12.00
6.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 97.03 36.05
spreading, free haul less than 1000m
6.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
trimming and shaping, free haul 1000m m3 258.54 66.01
including compaction on 250mm layers and
proctor test
6.1.3
Sub total
7 Left Side SC-1
7.1 Earth work
Clearing and Stripping of the area to remove
m2 2.71 12.00
7.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 1.63 36.05
spreading, free haul less than 1000m
7.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
7.1.3 trimming and shaping, free haul 1000m m3 0.00 66.01
including compaction on 250mm layers and
proctor test
7.2 Masonry work for lining with plastering m3 4.34 1239.80
Sub total
8 Left Side SC-2
8.1 Earth work
Clearing and Stripping of the area to remove
m2 621.00 12.00
8.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 147.00 36.05
spreading, free haul less than 1000m
8.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
8.1.3 trimming and shaping, free haul 1000m m3 147.69 66.01
including compaction on 250mm layers and
proctor test
Sub total
9 Left Side TC-1
9.1 Earth work
Clearing and Stripping of the area to remove
m2 820.80 12.00
9.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 730.09 36.05
spreading, free haul less than 1000m
9.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
9.1.3 trimming and shaping, free haul 1000m m3 0.00 66.01
including compaction on 250mm layers and
proctor test

Sub total
10 Left Side TC-2
10.1 Earth work
Clearing and Stripping of the area to remove
m2 459.00 12.00
10.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 290.61 36.05
spreading, free haul less than 1000m
10.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
10.1.3 trimming and shaping, free haul 1000m m3 0.00 66.01
including compaction on 250mm layers and
proctor test

Sub total
11 Left Side TC-4
11.1 Earth work
Clearing and Stripping of the area to remove
m2 567.00 12.00
11.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 136.75 36.05
spreading, free haul less than 1000m
11.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
11.1.3 trimming and shaping, free haul 1000m m3 39.10 66.01
including compaction on 250mm layers and
proctor test

Sub total
12.00 Right Side Main Drain
12.1 Earth work
Clearing and Stripping of the area to remove
m2 1066.50 12.00
12.1.1 vegetables & trees, if any and top soil

Canal and Left and Right side Bank Excavation of


Soil material as per the lines and grades shown in
the drawing and disposal of surplus material and
m3 200.81 36.05
spreading, free haul less than 1000m
12.1.2
Obtain excavated material from borrow pits and
place as Compacted Fill in Canal and Left and
Right side Bank embankment including
12.1.3 trimming and shaping, free haul 1000m m3 62.85 66.01
including compaction on 250mm layers and
proctor test
Sub total
Total
Total
cost(et.brr)

ф of bar density Kg/m


6 0.222 #REF!
8 0.395

25603.20

178152.86
10 0.617 #REF!

403.45

12 0.888 #REF!

9700.00

1738466.45 14 1.209
1,926,722.77

Excavation

14761.49

84684.92

0-20 94.28 20.80

86.08

20-45 137.27 26.00


9570.00

1009445.16 102.41
1,118,547.65

7560.00

4996.67

10339.61

22896.28

8424.00

9463.66

8038.13

25925.79

13608.00
21159.98

92.09

34860.07

12960.00

3498.00

17066.55

33524.55
0.51
0.64

32.54

58.92

0.00
5379.74
5471.21

7452.00

5299.51

9749.31

22500.81

9849.60

26319.76

0.00

36169.36

5508.00

10476.46
0.00

15984.46

6804.00

4929.98

2580.73

14314.71

12798.00

7239.31

4148.43

24185.75
3,281,103.40
55.090515

165.271545
flume -1
Excavation(

#REF! fill

concrete(c-20)

Masonry

plastering

12Ǿ

2.80 10Ǿ

3.50 lean concrete(c-15)


flume -1

log

11.6

4.64

14.4

dis

lon
flume -2

log

dis

lon
flume-4
exca

mas

con
area length volume
0.54 1.35 0.729

3.6 2 7.2

0.27 12 5.04

2.4 2 4.8

1.11

0.14

1.2

2.45
length
width
dis no of bar length -2*covery/spacing b/n bars

log " width-two sides covery

length of bar dis = lengh log= end to end weir length -twosides of covery +2*hooks*Ǿ

length of bar dis = bar dis. = widht of weir -two sides of coveryb +2*

Ǿ area lenth
10 78.5 5900

10 78.5 600
length
width

dis no of bar length -2*covery/spacing b/n bars

log " width-two sides covery

length of bar dis = lengh log= end to end weir length -twosides of covery +2*hooks*Ǿ
length of bar dis = bar dis. = widht of weir -two sides of coveryb +2*

Ǿ area lenth

10 78.5 14900

10 78.5 1260
1.22 1.2 1.464
1.6 3.24 5.184
2.24 2 4.48

2.3 1.2 2.76

0.25 14.8 7.15

length
dis no of bar
log "
log length of bar dis = lengh log=

length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5
flume-3

length
width
dis no of bar
log "
log length of bar dis = lengh log=

length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5
flume-right

length

width

dis no of bar
log "
log length of bar dis = lengh log=
length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5
flume-right

flume -5
length
width
dis no of bar
log "
log length of bar dis = lengh log=
length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5

flume-6
flume -5
length
width
dis no of bar
log "
log length of bar dis = lengh log=
length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5
0.6 0.75
0.9 0.6
1.5 1.2 1.95

7.929 3.21 0.9

6.42 1.8

0.5 1.3 1.8

1.8

3.6

0.7

4.3
5.8
0.5
1 39.13333333 39

/spacng 1 3.8 4

5.9

hooks 0.6

volume no bar total V deinsity mass kg


463150 4 0.0018526 7850 14.5

47100 39 0.0018369 7850 14.4


14.8
1.16

1 74.6 75

/spacng 1 6.4 7

14.9
hooks 1.26

volume no bar total V deinsity mass kg

1169650 75 0.08772375 7850 688.6

98910 7 0.00069237 7850 5.4


6.648

7.24

25.6
length -2*covery/spacing b/n bars 1 128.6
width-two sides covery /spacng 1 #REF!
end to end weir length -twosides of covery +2*hooks*Ǿ

widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


25700 2017450 129 0.26025105 7850
#REF! #REF! 7 #REF! 7850

21
1.2
length -2*covery/spacing b/n bars 1 105.6
width-two sides covery /spacng 1 6.6
end to end weir length -twosides of covery +2*hooks*Ǿ

widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


21100 1656350 106 0.1755731 7850
1300 102050 7 0.00071435 7850

13.7

1.04

length -2*covery/spacing b/n bars 1 69.1


width-two sides covery /spacng 1 5.8
end to end weir length -twosides of covery +2*hooks*Ǿ
widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


13800 1083300 70 0.075831 7850
1140 89490 6 0.00053694 7850

12.4
1.2
length -2*covery/spacing b/n bars 1 62.6
width-two sides covery /spacng 1 6.6
end to end weir length -twosides of covery +2*hooks*Ǿ
widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


12500 981250 63 0.06181875 7850
1300 102050 7 0.00071435 7850

17
1.6
length -2*covery/spacing b/n bars 1 85.6
width-two sides covery /spacng 1 8.6
end to end weir length -twosides of covery +2*hooks*Ǿ
widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


17100 1342350 63 0.08456805 7850
1700 133450 7 0.00093415 7850
flume-2

0.23 14.8 3.404

0.72 1.58 1.1376 5.0116

1 1.18 1.18 #REF!


29.08582
29.0 57.92515

1377.262875
694.1 1388.133084

129
7
25.7

#REF!

mass kg
2043.0 4085.941485
#REF!
#REF! #REF!
106
7
21.1

1.3

mass kg
1378.2 2756.49767
5.6
1383.9 2767.712965

70
6
13.8
1.14

mass kg
595.3 1190.5467
4.2
599.5 1198.976658

63
7
12.5
1.3

mass kg
485.3 970.554375
5.6
490.9 981.76967

86
9
17.1
1.7

mass kg
663.9 1327.718385
7.3
671.2 1342.38454
BILL NO-4 Farm structures
S/no Quantity
Item of
Unit rate
Item of work discription work
(et.birr)
discription

C. Drop, Division Box & Turn Out


1 Drop
Drop height=1.5m,1m,0.6m,0.5m & 0.3m
1.1 Total number of drops=30
1.1.1 Lean concrete m2 46.91 80
1.1.2 Masonry work m3
20.55 1200.00
1.1.3 Plastering m2 62.20 170.00
1.1.4 Stone pitching m3 27.22 200.00
Sub total
Division Box
2

2.1 Right side Division Box

2.1.1 Lean concrete m2 10.55 80.00


2.1.2 Masonry m3 6.34 1200.00
2.1.3 Plastering m2 27.73 170.00
2.1.4 Stone pitching m3 5.59 200.00

Gate supply,cutting ,welding and installation


(Min. gate size=0.01m*0.25m, Max. gate =
0.65m*0.65m) *
LS 16.00 450.00
2mm thick sheet metal
*Stiffening angle iron (30*30*4)
*Agle iron for groove(40*40*4)
2.1.5
Sub total
2.2 Left side Division Box
2.2.1 Lean concrete m2 8.13 80.00
2.2.2 Masonry m3 4.89 1200.00
2.2.3 Plastering m2 19.05 170.00
2.2.4 Stone pitching m3 3.74 200.00

Gate supply,cutting ,welding and installation


(Min. gate size=0.01m*0.25m, Max. gate =
0.65m*0.65m) *
LS 11.00 450.00
2mm thick sheet metal
*Stiffening angle iron (30*30*4)
2.2.5 *Agle iron for groove(40*40*4)
Sub total
3 Turn Out

2.24 80.00
3.1 Lean concrete m2

8.18 1200.00
3.2 Masonry m3
3.3 Plastering m2 43.64 170.00
3.4 Stone pitching m3 16.18 200.00
Gate supply,cutting ,welding and
installation (Min. gate size=0.21sq.m Max.
gate = 0.63sq.m) * 2mm
thick sheet metal *Stiffening 6.00 450.00
angle iron (30*30*4) *Agle iron for
groove(40*40*4)
3.5 LS
Sub total
Total
Total
cost(et.brr)

ф of bar density Kg/m


6 0.222 #REF!
8 0.395

3753.00 2.34562626
24659.56 3518.44 10 0.617 #REF!
10574.25 12 0.888 #REF!
5443.60 14 1.209
44,430.41

Excavation

844.00
7605.79 0-20 94.28 20.80
4714.44 20-45 137.27 26.00
1118.20

7200.00

21,482.43

650.40
5865.74
3238.16
747.25

4950.00
15451.55

179.20

9810.00

7419.23
3236.70

2700.00

23345.13
104,709.52
55.090515

165.271545
flume -1
Excavation(

#REF! fill
concrete(c-20)
Masonry

plastering

12Ǿ

2.80 10Ǿ
3.50 lean concrete(c-15)

flume -1

log
11.6

4.64

14.4
area length volume
0.54 1.35 0.729

3.6 2 7.2
0
0.27 12 5.04
2.4 2 4.8

1.11

0.14

1.2
2.45

length
width
dis no of bar length -2*covery/spacing b/n bars
log " width-two sides covery
length of bar dis = lengh log= end to end weir length -twosides of covery +2*hooks*Ǿ

length of bar dis = bar dis. = widht of weir -two sides of coveryb +2*
log length of bar dis = lengh log=
length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5
flume-right

flume -5
length
width
dis no of bar
log "
log length of bar dis = lengh log=
length of bar dis = bar dis. =

Ǿ area
dis 10 78.5
lon 10 78.5

flume-6
flume -5
length
width
dis no of bar
log "
log length of bar dis = lengh log=
length of bar dis = bar dis. =
Ǿ area
dis 10 78.5
lon 10 78.5
0.6 0.75
0.9 0.6
1.5 1.2 1.95

7.929 3.21 0.9


6.42 1.8
0.5 1.3 1.8

1.8

3.6

0.7
4.3

5.8
0.5
1 39.13333333 39
/spacng 1 3.8 4
#REF!

hooks #REF!
end to end weir length -twosides of covery +2*hooks*Ǿ
widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


#REF! #REF! 70 #REF! 7850
#REF! #REF! 6 #REF! 7850

12.4
1.2
length -2*covery/spacing b/n bars 1 62.6
width-two sides covery /spacng 1 6.6
end to end weir length -twosides of covery +2*hooks*Ǿ
widht of weir -two sides of coveryb +2* hooks

lenth volume no bar total V deinsity


12500 981250 63 0.06181875 7850
1300 102050 7 0.00071435 7850

17
1.6
length -2*covery/spacing b/n bars 1 85.6
width-two sides covery /spacng 1 8.6
end to end weir length -twosides of covery +2*hooks*Ǿ
widht of weir -two sides of coveryb +2* hooks
lenth volume no bar total V deinsity
17100 1342350 63 0.08456805 7850
1700 133450 7 0.00093415 7850
flume-2

0.23 14.8 3.404


0.72 1.58 1.1376 5.0116

1 1.18 1.18 #REF!


#REF!
#REF!

mass kg
#REF! #REF!
#REF!
#REF! #REF!

63
7
12.5
1.3

mass kg
485.3 970.554375
5.6
490.9 981.76967

86
9
17.1
1.7
mass kg
663.9 1327.718385
7.3
671.2 1342.38454