Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Menu Engineering Worksheet Example Step 2.2

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

MENU ENGINEERING WORKSHEET

Restaurant name: Jamaica Restaurant Starters


Period:
May 2021 – July 2021
A B C D E F G
Item's
Menu Item No. Items Gross Menu Costs
Menu Mix Item's Profit
food
% Sales Price
Sold cost (E - D) (D x B)

Sunshine Tomato
43 1.99% $ 1.82 $ 6.50 $ 4.68 $ 78.26
Soup

Buffalo Wings 450 20.83% $ 2.40 $ 7.50 $ 5.10 $ 1,080.00


Jamaican Patties 287 13.29% $ 2.10 $ 7.95 $ 5.85 $ 602.70
Fried Calamari 550 25.46% $ 2.46 $ 8.95 $ 6.49 $ 1,353.00
Spinach and
125 5.79% $ 2.21 $ 6.50 $ 4.29 $ 276.25
Artichoke Dip
Chilli Mussel Pot 375 17.36% $ 3.02 $ 8.95 $ 5.93 $ 1,132.50
Grilled Bacon
330 15.28% $ 2.68 $ 8.95 $ 6.27 $ 884.40
Poppers
N I
100%
Column totals: 2160 $ 5,407.11
Additional information: K
Total revenue costs and food cost %

Menu Costs $ 5,407.11


Menu revenues $ 17,980.90
Food cost% 30.07%
O
Average Gross Profit Margin

Menu Gross Profit $ 12,573.79


Number sold $ 2,160.00
Average gross profit
$ 5.82
margin
WORKSHEET

Date:
14/8/2021
H L P R S

Menu
Menu
Menu Gross Gross Profit Item
Revenues (E
Profit (F x B) Categories Classific
x B)
ation

$ 279.50 $ 201.24 L L Dog

Plow
$ 3,375.00 $ 2,295.00 L H
Horse
$ 2,281.65 $ 1,678.95 H H Star
$ 4,922.50 $ 3,569.50 H H Star
$ 812.50 $ 536.25 L L Dog
$ 3,356.25 $ 2,223.75 H H Star
$ 2,953.50 $ 2,069.10 H H Star
J M
$ 17,980.90 $ 12,573.79
Q
ood cost % 1 divided by no. of items on
menu x 70

10.00

Margin

You might also like